Quote:
Originally Posted by logan5
The Hastings line will be built within 30 years. I'd be willing to bet 100 Costco hot dogs on it.
|
i dont see it. i think thats too ambitious. though since the 1980s, we have gotten a major SkyTrain expansion every decade.
Quote:
Originally Posted by Sheba
I think you're putting too much time between the lines. I could potentially see this (with the first two being built at the same time):
- #1 - Burnaby Mountain Gondola (early 2030's)
- #1 - UBCx (early 2030's)
- #2 - Purple-Line (late 2030's)
- #3 - UBCx; -> 41st; -> Metrotown (loop from UBCx - Purple-Line) (early 2040's)
- #4 - Hastings-Line (2050)
Don't forget the Poco Extension off of Coquitlam Central and a King George Blvd Line (prob done in phases).
|
that seems very ambitious. i just dont see that timeline happening. i could agree with the Burnaby Mountain Gondola + UBCx timeline, though. those should have been done already and i do think there is an appetite for them ASAP. but the Purple-Line would cost an insane amount of money, and i dont see it being built in the next 15yrs. they havent done any business case, no confirmed route planning, etc. the cost of it would have to be in the 10s of billions.
we just dont get the same $$$ that the east gets to throw at projects like they do.
Quote:
Originally Posted by madog222
A Hastings Line, as Skytrain, is complete fantasy currently and for decades to come. Transport 2050 shows Hastings as at grade (likely BRT).
|
i agree with that. i just dont see a Hastings-Line high on the list. though with these new provincial rules, anything can happen i suppose. but i just dont see it.
Quote:
Originally Posted by madog222
I agree with this timeline with the available information, though BMG could easily be done before 2030. We should hear more concrete plans about UBCx and the Purple Line over the next few years.
|
i would like that timeline, but im skeptical. (not BMG, UBCx) but the other projects are huge $$$ investments. i just dont see them coming before 2050. though i would love to be wrong, im a huge fan of SkyTrain and i think a strong, robust, comprehensive network is a must have.
i just wish we would get express tracks...

i have always wanted express tracks.
interesting fact i found out was the the longest single-seat-ride on the NYC Subway is 52km. and ours, the Expo from Langley, would be 45km. and NYC has express tracks.
the UBCx -> 41st -> Metrotown + Purple-Line would be like 41km.
though i know we wont ever get express tracks.

i still think 6 car train platforms should be done. but even the broadway subway is only 82m platforms.