Quote:
Originally Posted by scottN View Post
You can if the tube is big enough to fit the train and a platform inside it.
theoretically you could probably use a regular machine and then carve out the stations, like mining. though i don't know how realistic that is or cost effective. i am sure ground conditions would play a factor as well.

at some point you would need something above ground anyways.
Reply With Quote
     
     
  #922  
Old Posted Sep 29, 2021, 4:08 AM
scottN scottN is offline
Registered User
 
Join Date: Mar 2019
Posts: 286
Quote:
Originally Posted by VancouverOfTheFuture View Post
theoretically you could probably use a regular machine and then carve out the stations, like mining. though i don't know how realistic that is or cost effective. i am sure ground conditions would play a factor as well.

at some point you would need something above ground anyways.
I thought the crossrail project in London was boring tube for station platforms, but it turns out they actually mined out the caverns for the underground stations.

https://www.crossrail.co.uk/project/tunnelling/building-the-station-tunnels
Reply With Quote
     
     
  #923  
Old Posted Sep 29, 2021, 3:48 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is online now
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,685
Quote:
Originally Posted by scottN View Post
I thought the crossrail project in London was boring tube for station platforms, but it turns out they actually mined out the caverns for the underground stations.

https://www.crossrail.co.uk/project/tunnelling/building-the-station-tunnels
Of course it's possible. Arguably it would have been a good use of money at Main, Cambie, and Granville. Oh well.
Reply With Quote
     
     
  #924  
Old Posted Sep 29, 2021, 8:51 PM
cganuelas1995 cganuelas1995 is offline
Registered User
 
Join Date: Jan 2017
Posts: 1,661
Quote:
Originally Posted by scottN View Post
You can if the tube is big enough to fit the train and a platform inside it.
But then you have to build something above ground for passengers to enter and leave the system.
Reply With Quote
     
     
  #925  
Old Posted Sep 29, 2021, 9:08 PM
Jebby's Avatar
Jebby Jebby is offline
........
 
Join Date: Dec 2010
Location: Mexico City
Posts: 3,330
Quote:
Originally Posted by WarrenC12 View Post
Of course it's possible. Arguably it would have been a good use of money at Main, Cambie, and Granville. Oh well.
Probably wouldn't be feasible given how shallow the stations are. I'm guessing you'd have to be on solid rock to be able to mine out a cavern for a station which seeing how shallow the stations are, is likely not possible.
__________________
In the heart of a busy metropolis skyscrapers are a vivid reminder of the constant yearning of the human spirit to rise to God
Reply With Quote
     
     
  #926  
Old Posted Sep 30, 2021, 8:06 PM
Vin Vin is offline
Registered User
 
Join Date: Sep 2013
Posts: 8,738
Quote:
Originally Posted by VancouverOfTheFuture View Post
theoretically you could probably use a regular machine and then carve out the stations, like mining. though i don't know how realistic that is or cost effective. i am sure ground conditions would play a factor as well.

at some point you would need something above ground anyways.
You can't simply carve it out as the boring drilling machine comes with a shoring ability to lay concrete around the tunnel in place. Can't do that for a larger station with platforms, elevator and emergency stair wells, mechanical rooms, etc. The machine is also single-directional and won't carve to the sides. It would simply be cost effective to just excavate, build and then cover.
Reply With Quote
     
     
  #927  
Old Posted Sep 30, 2021, 8:44 PM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,753
Quote:
Originally Posted by WarrenC12 View Post
Of course it's possible. Arguably it would have been a good use of money at Main, Cambie, and Granville. Oh well.
How would it have been a good use of money?

12m tubes with stations built in:



https://www.jacobs.com/newsroom/innovation/emergence-of-small-footprint-underground-metro-stations

Last edited by jollyburger; Sep 30, 2021 at 9:28 PM.
Reply With Quote
     
     
  #928  
Old Posted Sep 30, 2021, 9:01 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,756
To show relative sizes, here's the Vancouver City Centre Station excavation with a tunnel tube in place before it was crushed and removed:
http://www.seataf.com/blogs/canadaline/2007-03-26/images/KICX4426.jpg
http://canadalinephotos.blogspot.com/2007/03/
Reply With Quote
     
     
  #929  
Old Posted Sep 30, 2021, 10:33 PM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,172
And stacked platforms are much less efficient than centre or side platforms - for one, you've got twice the riders going through one set of escalators.
Reply With Quote
     
     
  #930  
Old Posted Sep 30, 2021, 10:50 PM
cganuelas1995 cganuelas1995 is offline
Registered User
 
Join Date: Jan 2017
Posts: 1,661
Quote:
Originally Posted by Migrant_Coconut View Post
And stacked platforms are much less efficient than centre or side platforms - for one, you've got twice the riders going through one set of escalators.
Not to mention it makes single tracking a lot less practical in the event of maintenance or a track problem that needs resolving.
Reply With Quote
     
     
  #931  
Old Posted Sep 30, 2021, 11:51 PM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,797
Quote:
Originally Posted by jollyburger View Post
12m tubes with stations built in:
To do that you've got to bore a 12m tunnel through the entire line, even between stations, and that would hugely increase the tunneling cost.
Reply With Quote
     
     
  #932  
Old Posted Oct 1, 2021, 12:25 AM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,753
Quote:
Originally Posted by aberdeen5698 View Post
To do that you've got to bore a 12m tunnel through the entire line, even between stations, and that would hugely increase the tunneling cost.
Yeah I didn't say I agreed with it
Reply With Quote
     
     
  #933  
Old Posted Oct 4, 2021, 1:11 PM
Lexus's Avatar
Lexus Lexus is online now
Registered User
 
Join Date: Jul 2018
Location: Vancouver | BC | Canada
Posts: 2,843
2021, October 3

Untitled by Lexus LX570, on Flickr
Reply With Quote
     
     
  #934  
Old Posted Oct 4, 2021, 3:47 PM
Changing City's Avatar
Changing City Changing City is online now
Registered User
 
Join Date: Nov 2016
Posts: 8,299
Quote:
Originally Posted by Lexus View Post
2021, October 3
Thanks for the picture. I walked down West Broadway yesterday, and that rotary piling machine was working, on a Sunday, so they're obviously trying to maintain progress.
__________________
Contemporary Vancouver development blog, https://changingcitybook.wordpress.com/ Then and now Vancouver blog https://changingvancouver.wordpress.com/
Reply With Quote
     
     
  #935  
Old Posted Oct 4, 2021, 11:32 PM
swimmer_spe swimmer_spe is offline
BANNED
 
Join Date: Apr 2014
Posts: 10,743
Looks under construction there.
Reply With Quote
     
     
  #936  
Old Posted Oct 5, 2021, 12:01 AM
MIPS's Avatar
MIPS MIPS is offline
SkyTrain Nut
 
Join Date: Mar 2013
Location: Kamloops
Posts: 2,100
It's amazing how much more open that side of the block looks now that those buildings are gone. If you didn't know that turning to your left revealed the downtown core you would swear this is some suburban station out in the valley.
Reply With Quote
     
     
  #937  
Old Posted Oct 7, 2021, 4:24 AM
Jimbo604 Jimbo604 is offline
Registered User
 
Join Date: Jan 2012
Posts: 1,888






Photo source me
Reply With Quote
     
     
  #938  
Old Posted Oct 7, 2021, 3:49 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is online now
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,685
I sure hope that that tunnel boring machine doesn't encounter any issues between there and Main/Kingsway area. It's going under a lot of existing buildings.
Reply With Quote
     
     
  #939  
Old Posted Oct 7, 2021, 7:02 PM
VancouverOfTheFuture's Avatar
VancouverOfTheFuture VancouverOfTheFuture is offline
Registered User
 
Join Date: Apr 2014
Posts: 3,481
Quote:
Originally Posted by WarrenC12 View Post
I sure hope that that tunnel boring machine doesn't encounter any issues between there and Main/Kingsway area. It's going under a lot of existing buildings.
does anyone here know the legal requirements for doing something like that? i imagine it must be challenging and require compensation, etc. and it could impact future developmental potential above i imagine.
Reply With Quote
     
     
  #940  
Old Posted Oct 7, 2021, 7:14 PM
DKaz DKaz is offline
Registered User
 
Join Date: Nov 2008
Location: Kelowna BC & Edmonton AB
Posts: 4,299
If they managed to bore under Yaletown with much deeper underground parking structures, I'm sure Broadway will be fine. They would have done their due dillegence before proceeding.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 7:01 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.