HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Mar 8, 2025, 11:14 PM
VancouverOfTheFuture's Avatar
VancouverOfTheFuture VancouverOfTheFuture is offline
Registered User
 
Join Date: Apr 2014
Posts: 3,481
Quote:
Originally Posted by madog222 View Post
System is capable of 75s headways but is constrained from terminus station turnarounds. Ignoring that constraint, operating at 75s would not be practical as it leaves no room for delays.
ahh okay, that makes sense.

Quote:
Originally Posted by logan5 View Post
I recall someone saying (awhile ago) that the limiting factor for Expo Line headways was the switchover at Waterfront - terminus station. When the Expo Line runs up Hastings, with a branch line to North Van, headway capabilities could be reduced significantly.
hmm. is that because they have to leave the station going east, to double back going west? im not sure how that whole station works. i've taken the Expo-Line 2x in my life. but im a big fan of SkyTrain, great technology. i am glad we got it back in the 1980s, and stuck with it.

i still think every station renovation should upgrade platform lengths to handle 6 car trains. that way in 25yrs when its needed, we will be ready.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 10:05 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.