Quote:
Originally Posted by CityTech View Post
Plus there's the capacity issue. Gathering all service through downtown into Line 1 works because a single train has 5 times more capacity than an 18m bus. This scenario would need R1 to be served with articulated buses leaving Tunneys every 40s. Not realistic at all.
But we already gather all the transitway service downtown on buses, with about that same frequency. They just have different route numbers. I don't see it really making much of a difference. But I doubt OC Transpo would do it anyway.
     
     
  #11122  
Old Posted Jul 9, 2019, 4:19 PM
zzptichka zzptichka is offline
Registered User
 
Join Date: Dec 2015
Location: Outaouias
Posts: 2,399
Entrance to one of the busier LRT stations on a freshly rebuilt street is dedicated to car storage. What an embarrassment.

     
     
  #11123  
Old Posted Jul 9, 2019, 4:28 PM
lrt's friend lrt's friend is online now
Registered User
 
Join Date: Dec 2006
Posts: 12,812
Quote:
Originally Posted by kmcamp View Post
But we already gather all the transitway service downtown on buses, with about that same frequency. They just have different route numbers. I don't see it really making much of a difference. But I doubt OC Transpo would do it anyway.
It sure will make a difference. It isn't Albert/Slater that I am concerned with. Hurdman and St. Laurent will be bigger problems. At the present time, a good portion of buses skip those stations. Since R1 is a single bus route, every bus would have to routed through Hurdman and St. Laurent. With all the issues with OC not being able to retain drivers and overtime costs are ballooning, we could not possibly maintain service levels even to today's standards. R1 is not intended for ongoing service. It is simply a stop gap service that might run for a few hours on only part of the route. We have already been warned that R1 will not be able to maintain service in the event of a system wide failure and heaven forbid, for an extended period of time. This is why they have to make sure that the Confederation Line is running almost perfectly before it opens to the public.
     
     
  #11124  
Old Posted Jul 9, 2019, 4:55 PM
Corvulpes Corvulpes is offline
Registered User
 
Join Date: May 2019
Posts: 50
a

Last edited by Corvulpes; Jul 30, 2019 at 1:34 AM.
     
     
  #11125  
Old Posted Jul 9, 2019, 5:03 PM
Truenorth00 Truenorth00 is online now
Registered User
 
Join Date: May 2017
Posts: 29,120
My only question....

Does nobody in the RTG consortium get the concept of expectation management? Alstom's CEO flies over from France only to provide another missed deadline. How incompetent and dysfunctional is this consortium?

Also, what's with OC Transpo being so gullible on these deadlines. More than anyone they should know how far off RTG is, and stop planning to RTG pledged deadlines.

At this point, it's looking increasingly likely that service won't start until the new year. And is OC Transpo even willing to risk a winter launch?
     
     
  #11126  
Old Posted Jul 9, 2019, 5:20 PM
CityTech CityTech is offline
Registered User
 
Join Date: May 2016
Location: Ottawa
Posts: 2,798
No further deadlines should be taken seriously unless RTG's and Alstom's CEOs are willing to personally put their jobs on the line for them.
     
     
  #11127  
Old Posted Jul 9, 2019, 5:22 PM
CityTech CityTech is offline
Registered User
 
Join Date: May 2016
Location: Ottawa
Posts: 2,798
Quote:
Originally Posted by Corvulpes View Post
They've been doing regular software updates for a while now, it's fairly routine. What's going on today (and this week) is... well. Someone (Thales) decided that when trains are launching and reducing, only one train can be moving at a time. So launching just 10 trains in the morning takes 4+ hours now, and no trains are moving until it's complete. Then after am peak they reduce, and launch again for pm peak, reduce again, and reduce for the night. During all of these times there is a system-wide hold and only one train mobile.

In the same vein, they are only running trains on the regular loop. No other motion is allowed, specifically diversions around broken trains or shorter loops. So if any train is immobilized anywhere on the guideway it's all shut down. All the switches are locked and clamped in tangent except the terminus switch sets. To make matters worse, only one platform is available at end stations. Nobody seems to know why Thales has requested these restrictions, but it's going to be like that all week.
To narrow down test cases perhaps?
     
     
  #11128  
Old Posted Jul 9, 2019, 5:23 PM
waterloowarrior's Avatar
waterloowarrior waterloowarrior is offline
National Capital Region
 
Join Date: Nov 2005
Location: Eastern Ontario
Posts: 9,255
Quote:
Originally Posted by zzptichka View Post
Entrance to one of the busier LRT stations on a freshly rebuilt street is dedicated to car storage. What an embarrassment.
You mean "flex space"

Last edited by waterloowarrior; Jul 9, 2019 at 5:39 PM.
     
     
  #11129  
Old Posted Jul 9, 2019, 5:46 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,131
Quote:
Originally Posted by Corvulpes View Post
They've been doing regular software updates for a while now, it's fairly routine. What's going on today (and this week) is... well. Someone (Thales) decided that when trains are launching and reducing, only one train can be moving at a time. So launching just 10 trains in the morning takes 4+ hours now, and no trains are moving until it's complete. Then after am peak they reduce, and launch again for pm peak, reduce again, and reduce for the night. During all of these times there is a system-wide hold and only one train mobile.

In the same vein, they are only running trains on the regular loop. No other motion is allowed, specifically diversions around broken trains or shorter loops. So if any train is immobilized anywhere on the guideway it's all shut down. All the switches are locked and clamped in tangent except the terminus switch sets. To make matters worse, only one platform is available at end stations. Nobody seems to know why Thales has requested these restrictions, but it's going to be like that all week.
Thanks for the info. So trains could very well have been completed by that July 7th deadline. This is just potentially a new issue.
     
     
  #11130  
Old Posted Jul 9, 2019, 6:15 PM
CityTech CityTech is offline
Registered User
 
Join Date: May 2016
Location: Ottawa
Posts: 2,798
Depends what they meant by "trains".
     
     
  #11131  
Old Posted Jul 9, 2019, 6:31 PM
PHrenetic PHrenetic is offline
Registered User
 
Join Date: Jun 2016
Location: Ottawa
Posts: 1,029
Quote:
Originally Posted by waterloowarrior View Post
You mean "flex space"
Good Day.

     
     
  #11132  
Old Posted Jul 9, 2019, 6:36 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,131
Quote:
Originally Posted by CityTech View Post
Depends what they meant by "trains".
I assumed the physical units. Doors, power, breaking systems and such. The operating system is Thales responsibility, not Alstom's.

It's like saying the HP computer is fixed, but the Windows operating system is still causing us problems.
     
     
  #11133  
Old Posted Jul 9, 2019, 6:45 PM
PHrenetic PHrenetic is offline
Registered User
 
Join Date: Jun 2016
Location: Ottawa
Posts: 1,029
Quote:
Originally Posted by Badyouken View Post
Great shots - Pimisi and Bayview are beautiful stations.

Can't say the same about those SNC renderings...
Quote:
Originally Posted by J.OT13
SNC lost the 2006 bid to Siemens, which was subsequently canceled of course. I assume the winning bid had a similar bare-bones design. I thought it would be interesting to see the contrast between what would have been built in 2006-2009 and what we ended up with, which is much more elaborate, yet takes a whole lot less space.
Good Day.

To be fair, the render was for the 2005-6 NS system, at a LeBreton station design that was in early concept of sharing the lower level under the bridge with both E-W BRT and N-S LRT lines, and bus transfers to Gatineau were still not known as to how they would be (well) handled.
Given that, IMO it was as well designed as the concept plans in 2011 for the present Pimisi E-W LRT C-Line station.

And, lastly, It was possibly still at the point where in the first (Bayview) or second (LeBreton) iteration of the NS Line that was to terminate at LeBreton, with -possible- extension into downtown (let alone to uOttawa).

Remember - the plans and contracting were EXTREMELY 'confidential' (top secret paranoia does not even begin to describe it) in that whole time-frame.

@J.OT13 - if you have any more, it would be so VERY fascinating to see. Big Thanks for those renders.

EnJoy!
     
     
  #11134  
Old Posted Jul 9, 2019, 7:29 PM
Corvulpes Corvulpes is offline
Registered User
 
Join Date: May 2019
Posts: 50
a

Last edited by Corvulpes; Jul 30, 2019 at 1:34 AM.
     
     
  #11135  
Old Posted Jul 9, 2019, 7:50 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,131
Quote:
Originally Posted by Corvulpes View Post
Oooh, definitely not. They're still the same as weeks ago, unfortunately. Still much to do!
So much for trying to be optimistic. Thanks for the update!
     
     
  #11136  
Old Posted Jul 9, 2019, 9:11 PM
lrt's friend lrt's friend is online now
Registered User
 
Join Date: Dec 2006
Posts: 12,812
Another deadline fail???? Maybe its for the best if the launch waits for a proper winter test. Groan!
     
     
  #11137  
Old Posted Jul 9, 2019, 11:26 PM
kmcamp kmcamp is offline
Registered User
 
Join Date: Sep 2016
Posts: 1,401
Quote:
Originally Posted by lrt's friend View Post
Another deadline fail???? Maybe its for the best if the launch waits for a proper winter test. Groan!
At this point I've given up hope that we'll see the confed line open within 2019, and won't be surprised if we don't see it open before the Trillium line shuts down.
     
     
  #11138  
Old Posted Jul 10, 2019, 10:16 AM
OtrainUser OtrainUser is offline
Registered User
 
Join Date: Jul 2017
Posts: 619
Quote:
Originally Posted by kmcamp View Post
At this point I've given up hope that we'll see the confed line open within 2019, and won't be surprised if we don't see it open before the Trillium line shuts down.
I'm pretty sure that's what I predicted many posts ago
     
     
  #11139  
Old Posted Jul 10, 2019, 10:52 AM
kmcamp kmcamp is offline
Registered User
 
Join Date: Sep 2016
Posts: 1,401
Quote:
Originally Posted by OtrainUser View Post
I'm pretty sure that's what I predicted many posts ago
Trying to sum up positivity again, we are seeing only doubles. RTG may actually file for substantial completion again. The trains aren't really ready and the 12 day test will fail. However it might make sense for all involved to move to that stage, as it means we could do handover as soon as it hits the right level of reliability, whereas now there's at least weeks between where they hit the mark and the process allows handover
     
     
  #11140  
Old Posted Jul 10, 2019, 12:36 PM
OCCheetos OCCheetos is online now
Registered User
 
Join Date: Aug 2017
Posts: 2,118
Track work was being done near Hurdman. About a dozen workers on the track with a bunch of propane tanks.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 2:45 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.