  #321  
Old Posted May 20, 2021, 11:56 PM
VancouverOfTheFuture's Avatar
VancouverOfTheFuture VancouverOfTheFuture is offline
Registered User
 
Join Date: Apr 2014
Posts: 3,481
Quote:
Originally Posted by Changing City View Post


That's interesting. Do you have a link? It's always been described as a commercial site, with a replacement for City Hall.
no way will it be residential. CoV has owned that land for the new City Hall so long they wont lease it or sell it.

it is crazy how many different sites the CoV has around town. they'll need some big building to replace it all.
Reply With Quote
     
     
  #322  
Old Posted May 21, 2021, 6:27 AM
jollyburger jollyburger is online now
Registered User
 
Join Date: Dec 2015
Posts: 15,644
The traffic decking construction started this week until August. They said it's also starting soon at City Hall but no details.

Two eastbound lanes, one westbound from Kingsway to Columbia
No street parking
Monday-Saturday (some Sunday work)

https://www.broadwaysubway.ca/app/uploads/sites/626/2021/05/MP_Traffic-Change_May-20.pdf
Reply With Quote
     
     
  #323  
Old Posted May 21, 2021, 2:22 PM
Jimbo604 Jimbo604 is offline
Registered User
 
Join Date: Jan 2012
Posts: 1,888
Quote:
Originally Posted by Feathered Friend View Post
Well good riddance finally to these buildings that were holding Broadway and Cambie back. And Broadway itself. It only took at subway to get the city moving.
Reply With Quote
     
     
  #324  
Old Posted May 21, 2021, 4:21 PM
jollyburger jollyburger is online now
Registered User
 
Join Date: Dec 2015
Posts: 15,644
Quote:
Originally Posted by Jimbo604 View Post
Well good riddance finally to these buildings that were holding Broadway and Cambie back. And Broadway itself. It only took at subway to get the city moving.
I wouldn't get too excited until you see the development plans.
Reply With Quote
     
     
  #325  
Old Posted May 21, 2021, 4:39 PM
Diegotheartist1's Avatar
Diegotheartist1 Diegotheartist1 is offline
Registered User
 
Join Date: Apr 2021
Location: Vancouver
Posts: 163
True. We don't know what kind of project will be built there after the extension's completion.
Reply With Quote
     
     
  #326  
Old Posted May 22, 2021, 1:23 AM
Jimbo604 Jimbo604 is offline
Registered User
 
Join Date: Jan 2012
Posts: 1,888
Quote:
Originally Posted by jollyburger View Post
I wouldn't get too excited until you see the development plans.
True true...

Not sure if it has been posted already but here is a Vancouver Sun article calling out the city for their mediocre approach of only aiming for a one story station building and the "possibility of future development". Instead of getting it together, finding a partner and building something substantial right now, instead of who knows when: link

"With a few local exceptions, Vancouver seems to lag behind some other world cities in transit-integrated developments that provide important public benefits..."

Anyways, the building in Feathered Friends' picture above (the east one) is now totally demolished & demo waste almost all cleared away. This leaves only the yellow building beside the Canada Line station. Wasn't able to get a picture, sorry.
Reply With Quote
     
     
  #327  
Old Posted May 22, 2021, 4:52 AM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,125
I suspect that getting TransLink more involved with commercial development would have the usual suspects crawling out of the woodwork and screaming "conflict of interest" until they nixed it.
Reply With Quote
     
     
  #328  
Old Posted May 22, 2021, 5:02 AM
officedweller officedweller is online now
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,621
Quote:
Originally Posted by Jimbo604 View Post
Not sure if it has been posted already but here is a Vancouver Sun article calling out the city for their mediocre approach of only aiming for a one story station building and the "possibility of future development". Instead of getting it together, finding a partner and building something substantial right now, instead of who knows when: link
.
MoT and TransLink responded that concurrent development of building above or beside stations would:
- result in a shortage of staging areas for both construction projects,
- cause more disruption at station sites and
- delay the opening of the stations.

The ToD projects can be built later.

Quote:
Future buildings overhead Broadway Subway station entrances possible
Kenneth Chan
May 7 2021, 7:15 pm

There has been chatter over social media for the past week on the desire to not waste valuable air space over the station entrance buildings for SkyTrain’s Millennium Line Broadway Extension.

...

So far, one common critique is that most of these entrances are only single-storey structures, with nothing above — such as a mid-rise building with residential and/or office space.

Some have also suggested such multi-storey buildings should be built concurrently with station construction.

...

The only two exceptions are South Granville Station and Great Northern Way-Emily Carr Station.

South Granville Station will be built into a private five-storey, mixed-use development by PCI Developments with retail and office.

Construction on this building is well underway after a simple development permit application was swiftly approved, but the developer is anticipated to return to the municipal government in the near future with a rezoning application for added floors for residential or extra commercial density.

The five-storey building at South Granville Station is currently being built to accommodate this eventual vertical expansion; there will be six underground levels of parking and an extra elevator core to serve an overhead tower.

..

Similar to the Canada Line stations, the designs of the Broadway Extension stations are fairly simple to allow for the relative ease of integration into adjacent and overhead developments in the future.

“A key design principle for the new Broadway Subway project stations is to maximize potential for future developments above and/or around the station entrance buildings,” reads a statement from the BC Ministry of Transportation and Infrastructure to Daily Hive Urbanized.

“Simple, linear roof forms and station shapes, and incorporating ‘knock-out’ panels will help easily integrate the buildings with future developments.”

...

To fulfill the subway’s requirements, TransLink and the provincial and municipal governments acquired numerous properties along the route. The largest of the acquisitions was for Mount Pleasant Station — the southwest corner of Main Street and Broadway, where most of buildings on the block were recently demolished.

For South Granville Station, TransLink and the municipal government acquired a large mid-block site immediately east of the PCI Developments building footprint and station entrance. This mid-block site between Granville Street and Helmcken Street will be used for the construction staging and storage space needed to build the subway station.

It is important to note that the station entrance buildings will only occupy a small fraction of the footprint that was acquired. Over the next five years, these large sites will double as critical staging and storage space for station construction, thereby reducing the need to close more road space, which would only result in greater impacts to traffic including the reliability of the 99 B-Line during the construction period.

...

As a lesson from the disruptive practices of the Canada Line, there is an effort to take the construction footprint of the Broadway Extension away from roadways as much as possible, which is largely achieved by using tunnel boring machines. But some construction from the road surface is still required for the large underground station structures, which are double the size of the Canada Line.

Two lanes of traffic will be maintained in each direction for buses and other vehicles at the station construction sites, except for the intersection of Broadway and Main Street (Mount Pleasant Station) due to the narrower street width. Along other areas of Broadway on the subway route, three lanes of traffic in each direction will generally be retained, including one lane each way for buses.

This makes the idea of concurrent construction of residential/commercial buildings overhead the station entrance buildings challenging, and even if this approach were pursued it would greatly complicate the scope of the $2.8-billion project and could put its timing for a 2025 completion and opening at risk. More properties would have to be acquired for staging and storage areas; soaring land acquisition costs are one of the primary factors for the project’s cost escalation, up from $2.28 billion in 2015.
https://dailyhive.com/vancouver/broadway-subway-vancouver-stations-mixed-use-developments

Last edited by officedweller; May 22, 2021 at 5:12 AM.
Reply With Quote
     
     
  #329  
Old Posted May 22, 2021, 5:16 AM
Changing City's Avatar
Changing City Changing City is online now
Registered User
 
Join Date: Nov 2016
Posts: 8,182
Quote:
Originally Posted by officedweller View Post
MoT and TransLink responded that concurrent development of building above or beside stations would:
- result in a shortage of staging areas for both construction projects,
- cause more disruption at station sites and
- delay the opening of the stations.

The ToD projects can be built later.
We also need an approved Broadway Plan to clarify how big the developments can go. The office podium at Granville with the station box included, and a spare elevator shaft for a future tower on top may not turn out to be the best way to get something built either. (And that station also requires a vacant site to the east for subway construction).
__________________
Contemporary Vancouver development blog, https://changingcitybook.wordpress.com/ Then and now Vancouver blog https://changingvancouver.wordpress.com/
Reply With Quote
     
     
  #330  
Old Posted May 22, 2021, 5:22 AM
Express691 Express691 is offline
Registered User
 
Join Date: Aug 2015
Posts: 650
As construction picks up, there are a bunch of stop relocations for the 9 and 99 (+ others) set to begin May 25.

The most impactful change so far will be the 99 to Broadway Stn moving to nearside at City Hall Stn instead of farside (thankfully this one is only until June 13).

https://www.translink.ca/alerts
Reply With Quote
     
     
  #331  
Old Posted May 23, 2021, 9:31 PM
zahav zahav is offline
Registered User
 
Join Date: Apr 2009
Location: Vancouver
Posts: 2,052
I am confident there will be development at the stations, the current one story structures aren't permanent. It will be like a King Ed station situation I'm sure. I think the process of integrating the buildings would've slowed things down, and tbh I'd rather see construction start ASAP on the train and stations, and not wait for other building designs
Reply With Quote
     
     
  #332  
Old Posted May 24, 2021, 1:35 AM
Colin4567 Colin4567 is offline
Registered User
 
Join Date: Oct 2017
Location: Lower Mainland-ish
Posts: 234
Quote:
Originally Posted by zahav View Post
I am confident there will be development at the stations, the current one story structures aren't permanent. It will be like a King Ed station situation I'm sure. I think the process of integrating the buildings would've slowed things down, and tbh I'd rather see construction start ASAP on the train and stations, and not wait for other building designs
+ Vancouver would probably throw every station-top building into several years of public hearings/review/etc, and the particularly anti-subway, anti-development Councillors (i.e. Hardwick) would take delight in that
Reply With Quote
     
     
  #333  
Old Posted May 24, 2021, 1:38 AM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,125
King Ed and 49th got built on, didn't they? Just needs to be "within the community plan."
Reply With Quote
     
     
  #334  
Old Posted May 24, 2021, 2:24 PM
SFUVancouver's Avatar
SFUVancouver SFUVancouver is offline
Registered User
 
Join Date: Dec 2006
Location: Hamilton
Posts: 6,694
Now that I’m back in the GTA, I have had my frustration at the mediocrity of CoV TOD come back in full force.
__________________
VANCOUVER | Beautiful, Multicultural | Canada's Pacific Metropolis
Reply With Quote
     
     
  #335  
Old Posted May 24, 2021, 6:40 PM
VancouverOfTheFuture's Avatar
VancouverOfTheFuture VancouverOfTheFuture is offline
Registered User
 
Join Date: Apr 2014
Posts: 3,481
Quote:
Originally Posted by SFUVancouver View Post
Now that I’m back in the GTA, I have had my frustration at the mediocrity of CoV TOD come back in full force.
could you elaborate please? i can't be the only one wondering what TOD stands for.
Reply With Quote
     
     
  #336  
Old Posted May 24, 2021, 7:09 PM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,125
AFAIK Toronto has less reactionaries - probably because they've already reached "metropolis" status.

Quote:
Originally Posted by VancouverOfTheFuture View Post
could you elaborate please? i can't be the only one wondering what TOD stands for.
Here you go; it's a fairly common term, in and outside the forum.
Reply With Quote
     
     
  #337  
Old Posted May 24, 2021, 7:10 PM
madog222 madog222 is offline
Moderator
 
Join Date: Jan 2014
Posts: 4,159
Quote:
Originally Posted by VancouverOfTheFuture View Post
could you elaborate please? i can't be the only one wondering what TOD stands for.
Transit Oriented Development
Reply With Quote
     
     
  #338  
Old Posted May 24, 2021, 7:34 PM
logan5's Avatar
logan5 logan5 is offline
Registered User
 
Join Date: Feb 2011
Location: Mt.Pleasant - The New Downtown South
Posts: 8,157
Quote:
Originally Posted by Migrant_Coconut View Post
AFAIK Toronto has less reactionaries - probably because they've already reached "metropolis" status.



Here you go; it's a fairly common term, in and outside the forum.
It's a good question, and it's a term very few outside this forum would understand.
Reply With Quote
     
     
  #339  
Old Posted May 24, 2021, 7:54 PM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,125
Quote:
Originally Posted by logan5 View Post
It's a good question, and it's a term very few outside this forum would understand.
It's common enough that you'd find it quicker with a Google search instead of waiting half an hour for a reply.

Back to the point, I highly doubt that we'll be waiting ten years for six floors.
Reply With Quote
     
     
  #340  
Old Posted May 24, 2021, 8:38 PM
Diegotheartist1's Avatar
Diegotheartist1 Diegotheartist1 is offline
Registered User
 
Join Date: Apr 2021
Location: Vancouver
Posts: 163
I believe the construction crew should demolish the extra guideway (single track) westbound of VCC Station. I doubt it serves any propose anymore, hence there's going to be a pocket track just before the tunnel portal.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 9:05 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.