HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Apr 29, 2021, 11:25 PM
jollyburger jollyburger is online now
Registered User
 
Join Date: Dec 2015
Posts: 15,713
It's going to be green.

Quote:
Lynn Creek Bridge Recoating
Recoating of the existing Lynn Creek Bridge is now underway and a temporary containment "Bubble" has been installed over a portion of the Bridge. Inside the Bubble sandblasting will be taking place to remove old paint and debris before recoating occurs. The containment prevents the escape of debris and abrasives to the public and surrounding environment. The Bubble will move across the structure in 3 phases until work is Complete in June 2021. As the newly painted structure is revealed the Lynn Creek Bridge will be transformed from its previous faded and stained Orange colour to the same Green colour as the Lions Gate Bridge! The Green will hide discoloration and maintain it’s vibrancy much longer.
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 10:50 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.