Quote:
Originally Posted by jollyburger
We should start a VCC-Clark Extension thread and title it U/C 
|
Totally. Said this before. Each of the projects deserves each own thread due to size of each and that they are separate projects. Also, as mentioned, one is nearing construction while the other will be in planning for quite some time.
Speaking of construction I'm in the camp that nothing has been constructed yet. This is also the SSP standard, where it isn't under construction until concrete is poured. An excavation, moving utilities, etc are all ancillary work.
That being said, column construction is slated to start next Monday [Dec 13th]. However, it will be the same issue there, excavating for a column isn't construction. Concrete is to be poured relatively close in the future, though, so that will finally be construction!
Probably much sooner than the first concrete tunnel segment is placed, I'm assuming?