HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


View Poll Results: Would you like to separate this thread for individual station projects?
Yes 19 31.15%
No 42 68.85%
Voters: 61. You may not vote on this poll

Reply

 
Thread Tools Display Modes
     
     
  #3941  
Old Posted Mar 16, 2023, 2:26 AM
Sheba Sheba is offline
Registered User
 
Join Date: Jan 2015
Location: BC
Posts: 4,595
I spotted a mini trailer at Edmonds Station and was going to come on here and ask if anyone knows what's going on - and then I got an 'occupant' letter from TransLink:
Quote:
Work is expected to begin in March 2023 at Edmonds Station to modify the walkways along the tracks used by our SkyTrain Attendants and the Guideway Intrusion Monitoring System (GIMS)...
Overnight work so I'm glad I don't live next door to the station.
Reply With Quote
     
     
  #3942  
Old Posted Mar 17, 2023, 1:25 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,778
Quote:
Originally Posted by Lexus View Post
TransLink exploring major renovations for SkyTrain's 22nd Street and Gateway stations

https://dailyhive.com/vancouver/translin...TvP8ZPdf3zvm8qfNItubC7bHIwmlk9H2KvntRDi8
Maybe they'll reinstate the south entrance to Gateway Station?
But it will now have to have a ticketing hall with faregates.
Reply With Quote
     
     
  #3943  
Old Posted Mar 17, 2023, 3:42 AM
VancouverOfTheFuture's Avatar
VancouverOfTheFuture VancouverOfTheFuture is offline
Registered User
 
Join Date: Apr 2014
Posts: 3,481
Quote:
Originally Posted by officedweller View Post
Maybe they'll reinstate the south entrance to Gateway Station?
But it will now have to have a ticketing hall with faregates.
would there be benefits in an exit-only part there? it would negate the need for larger works. i know NYC has/had some of those on their subway system. i dont know anything about SkyTrain SoF. someone here will know better than i.
Reply With Quote
     
     
  #3944  
Old Posted Mar 17, 2023, 9:45 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,778
With more developments to the south, they'd probably want another entrance.
Reply With Quote
     
     
  #3945  
Old Posted Mar 17, 2023, 1:56 PM
SpongeG's Avatar
SpongeG SpongeG is offline
Registered User
 
Join Date: Jun 2006
Location: Coquitlam
Posts: 40,114
Use gateway quite often now, it has one set of stairs and one up escalator with so many developments coming more stairs etc will be needed, when the escalator is down as it was not too long ago having to use the stairs for both up and down was tight, it's not a very wide staircase.
__________________
belowitall
Reply With Quote
     
     
  #3946  
Old Posted Mar 17, 2023, 2:31 PM
SFUVancouver's Avatar
SFUVancouver SFUVancouver is online now
Registered User
 
Join Date: Dec 2006
Location: Hamilton
Posts: 6,726
I just wanted to take a moment to comment on how impressive it is that Translink is continuously making well-considered and effective investment in capacity upgrades through continual train purchase orders and a substantial station modernization program. These aren't always ribbon cutting-type investments that garner headlines, but rather the mostly invisible investments into incremental improvements that let the system continuously grow and avoid the worst effects of 'success' (i.e. your stations are terrifying because they're so overcrowded).

In retrospect, my peak transit using years in Vancouver (generally late-90s through mid/late-2010s) were a period of minimal investment in station upkeep and modernization (because limited capital funds were rightly going into system expansion: Millennium Line and Canada Line). We were still benefiting from the initial round of investment in the Expo Line and I clearly recall how big a deal it was to have Translink's expansion funding cut out from underneath it by the BC Liberal government, leading to a lost decade of wrangling to find some way to pay for expansion and increasingly needed reinvestment in all aspects of the transit system. Good choices were made along the way, like the renewal of the trolley fleet, major investment in articulated buses, new B-Line routes, and obviously the investments in the Millennium and Canada Lines. But those old Skytrain cars were getting janky and the first-gen Expo Line stations were already past-due for repairs and upgrade.

Looking from afar in Hamilton, where transit is stuck in a 1960s mindset, I cannot overstate how impressive the current Translink system appears, let alone its near-term future incarnation. Out here, the Hamilton Street Railway (our transit 'agency') is just another city department, seemingly without mandate to improve or the slightest ambition for it to be anything other than a municipal service provider that runs buses on routes, little different than how waste management runs its garbage and recycling trucks. In the local press and seemingly a fair part of the community, there is still handwringing about whether it was a good idea to accept a free $3.5 billion-plus dollar crosstown LRT line, with a very solid alignment terminating in the west at McMaster University, running through the CBD with a one-block walk to the downtown GO station, and an eastern terminus way out near the city limits at our second largest mall.

Anyway, good on Translink. I take great satisfaction in knowing things are headed in the right direction out west.
__________________
VANCOUVER | Beautiful, Multicultural | Canada's Pacific Metropolis

Last edited by SFUVancouver; Mar 17, 2023 at 6:20 PM.
Reply With Quote
     
     
  #3947  
Old Posted Mar 24, 2023, 11:08 PM
Hotwax's Avatar
Hotwax Hotwax is offline
Registered User
 
Join Date: Mar 2011
Location: Metro Vancouver
Posts: 184
Reply With Quote
     
     
  #3948  
Old Posted Mar 27, 2023, 3:58 AM
Lexus's Avatar
Lexus Lexus is offline
Registered User
 
Join Date: Jul 2018
Location: Vancouver | BC | Canada
Posts: 2,847
2023, Mar 26

Untitled by Lexus LX600, on Flickr

Untitled by Lexus LX600, on Flickr
Reply With Quote
     
     
  #3949  
Old Posted Mar 27, 2023, 4:28 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,778
Looking good, thanks!
Reply With Quote
     
     
  #3950  
Old Posted Apr 4, 2023, 8:09 PM
Lexus's Avatar
Lexus Lexus is offline
Registered User
 
Join Date: Jul 2018
Location: Vancouver | BC | Canada
Posts: 2,847
2023, Apr 4

Brentwood

Untitled by Lexus LX600, on Flickr

Untitled by Lexus LX600, on Flickr

Untitled by Lexus LX600, on Flickr
Reply With Quote
     
     
  #3951  
Old Posted Apr 10, 2023, 6:04 AM
mcminsen's Avatar
mcminsen mcminsen is online now
Registered User
 
Join Date: Sep 2007
Location: Downtown Vancouver
Posts: 9,980
Quote:
Originally Posted by madog222 View Post
Burrard Station will have the five existing escalators replaced, no layout changes or expansion. Construction starts Oct 17th and scheduled to finish early 2024. Dailyhive says the cost is $14M.

https://www.translink.ca/news/2022/octob...urrard%20skytrain%20station%20escalators




The step lighting on the new escalator at Burrard Station is dazzling!

First pic looking up, second pic looking down.





April 9 '23, my pics


Reply With Quote
     
     
  #3952  
Old Posted Apr 10, 2023, 7:33 PM
madog222 madog222 is online now
Moderator
 
Join Date: Jan 2014
Posts: 4,208
Bright!

Are the reflections that disorienting in person?
Reply With Quote
     
     
  #3953  
Old Posted Apr 10, 2023, 10:48 PM
Mac Write Mac Write is offline
Registered User
 
Join Date: Dec 2008
Posts: 1,423
I am still baffled why they aren't adding a "down" escalator to the outbound platform as that is were a majority of the traffic from the 2 down escalators is coming from.

Also not adding a down escalator from street level to concourse level.
Reply With Quote
     
     
  #3954  
Old Posted Apr 12, 2023, 8:37 PM
Zepfancouver's Avatar
Zepfancouver Zepfancouver is offline
Registered User
 
Join Date: Aug 2017
Location: Vancouver
Posts: 2,656
Capstan Station

Capstan Station This morning April 12, 2023 - Captured from the 10th floor of the International Trade Centre

Talk about smother-love, you think this Skytrain Station will have a good ridership


Full Size https://imgur.com/gallery/ngPx5n4 (the post on Imgur is getting down voted to hell )
Reply With Quote
     
     
  #3955  
Old Posted Apr 28, 2023, 2:20 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,131
From March 2022. Hoping we see some plans for a rebuild soon. I haven't used it myself, but I can imagine transferring between outbound Expo lines must be quite a pain.

Adding a third track and centre platform could be a good solution to improve the station without shutting it down for more than a few evenings and weekends.

Quote:
TransLink acquires Boucher Centre for future SkyTrain Columbia Station upgrade

Kenneth Chan, DailyHive
Mar 22 2022, 5:09 pm


The extent and scope of the planned major overhaul of SkyTrain Columbia Station in downtown New Westminster is hinted at by a recent property acquisition.

TransLink confirmed to Daily Hive Urbanized it has acquired the Boucher Centre property, located immediately south of the station at 435 Columbia Street, for $17.7 million. The purpose of the acquisition of the 17,200 sq ft lot is directly related to the future upgrade of the station.

Records show the deal closed in December 2021.

Few details are available at this time, but the building could conceivably be demolished and redeveloped for an expanded footprint of the station to address its significant capacity and accessibility challenges.

Columbia Station serves as a major interchange hub on the Expo Line for passengers travelling towards Waterfront, Production-Way University, and King George stations. However, when it was designed more than two decades ago, it was not intended to serve as an interchange for multiple train lines, which was a purpose it gained in 2002 when the original looping Millennium Line routing — now exclusively the Expo Line — opened.

Currently, particularly during peak periods, overcrowding can be an issue due to the volume of passengers transferred on the narrow platforms and circulation passageways.

In 2019, Columbia Station saw 1.64 million annual boardings, representing a 2.6% year-over-year increase, making it the 34th busiest SkyTrain station. Average boardings on weekdays reached 5,160, while average boardings on Saturdays and Sundays/holidays reached 3,610 and 2,630, respectively.

An overhaul of Columbia Station is also likely necessary in advance of future extensions of the SkyTrain network, especially the Surrey-Langley SkyTrain project, which would increase the volume of transfers through the station.

TransLink previously told Daily Hive Urbanized that Columbia Station’s upgrades will tackle accessibility, capacity, and customer flow.

In October 2021, after conducting a bidding process, TransLink selected design firm Perkins & Will to conduct architectural, engineering, technical design, site feasibility assessments, and urban planning work for the Columbia Station overhaul. It was stated that the successful proponent would also examine the feasibility of “three side-platform upgrade approaches.”

TransLink is also planning major upgrades for Edmonds Station and Stadium-Chinatown Station.

Earlier this month, the public transit authority announced a $33 million capacity and accessibility upgrade of Brentwood Town Centre Station would begin in April, with completion targeted for 2024.
https://dailyhive.com/vancouver/435-colu...w-westminster-translink-columbia-station
Reply With Quote
     
     
  #3956  
Old Posted Apr 28, 2023, 6:51 PM
madog222 madog222 is online now
Moderator
 
Join Date: Jan 2014
Posts: 4,208
Quote:
Originally Posted by J.OT13 View Post
From March 2022. Hoping we see some plans for a rebuild soon. I haven't used it myself, but I can imagine transferring between outbound Expo lines must be quite a pain.

Adding a third track and centre platform could be a good solution to improve the station without shutting it down for more than a few evenings and weekends.
I don’t think a centre platform is possible, there isn’t much room for track realignment. It will definitely be interesting to see what they come up with.

I’m thinking this will be complete for the Langley extension opening in 2028, hopefully we hear something in the next year or two.

Meanwhile another station renovation has leapfrogged Columbia in the planning process.

Last edited by madog222; Apr 28, 2023 at 7:01 PM.
Reply With Quote
     
     
  #3957  
Old Posted Apr 28, 2023, 8:26 PM
greenturnedblue greenturnedblue is offline
Registered User
 
Join Date: Jan 2018
Posts: 28
Hopefully it is something to do with running the Expo line straight through Waterfront-Langley, and the sapperton-braid segment becomes a spur of the millennium line. Wishful thinking perhaps
Reply With Quote
     
     
  #3958  
Old Posted Apr 28, 2023, 9:03 PM
mcj mcj is online now
Registered User
 
Join Date: Dec 2021
Location: New West
Posts: 1,247
Quote:
Originally Posted by greenturnedblue View Post
Hopefully it is something to do with running the Expo line straight through Waterfront-Langley, and the sapperton-braid segment becomes a spur of the millennium line. Wishful thinking perhaps
And how would you consider doing that? Considering that the 200 metre tunnel between Columbia Station and surface would need to be expanded to isolate the trains.
Reply With Quote
     
     
  #3959  
Old Posted Apr 28, 2023, 9:52 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,778
Quote:
Originally Posted by J.OT13 View Post
From March 2022. Hoping we see some plans for a rebuild soon. I haven't used it myself, but I can imagine transferring between outbound Expo lines must be quite a pain.

Adding a third track and centre platform could be a good solution to improve the station without shutting it down for more than a few evenings and weekends.


https://dailyhive.com/vancouver/435-colu...w-westminster-translink-columbia-station
The article includes this statement about a 3 side-platform configuration:

Quote:
It was stated that the successful proponent would also examine the feasibility of “three side-platform upgrade approaches.”
It really depends whether there is room for an adjacent RoW under the adjacent Clarkson Street).
I think the platforms must be longer than the width of the Boucher Centre property, so the question is whether they would need to acquire more adjacent properties.
Reply With Quote
     
     
  #3960  
Old Posted Apr 28, 2023, 10:02 PM
madog222 madog222 is online now
Moderator
 
Join Date: Jan 2014
Posts: 4,208
I always read that as three approaches as in three designs, not as three platforms, but it's not clearly written.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 9:25 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.