HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture > Completed Project Threads Archive


    111 South Main in the SkyscraperPage Database

Building Data Page   • Comparison Diagram   • Salt Lake City Skyscraper Diagram

Map Location

 

 
Thread Tools Display Modes
     
     
     
     
  #1  
Old Posted Oct 1, 2013, 2:28 PM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,587
SALT LAKE CITY | 111 S. Main | 387 ft. | 24 floors

Downtown - 111 South Main












________________________________________________________Utah Performing Arts Center and 111 Tower


_____________________________________________
_____________________________________________Utah Performing Arts Center & 111 Tower



________ ...Lead architects, Cesar Pelli and Mitch Hirsch explained in detail the design, which will include a three-balcony, opera house configuration for the seating area and a large,
________four-story “Winter Garden” lobby with glass exterior facing Main St. They also touted the fact that the theater building will have no “back”. With pedestrian passages from Main St. to Regent St,
________a public plaza in front of the truck loading docks, and a rejuvenated Regent St full of nightlife and daytime action, the NPAC will be a driving force in activating downtown, on the blocks to
________the immediate south of the spectacular new City Creek Center...


____
____utahperformingarts.wordpress.com


.

Last edited by delts145; Jul 21, 2015 at 2:33 PM.
     
     
  #2  
Old Posted Oct 2, 2013, 3:52 AM
DZH22 DZH22 is offline
Registered User
 
Join Date: Aug 2009
Location: Boston
Posts: 1,481
They should tack on another 100-200' and make this the new tallest in the city.
     
     
  #3  
Old Posted Nov 25, 2013, 3:02 PM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,587
Quote:
Originally Posted by DZH22 View Post
They should tack on another 100-200' and make this the new tallest in the city.
We all wish they would break the proverbial glass ceiling in Salt Lake. Right now the main focus for this booming Metropolis is Streetscape, Urban Vibrancy and Mass Transit, which of course no one is going to complain about. The big positive is that Salt Lake City is easily becoming one of the prettiest CBDs on the No. American Continent. Hopefully, the upcoming towers over these next ten years will gradually increase in height as the available space becomes scarcer.

Last edited by delts145; Sep 5, 2014 at 11:48 AM.
     
     
  #4  
Old Posted Nov 9, 2013, 1:19 PM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,587
Downtown Update - 111 S. Main

Quote:
Originally Posted by SLC Projects View Post
Demo starts at the first of the new year. But in the mean time we will start to see the trees and other things cleared out along the sidewalk and I'm guessing within the coming weeks we will start seeing the temp. wooden sidewalks go in.

Quote:
Originally Posted by gusam26 View Post
Pic By Gusam26

.

Last edited by delts145; Mar 10, 2014 at 6:07 PM.
     
     
  #5  
Old Posted Nov 25, 2013, 2:29 PM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,587
Downtown - Latest Updates - Utah Performing Arts Center & Tower



UPAC Broadway-Style Theater portion of upcoming development

UtahPerformingArtsCenter


Quote:
Originally Posted by ToysNoiz View Post

I visited the corner of 1st South and Main. It's official...


The inside is completely cleaned out.

Giant wood fence along a line of "I am moving trees"


Although it'll be a little sad to see these buildings go, we will gain so much
more street interaction and vibrancy with the PAC and tower.
Update Pics By ToysNoiz


Quote:
Originally Posted by T-Mac View Post

111 S Main and Performing Arts Center





This access back alley cutting through the middle of a huge block, will become a vibrant, bustling pedestrian commercial thoroughfare. This street
redevelopment will extend to the south, from the recently completed Regent Street portion of the spectacular new City Creek Center. At the southern
end, this new portion of Regent Street will be connecting The City Creek Center to the new Gallivan Plaza, which is another large public gathering square.









Main Street portion of the upcoming new tower and theater as it appears today.


Update Pics By T-Mac


.

Last edited by delts145; Sep 5, 2014 at 11:48 AM.
     
     
  #6  
Old Posted Nov 28, 2013, 12:53 PM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,587
Quote:
Originally Posted by ToysNoiz View Post

Here are some new renderings of 111's lobby from the 111 Main Blog.





Ground floor plan



http://111mainblog.wordpress.com/abo...-the-building/
......

Last edited by delts145; Mar 10, 2014 at 7:29 PM.
     
     
  #7  
Old Posted Dec 4, 2013, 12:54 AM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,587
Quote:
Originally Posted by Future Mayor View Post
I talked with Bruce Bingham, of Hamilton Partners, today and asked him if they were at the 40-45% pre-leased threshold on 111 yet and when they anticipated going vertical on the construction of 111. He said they anticipate being to 40% by spring and that they would be going vertical sometime after that. Obviously they have to wait for all demolition and foundation work to be done. I would estimate they will be going vertical about the same time that the Performing Arts Center will be going vertical.
...............
     
     
  #8  
Old Posted Jan 15, 2014, 12:47 PM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,587
Quote:
Originally Posted by shakman View Post
Ok. So I am only a month behind. Why did the developer change the facade pattern? I thought the angulating curtain wall was an ingenious design which would break the box appearance of the overall structure.

I'm not sure what's going on there Shakman. Everybody is asking, but no one seems to know if they're still fooling around with different ideas, or how accurate the renderings really are. When Hamilton built the 222 tower, the renderings were very mediocre and left everyone worried as to what the finish of the façade was really going to look like. The final product was a huge improvement over the rendering. It would seem that no one on the forum has actually asked Hamilton what their final plan for the curtain wall is...

Hmm... I'm beginning to think that Hamilton, and many of the powers that be decided that the Tower's curtain wall design was clashing too much with the connected new Performing Arts Center, which is being built in conjunction with the Tower. However, I haven't bothered to ask them either. I think everyone just assumes the design is in a state of flux still. Demolition of the existing sites is beginning soon, if not already.


Quote:
Originally Posted by SLC2GeorgetownU View Post

This is the latest renderings of the 111 Main tower, I really like how the lobby has been updated, it looks like a pedestal and the concrete perimeter columns have been removed from the lobby and replaced with multiple slender steel columns, its more elegant and unique. I like this so much better then the previous design, which looked cheesy and didn't fit in with the Theater design in my opinion.





Previous Design

Hamilton Partners

.

Last edited by delts145; Sep 5, 2014 at 11:49 AM.
     
     
  #9  
Old Posted Jan 24, 2014, 1:47 PM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,587
111 Main Tower/UPAC Demolition Site



Quote:
Originally Posted by DMTower View Post

Small update: Demolition for UPAC, from the backside at Regent Street.

Pic By DMTower

.

Last edited by delts145; Jan 25, 2014 at 11:07 AM.
     
     
  #10  
Old Posted Jan 25, 2014, 11:05 AM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,587
111 Main Tower/UPAC Demolition Site

Current Rendering Design of 111 Main Tower


Current Rendering Design of Accompanying Performing Arts Center/Theater

UtahPerformingArtsCenter


Quote:
Originally Posted by DCRes View Post

I noticed the other day that there are currently 5 cranes up in downtown. They are at the ESA hotel, Ballet West/Capital Theater, La Porte, Boyer 101, and Boyer parking garage.

I took a walk around town today at lunch and snaped some pics, enjoy!

111 Main/UPAC Demolition Site











They were dropping debris from the roof
Pics By DCRes

.

Last edited by delts145; May 14, 2014 at 11:51 AM.
     
     
  #11  
Old Posted Feb 14, 2014, 12:39 PM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,587
Downtown Updates - Performing Arts Center & Tower

Quote:
Originally Posted by ajiuO View Post







Pics By AjiuO

.

Last edited by delts145; Mar 10, 2014 at 7:56 PM.
     
     
  #12  
Old Posted Feb 19, 2014, 10:47 PM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,587
Demolition In Prep. For Performing Arts Center & Tower Contd.


Quote:
Originally Posted by ajiuO View Post
.com/3667/12548676994_37302b89ca_b.jpg[/IMG]

[IMG]http://farm4.staticflickr








Looking north at the recently completed City Creek Development


Pics By AjiuO

Last edited by delts145; Mar 11, 2014 at 2:21 PM.
     
     
  #13  
Old Posted Feb 20, 2014, 12:45 AM
shakman's Avatar
shakman shakman is offline
Chairman
 
Join Date: Jun 2002
Location: PRMD - People's Republic of Maryland
Posts: 2,679
The second pic from the bottom is amazing.
__________________
"I measure the value of life not by how much I have, instead by what I have done.

-sb
     
     
  #14  
Old Posted Feb 20, 2014, 12:12 PM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,587
Regent Street Demolition Contd...


Pic By ToysNoiz


.
     
     
  #15  
Old Posted Feb 22, 2014, 6:54 PM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,587
Downtown - Demolition In Preparation For Performing Arts Center & Tower Contd...


Quote:
Originally Posted by jedikermit View Post

Went by the UPAC demolition/construction site yesterday with my boys...cuts all the way through from Regent to Main now.



Pics By JediKermit

.
     
     
  #16  
Old Posted Feb 26, 2014, 12:03 PM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,587
Contd...Demolition In Preparation For Performing Arts Center & Tower


Northwest Corner, Tower Site

Quote:
Originally Posted by gusam26 View Post
Pic By Gusam26


.

Last edited by delts145; May 14, 2014 at 11:52 AM.
     
     
  #17  
Old Posted Mar 3, 2014, 2:28 PM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,587
Continued... Demolition In Prep. For Performing Arts Center & Tower

Quote:
Originally Posted by ajiuO View Post

















and you know that i have to post at least one photo of my favorite place, Eat--Burger!!! I wanted to get more but my phone was almost dead... the cracks on the other side of the building are a lot worse.. this is the better side

Pics By AjiuO

.
     
     
  #18  
Old Posted Mar 7, 2014, 11:49 AM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,587
Demolition & Prep. Continued...

Quote:
Originally Posted by DCRes View Post

Taken from Regent Street yesterday. I call it the Wreckage on Regent

Pic By DCRes


.
     
     
  #19  
Old Posted Mar 8, 2014, 11:26 AM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,587
Downtown, Demolition Prep. for Tower and Performing Arts Center

Quote:
Originally Posted by DCRes View Post

Pic taken 03/04/2014

Pic By DCRes

.
     
     
  #20  
Old Posted Mar 8, 2014, 1:51 PM
ATLksuGUY's Avatar
ATLksuGUY ATLksuGUY is offline
FriskyDingo
 
Join Date: Sep 2006
Location: Virginia
Posts: 565
Awesome pics man. Thanks for keeping up with the progress! It's been a while since I have been to SLC, these pics bring me back. Question:Is that "Eat--Burger". being demolished as well? The cracks you show look pretty bad, and I assumed it was due to the demolition. Just curious if it is intentional. Thanks man!
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
 

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture > Completed Project Threads Archive
Forum Jump



Forum Jump


All times are GMT. The time now is 7:50 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.