Base coat of asphalt now laid in the section of 120 York St within the concrete curbing. The perimeter outside is still dirt and no indication when it will be regraded and repaired with new asphalt. They will have to close the parking lot to fix the perimeter.
Last edited by jammer139; Jul 12, 2022 at 7:57 PM.
|