  #1001  
Old Posted Nov 8, 2021, 9:12 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is offline
 
Join Date: May 2007
Posts: 24,761
Quote:
Originally Posted by jollyburger View Post
RIP people who can't walk 2 minutes in the opposite direction.
Doesn't this forum complain when people have to cross the street to access a station?
Reply With Quote
     
     
  #1002  
Old Posted Nov 8, 2021, 9:21 PM
jollyburger jollyburger is online now
 
Join Date: Dec 2015
Posts: 15,849
Quote:
Originally Posted by WarrenC12 View Post
Doesn't this forum complain when people have to cross the street to access a station?
Removing pedestrians from Broadway might have some benefit with a second entrance. I don't see how that applies to this case.
Reply With Quote
     
     
  #1003  
Old Posted Nov 8, 2021, 9:30 PM
jollyburger jollyburger is online now
 
Join Date: Dec 2015
Posts: 15,849
Quote:
Originally Posted by Migrant_Coconut View Post
Yeah, the 84 is the only service for 2nd between Cambie and Clark - it's not going anywhere.

I'm seeing three, maybe four future developments that would outright benefit from an entrance on 1st. The rest most likely won't mind walking on 2nd instead.
Quote:
"Design transit facility building height, where appropriate, to increase transit visibility from the surrounding neighbourhood and to mark the location as a neighbourhood centre."
https://www.translink.ca/-/media/transli...-transit-network/tpfdg-print-version.pdf

If anything there's more room for development on the south side of East 1st then anything between East 1st and the train tracks.
Reply With Quote
     
     
  #1004  
Old Posted Nov 9, 2021, 7:10 AM
CoastMeridian CoastMeridian is offline
 
Join Date: Jan 2010
Posts: 14
Mount Pleasant Station site from November 8th






Both photos are mine.
Reply With Quote
     
     
  #1005  
Old Posted Nov 12, 2021, 12:57 AM
officedweller officedweller is offline
 
Join Date: Jul 2001
Posts: 41,840
Reply With Quote
     
     
  #1006  
Old Posted Nov 12, 2021, 1:10 AM
dleung's Avatar
dleung dleung is offline
 
Join Date: Nov 2009
Posts: 6,554
Quote:
Originally Posted by jollyburger View Post
https://www.translink.ca/-/media/transli...-transit-network/tpfdg-print-version.pdf

If anything there's more room for development on the south side of East 1st then anything between East 1st and the train tracks.
I'm kinda hoping for a future pedestrian bridge linking up all the segments of Thornton St, so that the future densification of Terminal Ave will have more options for skytrain connections.

This area if not for the rail tracks could be one of the best-serviced areas by skytrain in several different directions... maybe go even bigger and do a Hudson Yards to unlock the full potential of the site
Reply With Quote
     
     
  #1007  
Old Posted Nov 12, 2021, 2:04 AM
officedweller officedweller is offline
 
Join Date: Jul 2001
Posts: 41,840
Quote:
Originally Posted by dleung View Post
I'm kinda hoping for a future pedestrian bridge linking up all the segments of Thornton St, so that the future densification of Terminal Ave will have more options for skytrain connections.
This is/was the plan for the connections in the Flats:


https://dailyhive.com/vancouver/emily-ca...k-flats-great-northern-way-campus-photos
Reply With Quote
     
     
  #1008  
Old Posted Nov 12, 2021, 2:40 AM
Changing City's Avatar
Changing City Changing City is offline
 
Join Date: Nov 2016
Posts: 8,382
Quote:
Originally Posted by officedweller View Post
This is/was the plan for the connections in the Flats
The three east-west arterial options have now been dropped in favour of an underpass under the rail tracks on Prior.

It's never been clear to me if there's a serious possibility of building pedestrian/bike bridges north/south over the rail tracks, or whether it was purely aspirational. As these are freight yards rather than passenger trains (as is the case with Hudson Yards) it's unlikely it could ever be decked over for development. Earlier False Creek Flats planning exercises assumed the rail tracks wouldn't stay in operation, but that's not at all true now, and it's unlikely it'll change in the future.
Reply With Quote
     
     
  #1009  
Old Posted Nov 12, 2021, 5:15 AM
madog222 madog222 is offline
 
Join Date: Jan 2014
Posts: 4,240
Quote:
Originally Posted by Changing City View Post
As these are freight yards rather than passenger trains (as is the case with Hudson Yards) it's unlikely it could ever be decked over for development.
I see no reason why being a freight yard makes a difference. Ventilation would be a big issue but it would be possible, bassicly the same as the waterfront hub idea. The bigger issue is the building foundations, the rail yard would need to be completely removed for construction.
Reply With Quote
     
     
  #1010  
Old Posted Nov 12, 2021, 5:23 AM
Changing City's Avatar
Changing City Changing City is offline
 
Join Date: Nov 2016
Posts: 8,382
Exclamation

Quote:
Originally Posted by madog222 View Post
Ventilation would be a big issue but it would be possible, bassicly the same as the waterfront hub idea. Not to say I believe this would ever happen, atlease not in the next 50 years.
It would have the same issue that Waterfront Hub faces. It's not possible to develop over the tracks while the rail operators have the option of having dangerous cargo stored on the tracks. (That could be oil cars, or chemicals, for example). That issue has never been resolved, and unless it can be, the tracks will stay as they are. It doesn't apply to passenger rail tracks like Hudson Yards, or Liverpool Street in London, which is why they could be decked over.
Reply With Quote
     
     
  #1011  
Old Posted Nov 12, 2021, 5:35 AM
jollyburger jollyburger is online now
 
Join Date: Dec 2015
Posts: 15,849
Quote:
Originally Posted by madog222 View Post
I see no reason why being a freight yard makes a difference. Ventilation would be a big issue but it would be possible, bassicly the same as the waterfront hub idea. The bigger issue is the building foundations, the rail yard would need to be completely removed for construction.
Doesn't seem like even on the Waterfront that you can have rail lines under the buildings.

Quote:
The structural feasibility study included a preliminary investigation of the impacts on the rail yard likely to result from the
development anticipated in this framework document, using the Illustrative Concept Plan as a basis for the analysis. It
was initially thought that some portions of the rail tracks would be able to pass below the development sites, however on
further exploration it was determined that the required structural components for earthquake resistance would preclude
the ability to maintain rail lines under the buildings. The study concluded that there would be a loss of up to one third of
the existing rail track length within the yard to accommodate the development in the Illustrative Concept Plan.
https://guidelines.vancouver.ca/policy-plan-central-waterfront-hub-framework.pdf
Reply With Quote
     
     
  #1012  
Old Posted Nov 12, 2021, 6:32 AM
officedweller officedweller is offline
 
Join Date: Jul 2001
Posts: 41,840
I posted it just wrt the pedestrian bridges.
I could see them 'push launching' a bridge across the active rail yard the same way they did for the Coast Meridien Overpass (but on a much smaller/narrower scale).
Reply With Quote
     
     
  #1013  
Old Posted Nov 12, 2021, 7:04 AM
scottN scottN is offline
 
Join Date: Mar 2019
Posts: 286
Quote:
Originally Posted by officedweller View Post
I posted it just wrt the pedestrian bridges.
I could see them 'push launching' a bridge across the active rail yard the same way they did for the Coast Meridien Overpass (but on a much smaller/narrower scale).
A pedestrian / cyclist bridge would be much lighter than a road bridge, so you could also prefabricate it off site and then crane it into plane in a day or two like they did for the Commercial / Broadway platform 5 walkway. I recall broadway was only closed for a weekend for that operation.
Reply With Quote
     
     
  #1014  
Old Posted Nov 12, 2021, 9:04 AM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
 
Join Date: Oct 2015
Posts: 10,202
Two bridges is going to be pricey - if plausible, City Hall may very well choose to scope-creep it into one big greenway from 1st to Northern.
Reply With Quote
     
     
  #1015  
Old Posted Nov 12, 2021, 7:07 PM
Vin Vin is offline
 
Join Date: Sep 2013
Posts: 8,739
Quote:
Originally Posted by Migrant_Coconut View Post
Two bridges is going to be pricey - if plausible, City Hall may very well choose to scope-creep it into one big greenway from 1st to Northern.
Don't dream on it. The City can't even afford to take down the two viaducts. Looks like they will just let them rot and collapse.
Reply With Quote
     
     
  #1016  
Old Posted Nov 12, 2021, 10:50 PM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
 
Join Date: Oct 2015
Posts: 10,202
Quote:
Originally Posted by Vin View Post
Don't dream on it. The City can't even afford to take down the two viaducts. Looks like they will just let them rot and collapse.
Thank you for your input.
Reply With Quote
     
     
  #1017  
Old Posted Nov 12, 2021, 11:03 PM
officedweller officedweller is offline
 
Join Date: Jul 2001
Posts: 41,840
Quote:
Originally Posted by scottN View Post
A pedestrian / cyclist bridge would be much lighter than a road bridge, so you could also prefabricate it off site and then crane it into plane in a day or two like they did for the Commercial / Broadway platform 5 walkway. I recall broadway was only closed for a weekend for that operation.
Good point.
I happened to see that in person after dropping into the Safeway that night!
Reply With Quote
     
     
  #1018  
Old Posted Nov 13, 2021, 9:45 PM
jollyburger jollyburger is online now
 
Join Date: Dec 2015
Posts: 15,849
At GNW/Emily Carr

Quote:
November: Continuing bulk excavation on future station site; relocating utilities on Carolina Street and E. 1st Ave;
installing fencing around elevated guideway construction site; closing Earl Finning Way for water line relocation;
beginning installation of the elevated guideway columns; conducting geotechnical surveys; and installing monitoring
devices.
• December – Spring 2022: Continuing the construction of the elevated guideway columns
Reply With Quote
     
     
  #1019  
Old Posted Nov 15, 2021, 10:49 PM
Jimbo604 Jimbo604 is offline
 
Join Date: Jan 2012
Posts: 1,888
Quote:
Originally Posted by jollyburger View Post
At GNW/Emily Carr
December – Spring 2022: Continuing the construction of the elevated guideway columns

Makes it sound like they've already started that..
Reply With Quote
     
     
  #1020  
Old Posted Nov 15, 2021, 11:44 PM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
 
Join Date: May 2010
Posts: 4,820
Quote:
Originally Posted by Jimbo604 View Post
December – Spring 2022: Continuing the construction of the elevated guideway columns

Makes it sound like they've already started that..
They started on Great Northern Way back in the 1980's...
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 6:50 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.