Quote:
Originally Posted by madog222
System is capable of 75s headways but is constrained from terminus station turnarounds. Ignoring that constraint, operating at 75s would not be practical as it leaves no room for delays.
|
ahh okay, that makes sense.
Quote:
Originally Posted by logan5
I recall someone saying (awhile ago) that the limiting factor for Expo Line headways was the switchover at Waterfront - terminus station. When the Expo Line runs up Hastings, with a branch line to North Van, headway capabilities could be reduced significantly.
|
hmm. is that because they have to leave the station going east, to double back going west? im not sure how that whole station works. i've taken the Expo-Line 2x in my life.

but im a big fan of SkyTrain, great technology. i am glad we got it back in the 1980s, and stuck with it.
i still think every station renovation should upgrade platform lengths to handle 6 car trains. that way in 25yrs when its needed, we will be ready.