Ottawa construction sites.
99 Fifth Avenue in The Glebe. Minto is preserving the historic retail strip (still open today) and replacing a mini-mall addition at the back with a residential mid-rise.
Quote:
Originally Posted by Glenlivet Ave
It's sufficiently set back that it's not really having an impact walking down Bank Street, but it's coming along. I took the picture from the corner of Bank and Fourth Ave.

|
Quote:
Originally Posted by rocketphish
|
Westgate Shopping Centre redevelopment phase 1.
Quote:
Originally Posted by CapitalCity613
A few construction pics from today.
|
Quote:
Originally Posted by RogueNacho
Here is a full size render of the building, taken from RioCan's website. A little boring but totally inoffensive. What I really hope they do is keep the cylindrical towers shown on Phase 3 of the site plan (Post #74).

|
The Azure at 929 Richmond. Across the street from Stage 2 O-Train tunnel and between two brand-new stations (Sherbourne and New Orchard).
Quote:
Originally Posted by CapitalCity613
I was out today and took a few pictures. Snowy/overcast and not the best day to take photos. I'm not sure the best way to share them, but I've seen people using this postimage website.
|