HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture > Completed Project Threads Archive


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Sep 23, 2015, 9:15 PM
Sands Sands is offline
 
Join Date: May 2013
Posts: 304
Quote:
Originally Posted by mcmann89 View Post
I'm really sick of being dragged through the mud by the condo developer. We've been told since July that things would get moving and they continue to push the date, provide "updates," etc. We were very nicely informed last week that our suite was a skip suite and therefore our walkthrough on the 7th floor will be delayed until the week of October 13th.

I had spoken to them on the phone numerous times and this was never mentioned.

The City Inspection which was due to take place this past Monday the 21st was not completed and I've been told it will "hopefully" be done by Friday. They can not issue move-in dates until the inspection is passed.
Does it mean even the lower floor (1-4) will not be able to move in next week?
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture > Completed Project Threads Archive
Forum Jump



Forum Jump


All times are GMT. The time now is 2:56 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.