Quote:
Originally Posted by madog222
Y
There was a feasibility study for Stadium-Chinatown last year for three options. Translink is currently working on selecting the prefered design according to the 2023 Business Plan. Unless I'm forgetting something Stadium looks to be the next to happen following Brentwood.
|
I guess that may include a walkway extension over Expo Blvd?