Civic infrastructure projects:


Quote:
  • That the following projects be approved for consideration by the federal and provincial governments under the first intake of the New Building Canada Fund (NBCF) in the following priority order:
    • Transit Maintenance Facility with an estimated total project costs of $30 million
    • Winnipeg Street Overpass with an estimated total project cost of $28 million
    • Regina Revitalization Initiative – Railyard Renewal with estimated total project costs of $67 million
    • Septage Receiving Station with an estimated total project costs of $10 million
    • Ring Road Victoria Ave overpass with an estimated total project costs of $10 million
    • Buffalo Pound Water Upgrades with an estimated total project costs of $36 million.
    • Albert and Saskatchewan Drive Intersection improvement with an estimated total project costs of $7.5 million.
http://regina.siretechnologies.com/sirepub/mtgviewer.aspx?meetid=859&doctype=AGENDA
     
     
  #2102  
Old Posted Jan 14, 2015, 7:10 PM
North_Regina_Boy North_Regina_Boy is offline
Registered User
 
Join Date: Mar 2010
Location: Regina, SK (formerly Saskatoon)
Posts: 1,474
Quote:
Originally Posted by Stormer View Post
I wonder if the Winnipeg Street overpass is the re-alignment of the bridge to go North South instead of slightly screwed towards the refinery, I can only image that is what it would be at $28M
     
     
  #2103  
Old Posted Jan 14, 2015, 7:15 PM
Stormer's Avatar
Stormer Stormer is online now
Registered User
 
Join Date: Jan 2008
Posts: 7,973
Quote:
Originally Posted by North_Regina_Boy View Post
I wonder if the Winnipeg Street overpass is the re-alignment of the bridge to go North South instead of slightly screwed towards the refinery, I can only image that is what it would be at $28M
yes correct


Quote:
Winnipeg Street Bridge Project
The project involves realigning Winnipeg Street without any jogs which will require a
longer overpass and include improvements to the existing interchange that will support
new residential, commercial and industrial developments, future additional driving lanes
on the Ring Road and the potential for future grade separations at the existing at-grade
railway crossings to the east.
The physical work includes construction of a new overpass, modifications and
realignment of the existing ramps, demolition of the current overpass, relocation of
utilities, various intersection improvements, new traffic signals and all associated works.


Project Category
– Highways and Major Roads Infrastructure

Timeline


– 2015-17 Design, 2017 Construction

Estimated Cost


– $28 million. Funds have been identified in the 5-year capital plan.

National/Regional Benefit


– the project would improve traffic and help to service
commercial properties that provide benefit to the local and provincial economy.


     
     
  #2104  
Old Posted Jan 14, 2015, 9:01 PM
bomberjet bomberjet is online now
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,230
Quote:
Originally Posted by Stormer View Post
Carl's Jr.
Carl's Jr. is awesome, fast food wise anyways.
     
     
  #2105  
Old Posted Jan 14, 2015, 9:17 PM
Robag Robag is offline
Registered User
 
Join Date: Aug 2010
Location: Regina
Posts: 301
They really need to do something about moving the tracks off the Ring Road. On Boxing day, I was heading north with my family over to some friends, when we got stuck because of a train. The train stopped on the tracks with the back end of the train at the edge of the ramp. We were stranded for 20 minutes waiting for this train to move. I think they should be asking for a lot more to re-align those two sets of tracks across the Ring Road.
     
     
  #2106  
Old Posted Jan 14, 2015, 9:21 PM
Treesplease Treesplease is offline
Registered User
 
Join Date: Jul 2011
Posts: 990
Quote:
Originally Posted by Stormer View Post
Given the time horizon for some of these projects (out to 2020 construction) I'm a bit surprised that widening of Sask Drive (broad to winnipeg) and/or Arcola Ave (winnipeg to Vic) isn't part of the plan. Or are there specific criteria that have to be hit to be elligible for NBCF?
     
     
  #2107  
Old Posted Jan 14, 2015, 9:36 PM
Stormer's Avatar
Stormer Stormer is online now
Registered User
 
Join Date: Jan 2008
Posts: 7,973
Quote:
Originally Posted by Treesplease View Post
Given the time horizon for some of these projects (out to 2020 construction) I'm a bit surprised that widening of Sask Drive (broad to winnipeg) and/or Arcola Ave (winnipeg to Vic) isn't part of the plan. Or are there specific criteria that have to be hit to be elligible for NBCF?
I would just be happy if they would clear the snow banks from the curb lane on SK Dr. so there were actually 2 lanes in winter. Victoria between Broad and Wpg is the same.

I see snow removal equipment driving around doing useless touch-ups all the time but they are oblivious to the real issue/hazards.
     
     
  #2108  
Old Posted Jan 14, 2015, 9:46 PM
Stormer's Avatar
Stormer Stormer is online now
Registered User
 
Join Date: Jan 2008
Posts: 7,973
Quote:
Originally Posted by Robag View Post
They really need to do something about moving the tracks off the Ring Road. On Boxing day, I was heading north with my family over to some friends, when we got stuck because of a train. The train stopped on the tracks with the back end of the train at the edge of the ramp. We were stranded for 20 minutes waiting for this train to move. I think they should be asking for a lot more to re-align those two sets of tracks across the Ring Road.
I would agree that this is probably a higher priority, but I think the issue with the Winnipeg St., overpass is that is due for a major scheduled rebuild anyway, so they figure they may as well do it right.

Train traffic has really increased in the last few years. It will probably take a fatal accident to get movement on a grade separation.
     
     
  #2109  
Old Posted Jan 14, 2015, 10:38 PM
North_Regina_Boy North_Regina_Boy is offline
Registered User
 
Join Date: Mar 2010
Location: Regina, SK (formerly Saskatoon)
Posts: 1,474
Quote:
Originally Posted by Stormer View Post
I would agree that this is probably a higher priority, but I think the issue with the Winnipeg St., overpass is that is due for a major scheduled rebuild anyway, so they figure they may as well do it right.

Train traffic has really increased in the last few years. It will probably take a fatal accident to get movement on a grade separation.
I am surprised it hasn't happened for a long time. There have been accidents there in recent years but no fatalities for as long as I can remember.
     
     
  #2110  
Old Posted Jan 14, 2015, 10:47 PM
North_Regina_Boy North_Regina_Boy is offline
Registered User
 
Join Date: Mar 2010
Location: Regina, SK (formerly Saskatoon)
Posts: 1,474
I hope this are doing this, as I posted in the last Regina Construction Thread:

"Also whilst they are fixing Winnipeg they should do this as well. Off / On ramps can cross tracks, but dig a trench and put Ring Road through lanes under the tracks!

Just a thought...

For those of you who are not sure that would work just go drive on Circle Drive South in Saskatoon between Valley Road and Clancy Drive under 11th Street. It is the EXACT same type of construction using MSE (Mechanically Stabilized Earth) retaining walls and Cast-In-Place concrete (even dealing with rail tracks)



Looking North from Under 11th Street (Southbound Lanes):



Image from Google Earth:



Bye bye train issues, hello free-flow traffic Not to mention A LOT safer!"
     
     
  #2111  
Old Posted Jan 14, 2015, 10:59 PM
Stormer's Avatar
Stormer Stormer is online now
Registered User
 
Join Date: Jan 2008
Posts: 7,973
It sounds doable, but could be very expensive and disruptive to the Ring Road during construction. What about sharing the existing grade separation at Winnipeg St.? The tracks could be re-routed along Winnipeg St. N. and reconnect with the CN Qu'Appelle and Lanigan Subs.

[QUOTE=North_Regina_Boy;6874886]I hope this are doing this, as I posted in the last Regina Construction Thread:

"Also whilst they are fixing Winnipeg they should do this as well. Off / On ramps can cross tracks, but dig a trench and put Ring Road through lanes under the tracks!

Just a thought...

For those of you who are not sure that would work just go drive on Circle Drive South in Saskatoon between Valley Road and Clancy Drive under 11th Street. It is the EXACT same type of construction using MSE (Mechanically Stabilized Earth) retaining walls and Cast-In-Place concrete (even dealing with rail tracks)
     
     
  #2112  
Old Posted Jan 14, 2015, 11:02 PM
bomberjet bomberjet is online now
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,230
Question more for the Saskatoon thread. But is Clancy Drive just to the north still at grade intersection with Circle Drive? Seems odd, they spent so much moola to make the rest of Circle Drive in that area free flow (which looks awesome by the way), but left Clancy at grade.
     
     
  #2113  
Old Posted Jan 14, 2015, 11:23 PM
Stormer's Avatar
Stormer Stormer is online now
Registered User
 
Join Date: Jan 2008
Posts: 7,973
Quote:
Originally Posted by bomberjet View Post
Question more for the Saskatoon thread. But is Clancy Drive just to the north still at grade intersection with Circle Drive? Seems odd, they spent so much moola to make the rest of Circle Drive in that area free flow (which looks awesome by the way), but left Clancy at grade.
It's free flow northbound (no through traffic on Clancy) but there are lights southbound to allow turns.

https://www.google.ca/maps/place/Saskato...5304f6bf47ed992b:0x5049e3295772690?hl=en
     
     
  #2114  
Old Posted Jan 14, 2015, 11:35 PM
bomberjet bomberjet is online now
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,230
Damn those left turns!

Just need a single flyover for the southbound lanes. Something similar to this flyover, but straighter and much shorter. Are there any plans for that?
     
     
  #2115  
Old Posted Jan 15, 2015, 3:10 AM
brithgob brithgob is offline
Registered User
 
Join Date: Dec 2006
Posts: 833
Quote:
Originally Posted by bomberjet View Post
Damn those left turns!

Just need a single flyover for the southbound lanes. Something similar to this flyover, but straighter and much shorter. Are there any plans for that?
Doubt it. They use the same type of intersection at Laurier Drive and at Airport Road.
     
     
  #2116  
Old Posted Jan 15, 2015, 4:01 AM
StealthGirl's Avatar
StealthGirl StealthGirl is offline
Registered User
 
Join Date: Jun 2008
Posts: 1,272
Is the Winnipeg Street Bridge the one that trucks seem to get stuck under 4 or 5x a year?
     
     
  #2117  
Old Posted Jan 15, 2015, 4:36 AM
Stormer's Avatar
Stormer Stormer is online now
Registered User
 
Join Date: Jan 2008
Posts: 7,973
Quote:
Originally Posted by StealthGirl View Post
Is the Winnipeg Street Bridge the one that trucks seem to get stuck under 4 or 5x a year?
No you are thinking of the Wpg St. Underpass. It is about 100 years old.

http://www.leaderpost.com/news/regina/Ph...ipeg+Street+underpass/1482873/story.html
     
     
  #2118  
Old Posted Jan 15, 2015, 2:27 PM
Chorduroy's Avatar
Chorduroy Chorduroy is offline
Registered User
 
Join Date: Dec 2012
Location: YQR
Posts: 174
Quote:
Originally Posted by North_Regina_Boy View Post
I am surprised it hasn't happened for a long time. There have been accidents there in recent years but no fatalities for as long as I can remember.
A friend of a friend hit a train and died there in the early 2000's, but since then, I don't recall any other fatalities.
     
     
  #2119  
Old Posted Jan 15, 2015, 2:47 PM
MadMax MadMax is offline
Registered User
 
Join Date: Jul 2006
Location: Regina
Posts: 179
I just heard that Target is closing all 133 of its Canadian stores. Huge blow to Northgate Mall.
     
     
  #2120  
Old Posted Jan 15, 2015, 3:11 PM
Stormer's Avatar
Stormer Stormer is online now
Registered User
 
Join Date: Jan 2008
Posts: 7,973
Quote:
Originally Posted by MadMax View Post
I just heard that Target is closing all 133 of its Canadian stores. Huge blow to Northgate Mall.
Also a blow to big box developments Horizons at Westerra and Aurora that were no doubt hoping to have a shot at Target as an anchor.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 5:59 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.