Motion of support with conditions
· Rooftop mechanical screening needs to be properly addressed by providing adequate screening for both visual and noise impacts;
· PVC windows do not meet the criteria for a high-quality material for the podium;
· Acrylic stucco is not an acceptable material for the podium including the laneway façade.
And how does this guy still get work ?
C.2. The Village at Blackmud Creek
Brian Allsopp Architect - Brian Allsopp
1204 - 103A Street SW; 1660 Calgary Trail SW; 910 Calgary Trail SW
Site legally described as:
Lot F, Plan 0020692; Block G, Plan 175TR;
Lot 1, Block 1, Plan 0226460; NE W20 T51 R24
P. Odinga read the comments of the Development Planner.
MOVED: A. Fris
Motion of non-support
· The Committee supports the DC1 regulation that parking shall not dominate street frontage.
As such the parking on site A in front of proposed office A needs to be reconsidered,
reduced, and/or repositioned;
· A redesign of the amenity space adjacent to Blackmud Creek is required. The amenity space
has a residential quality that is in contrast with the proposed office A architecture. The
amenity space would benefit from better integration into the natural environment and the
modern architecture of office A;
· Provide rooftop screening for all mechanical units. Additional attention should be paid to
rooftop units on lower roofs which are visible from both the office space and rooftop patios.
· Building E`s roofscape is visible from Ellerslie Road and requires the same level of attention
to design as the facades;
· Provide details of rooftop patio design, including finishing, guardrails and any associated
landscaping;
· Provide details of office A’s ramp access to the parkade and demonstrate a similar quality of
design as the building;
· The location of the transformers, the garbage storage, and loading space is an inappropriate
adjacency to the public park and the Blackmud Creek top of bank;
· Provide a site grading plan and sections to better explain elevation changes, particularly the
relationship between office A and Blackmud Creek, and building E and Ellerslie Road.