HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #10  
Old Posted Jun 26, 2025, 2:54 AM
Metro-One's Avatar
Metro-One Metro-One is online now
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 17,944
Quote:
Originally Posted by libtard View Post
Don’t bother, I’ve already said this before. At this point they’re just being obnoxious
Coming from the same mouth that has continually complained about projects that have been long since competed??

Now that is hypocritical with a heaping spoonful of irony!

With this logic there should be no complaining about the underbuilt nature of the SFPR, or the 4 lane opening of the Pattullo Bridge, or hell, any roads.

I’m curious, at what stage is it okay to criticize a project?

Do we have to wait until it’s completed??

Do we need to wait one decade after completion?

Is it okay to mention the under built nature of the Lions Gate, or is it too soon??

I guess you can’t complain about jersey barriers anymore, you know, since its already decided / in place.

I can’t help but feel that this is a very very weak deflection tactic due to political part allegiance.
__________________
Bridging the Gap
Check out my Flickr: https://www.flickr.com/photos/30634635@N03/with/29495547810/ and Youtube channel https://www.youtube.com/channel/UCV0_0h9qKlhxXFxuAey_q6Q
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 3:26 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.