Update, The Sugar House District - The IZZY North & IZZY South Project
Taylor Anderson Reporting @ BuildingSaltLake.com
December, 2020...On 2100 South, near 600 East, a developer received approval for slightly more height (mainly for the building’s design) to replace two existing car-oriented businesses with mid-density housing...
...Given its proximity to the S-Line, as well as well-serviced bus and bike routes, is seeing added density west of 700 East and on both sides of 2100 South. The developer is also building Izzy North directly across from Izzy South on 2100 So. They’re providing 58 parking stalls for 71 housing units, more than 36-stall minimum for CB properties within a quarter-mile of transit.
The rendering shows people biking on the sidewalk, (which is an accurate depiction, as the city has resisted anything but a car-only 2100 South). The project would eliminate three of four existing curb cuts.
Izzy South would add 71 housing units along 2100 South near 600 East. Photo courtesy of Salt Lake City Planning.
A rendering showing Izzy South and its twin on the north side of 2100 South in Sugar House and Liberty Wells. Photo courtesy of Salt Lake City Planning.

September 26, 2021
Izzy South at 534 E 2100 South, brought High Boy Ventures and ajc architects in front of the commission for the second time, responding to comments that their building materials were not differentiated enough at first submission. Their modifications were largely praised by commissioners, who also required the proposed EIFS finishes on the third-floor terraces be replaced by cement board, a more durable material.
The project sits on CB Community Business zoning, and needed to enter design review for three feet of increased height (to 33 ft) and a gross square footage greater than 15,000 sf.
The developers plan a mirror building directly across the street, on the north side of 2100 South.
May 20, 2022 - Construction Schedule Update For Izzy North and South
Updates as of May 20, 2022
- Project description: 2-70+ unit residential, townhomes and single floor, with small commercial component on west end, ground floor.
Project Location: 550 E./2100 S.
- Excavation work has been completed on both the north and south sites.
- Foundations are now formed on the north site. A permit is being issued to allow for the closure of the outside, WB lane on 2100 S., between 500/600 East, to accommodate utility installations for the Izzy North project. This closure has been briefly delayed, but will exist for approximately 5-6 weeks
- (Start-up is now estimated to be end of May/early June). The traffic shift will begin just west of the 700 East intersection, opening back up just before the 500 East intersection.
- Completion: Fall of ’23.
June 1, 2022
Here is the almost complete parking structure on a multi family project we're doing with @newstargc on 2100 S in Salt Lake City called Izzy. This view is of the North side, a mirror development directly across the street has also been started. All together, there will be 213 units added to the "Sugarhood" as its called by locals.
Photo By JPElectrical
January/February, 2023
Photo By Jeff Pettit
President at New Star General Contractors
.