Quote:
Originally Posted by VancouverOfTheFuture
i thought 72 second headways could be done?
|
I recall someone saying (awhile ago) that the limiting factor for Expo Line headways was the switchover at Waterfront - terminus station. When the Expo Line runs up Hastings, with a branch line to North Van, headway capabilities could be reduced significantly.