Quote:
Originally Posted by mcmann89
I'm really sick of being dragged through the mud by the condo developer. We've been told since July that things would get moving and they continue to push the date, provide "updates," etc. We were very nicely informed last week that our suite was a skip suite and therefore our walkthrough on the 7th floor will be delayed until the week of October 13th.
I had spoken to them on the phone numerous times and this was never mentioned.
The City Inspection which was due to take place this past Monday the 21st was not completed and I've been told it will "hopefully" be done by Friday. They can not issue move-in dates until the inspection is passed.
|
Does it mean even the lower floor (1-4) will not be able to move in next week?