Quote:
Originally Posted by Richard Eade
Well, there you have it. There is a real benefit to hiring someone who knows the right people in Toronto. We hire the ex-CEO of the TTC, and within a few weeks, Metrolinx is sending us 11 complete axles (including, I assume, a Cartridge Bearing Assembly already installed on each end) for our Line 1 vehicles. (Of course, I expect that they will want at least 11 back before they need to replace axles on their vehicles.)
Personally, I think that this is great. I think that Leary knows how to put a bug into the ears of the right people. Instead of Ottawa trying to fight this battle alone, Metrolinx has been awakened to the issue. I expect that Metrolinx is now looking at whether its axles will also wear out prematurely. If so, Metrolinx will likely also apply pressure on Alstom to have them redesign the IPONAM bogie.
|
Do we know for sure this was Rick Leary's doing? You'd think they would have made sure to give him credit in the article.
In any case, nice to see Metrolinx (and by extension the Province) finally acknowledge our existence and step-up.