Quote:
Originally Posted by Novacek
|
I guess the improvements are not all corridor program then? The pavement is there and I've been watching the crews for the last 6 months but some of the work may have been from a little before that. Drive on Lamar up from 183 to Walnut Park and keep a look out for new sidewalks, curb cuts, ADA ramps, pedestrian bridge over little walnut creek, shared use path up from Braker to Walnut Creek. On the shared use path they included new driveways for about 12 parcels some of which are completely empty. I've gone through the diagram and most of what I'm seeing that's new is inside the future car lanes.
If things go to plan in the corridor and the orange line is extended and opened by what 2035? Then these improvements last about 15 years or a 1/4th of their design life. Anyways, that's the timeline I was talking about in my original post. In a well planned city these are basically previous generation improvements that should have been done 20 years ago.
When we were voting in 2016 the mobility bond was sold as a way to prepare for mass transit and coordination of improvements in corridors. We only have so much public resources to dedicate to transportation so the best case scenario is that we're not redoing work every 15 years. There's also planning resources that are now out of date. How much was spent on design and engineering of the Riverside and Guadalupe corridor that ended up not being used?
The pleasant valley / riverside and 24th / Guadalupe areas are completely different than the corridor program. Another piece of the corridor program, the Guadalupe bus lane contraflow that's an early out project is completely gone in Project Connect. Considering that land will be needed during construction of rail then the used life of the Guadalupe bus contraflow lanes is about 5ish years? Unless they take the southbound Guadalupe down to a single lane but that single lane still needs to handle all of the interim bus traffic.
All symptoms of basically completely changing transit plans for the city between 2016 and 2020 via different bonds. My assumption was that the corridor plan was working with a "future transit goes here" model where these released schematics make the corridor program look like it's in the way of project connect.