Migrant_Coconut
Active member
I think what's going to happen is staggered construction. So we can expect Phase 1 (Waterfront-Kootenay, Lonsdale-Metrotown) by the 2040s at the latest, but Phases 2 and 3 (Kootenay-Kensington, Lonsdale-Park Royal, Metrotown-Kerrisdale) will have to wait another decade or two.