Quote:
Originally Posted by Badyouken
Great shots - Pimisi and Bayview are beautiful stations.
Can't say the same about those SNC renderings...
|
Quote:
|
Originally Posted by J.OT13
SNC lost the 2006 bid to Siemens, which was subsequently canceled of course. I assume the winning bid had a similar bare-bones design. I thought it would be interesting to see the contrast between what would have been built in 2006-2009 and what we ended up with, which is much more elaborate, yet takes a whole lot less space.
|
Good Day.
To be fair, the render was for the 2005-6 NS system, at a LeBreton station design that was in early concept of sharing the lower level under the bridge with both E-W BRT and N-S LRT lines, and bus transfers to Gatineau were still not known as to how they would be (well) handled.
Given that, IMO it was as well designed as the concept plans in 2011 for the present Pimisi E-W LRT C-Line station.
And, lastly, It was possibly still at the point where in the first (Bayview) or second (LeBreton) iteration of the NS Line that was to terminate at LeBreton, with -possible- extension into downtown (let alone to uOttawa).
Remember - the plans and contracting were EXTREMELY 'confidential' (top secret paranoia does not even begin to describe it) in that whole time-frame.
@J.OT13 - if you have any more, it would be so VERY fascinating to see. Big Thanks for those renders.
EnJoy!