Quote:
Originally Posted by freerover
They are also doing a subway near Tech Ridge. Elevated will have yellow supports drawn in at regular intervals.
|
I'm pretty sure that tech ridge section has always been planned to be elevated.
Where it starts (switches from blue to orange) it has a note "end retained fill section, begin aerial".
I think it's just less planned out (and isn't showing the support locations yet).