  #161  
Old Posted Sep 5, 2020, 9:33 PM
caboose's Avatar
caboose caboose is offline
The Caboose
 
Join Date: Aug 2020
Location: Gatineau
Posts: 181
Quote:
Originally Posted by zzptichka View Post
It's only like 9 floors high, so you won't like it
That's perfect! In fact if only the empty parking lots of Gatineau could get 9 floors, it would be a vast improvement!
Reply With Quote
     
     
  #162  
Old Posted Sep 6, 2020, 3:33 AM
citydwlr citydwlr is offline
Registered User
 
Join Date: Mar 2013
Posts: 734
Quote:
Originally Posted by zzptichka View Post
Are there any recent renders for this building?
Ville de Gatineau website doesn't have any dev app information unfortunately...

There's this rendering from the Zibi website (building in the background, just to the right of the bridge):



There's also a rendering of the front of the building in this Investor Report (Block 210 / page 23 of 56) for Theia Partners.
Reply With Quote
     
     
  #163  
Old Posted Sep 6, 2020, 8:11 PM
kevinbottawa kevinbottawa is offline
Registered User
 
Join Date: May 2010
Location: Toronto
Posts: 2,260
Quote:
Originally Posted by caboose View Post
Does anyone know where the plans for this building can be found online?

I wonder if there's going to be direct access to the building from the bridge or if you'll have to turn onto Jos-Montferrand.
Reply With Quote
     
     
  #164  
Old Posted Sep 24, 2020, 2:32 AM
kevinbottawa kevinbottawa is offline
Registered User
 
Join Date: May 2010
Location: Toronto
Posts: 2,260
Some new photos from @RodneyWilts Twitter account





Reply With Quote
     
     
  #165  
Old Posted Oct 8, 2020, 1:50 PM
skisail_ott skisail_ott is offline
Registered User
 
Join Date: Sep 2019
Location: Ottawa
Posts: 49
Quote:
Originally Posted by Harley613 View Post
I was hoping to see that plant go within my lifetime but it looks like it's here for the foreseeable future
Kruger spent $4.8 million in 2010 to modernize the plant, cut CO2 emissions and install a heat recovery system (which I believe is the basis of Zibi's district heating). Last year Kruger renewed its lease with the NCC, allowing the plant to operate until 2053. As part of the agreement Kruger will spend $6 million to turn one of its private parking lots into a new public park. Sounds like they are planning to stay put.

Sources:
https://www.plant.ca/sustainability/kruger-gatineau-mill-recovers-heat-cuts-co2-17911/
https://www.pulpandpapercanada.com/kruger-renews-lease-for-gatineau-paper-plant-1100001843/
Reply With Quote
     
     
  #166  
Old Posted Oct 8, 2020, 3:08 PM
zzptichka zzptichka is offline
Registered User
 
Join Date: Dec 2015
Location: Outaouias
Posts: 2,381
Quote:
Originally Posted by skisail_ott View Post
Kruger spent $4.8 million in 2010 to modernize the plant, cut CO2 emissions and install a heat recovery system (which I believe is the basis of Zibi's district heating). Last year Kruger renewed its lease with the NCC, allowing the plant to operate until 2053. As part of the agreement Kruger will spend $6 million to turn one of its private parking lots into a new public park. Sounds like they are planning to stay put.

Sources:
https://www.plant.ca/sustainability/kruger-gatineau-mill-recovers-heat-cuts-co2-17911/
https://www.pulpandpapercanada.com/kruger-renews-lease-for-gatineau-paper-plant-1100001843/
Wow that's news to me.
I was under impression it was gone by 2025.
Reply With Quote
     
     
  #167  
Old Posted Oct 8, 2020, 3:13 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,961
I had no idea they extended the lease until 2053. Last I heard was the 20 year extension around 2010.
Reply With Quote
     
     
  #168  
Old Posted Oct 8, 2020, 4:56 PM
Kitchissippi's Avatar
Kitchissippi Kitchissippi is offline
Busy Beaver
 
Join Date: Nov 2005
Location: Ottawa
Posts: 4,687
Isn't there important national symbolic value in producing toilet paper across the river from Parliament? There should be a monument celebrating this, the world's largest roll.
Reply With Quote
     
     
  #169  
Old Posted Oct 8, 2020, 5:28 PM
zzptichka zzptichka is offline
Registered User
 
Join Date: Dec 2015
Location: Outaouias
Posts: 2,381
Quote:
Originally Posted by Kitchissippi View Post
Isn't there important national symbolic value in producing toilet paper across the river from Parliament? There should be a monument celebrating this, the world's largest roll.
Literally need just a couple of barrels of paint.
I hope the park will take up the largest parking lot circled with blue.




Would've been neat if they looked at Domino park at Domino Sugar Refinery in Brooklyn building around industrial history of the place.
But who am I kidding it will be just grass, MUPs and a couple of benches...



Reply With Quote
     
     
  #170  
Old Posted Oct 8, 2020, 6:08 PM
passwordisnt123 passwordisnt123 is offline
Registered User
 
Join Date: Mar 2015
Location: Ottawa (Centretown)
Posts: 643
Quote:
Originally Posted by skisail_ott View Post
Kruger spent $4.8 million in 2010 to modernize the plant, cut CO2 emissions and install a heat recovery system (which I believe is the basis of Zibi's district heating). Last year Kruger renewed its lease with the NCC, allowing the plant to operate until 2053. As part of the agreement Kruger will spend $6 million to turn one of its private parking lots into a new public park. Sounds like they are planning to stay put.

Sources:
https://www.plant.ca/sustainability/kruger-gatineau-mill-recovers-heat-cuts-co2-17911/
https://www.pulpandpapercanada.com/kruger-renews-lease-for-gatineau-paper-plant-1100001843/
That's such disappointing news. I didn't realize we're going to be stuck with that wasteful eyesore for another 30+ years. Ugh.
Reply With Quote
     
     
  #171  
Old Posted Oct 8, 2020, 8:32 PM
TheBrain TheBrain is offline
Registered User
 
Join Date: Dec 2007
Location: Cantley
Posts: 297
Quote:
Originally Posted by zzptichka View Post
Literally need just a couple of barrels of paint.
I hope the park will take up the largest parking lot circled with blue.

[IMG]https://i.imgur.com/Vbl0jrx.jpg[/IMG]
Don't get your hopes up...
From the Ottawa River North Shore Parklands Plan (p.79)
https://ncc-ccn.gc.ca/our-plans/ottawa-river-north-shore-improvement-plan



Reply With Quote
     
     
  #172  
Old Posted Oct 22, 2020, 2:39 AM
zzptichka zzptichka is offline
Registered User
 
Join Date: Dec 2015
Location: Outaouias
Posts: 2,381
Wonder how they plan to connect their heating plant to Kruger? Where will these pipes go? Underwater or where? I sure hope not above ground.

Reply With Quote
     
     
  #173  
Old Posted Oct 22, 2020, 1:44 PM
zzptichka zzptichka is offline
Registered User
 
Join Date: Dec 2015
Location: Outaouias
Posts: 2,381
Quote:
Originally Posted by skisail_ott View Post
See the sketch on this page: https://www.zibi.ca/zcu/
It may not be 100% accurate, but the fact that it shows a jog between blocks 208 and 213 suggests to me that it's pretty close. That work was completed this summer.
Note that the pipes to and from Kruger enter block 10 from the north side of the building. I think it's a safe bet that the loop will be buried under Jos. Montferrand, as it already is under Booth Street on Chaudiere Island.
That clears it up, thanks.


Last edited by zzptichka; Oct 22, 2020 at 1:58 PM.
Reply With Quote
     
     
  #174  
Old Posted Oct 29, 2020, 1:48 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,961
The City of Gatineau will be renaming two streets and a public square to honour les allumettières. Never heard of neither of those streets or the public square. Nor has Google apparently.

Quote:
Des allumettières honorées à Zibi

Le Droit, 28 octobre



La Ville de Gatineau propose de renommer deux rues et une place publique dans le projet Zibi en hommage à des allumettières qui ont vécu et travaillé en Outaouais.

Ainsi, la rue Ruggles-Wright deviendra la rue Georgina-Cabana, la rue Jennie-Shirreff sera rebaptisée la rue Alzire-Deschenes et la place de l’Île-Philemon portera plutôt le nom de la place des Contremaîtresses.

Mme Cabana fut allumettière à l’usine E.B. Eddy, et s’est démarquée par son implication syndicale. Mme Deschenes fut allumettière pendant 17 ans, et fut victime de la plus grave maladie associée à la fabrication d’allumettes, la nécrose maxillaire. Les contremaîtresses travaillaient et occupaient un poste de supervision.

Ces nouvelles appellations au sein de la communauté riveraine située aux alentours du pont Chaudière répondent aux critères de désignations du Comité de toponymie. Celui-ci souhaite rendre le nom des lieux et des artères plus représentatifs de la contribution de tous, et cherche à prioriser une toponymie féminine, autochtone et qui représente la diversité culturelle, a indiqué la Ville de Gatineau dans un communiqué.

Les nouvelles dénominations devront recevoir l’aval de la Commission de la toponymie du Québec.
https://www.ledroit.com/actualites/gatin...-a-zibi-1e46c57c406cd4a692bdfc232d2f5b64
Reply With Quote
     
     
  #175  
Old Posted Oct 29, 2020, 2:59 PM
skisail_ott skisail_ott is offline
Registered User
 
Join Date: Sep 2019
Location: Ottawa
Posts: 49
Quote:
Originally Posted by J.OT13 View Post
The City of Gatineau will be renaming two streets and a public square to honour les allumettières. Never heard of neither of those streets or the public square. Nor has Google apparently.
Place des Contremaîtresses (formerly Place de l’Île-Philemon), is the square between blocks 2+3 and what is now Zibi House.

Not that I mind, but the City of Gatineau clearly wants to replace the names of anglo settlers and the lumber barons (Jennie Shirreff was E.B. Eddy's wife) with those of the French Canadians who worked for them. At this rate, rue Ezra doesn't stand a chance :-)
Reply With Quote
     
     
  #176  
Old Posted Oct 29, 2020, 3:17 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,961
Thanks for the response. I'm also fine with these changes. Governments over the years have had a bad habit of honouring the same people over and over again (the Wrights and Eddys in Gatineau, John A. and Cartier in Ottawa, for example).

The Wrights were known for their ridiculously high rents, which stymied the growth of Hull, thus giving Bytown the advantage, and Eddy was a miser who underpaid his employees and put their lives in danger. Yes, they did make major contributions to the region in many ways and we should continue to preserve their memory, but I'm glad we're toning it down by recognizing the labourers who did most of the work.
Reply With Quote
     
     
  #177  
Old Posted Nov 18, 2020, 9:10 PM
zzptichka zzptichka is offline
Registered User
 
Join Date: Dec 2015
Location: Outaouias
Posts: 2,381
Looks like they will be installing this behemoth along Chaudiere crossing.






Hopefully it doesn't stick out much ruining the falls view and the bridge look. Otherwise it will be a huge letdown...

Given how high the water got 2 years ago, that's a real possibility.
Reply With Quote
     
     
  #178  
Old Posted Dec 11, 2020, 3:10 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,961
Recent images from Rodney Wilts on Twitter.

Federal Officer Building in November.


https://twitter.com/RodneyWilts/status/1331214149683130372

Progress on the Zip Line, early December.


https://twitter.com/RodneyWilts/status/1334943901883445248

Topped-off Gatineau rental tower and energy plant.


https://twitter.com/RodneyWilts/status/1337050601172164609
Reply With Quote
     
     
  #179  
Old Posted Dec 11, 2020, 4:01 PM
Kelnoz Kelnoz is offline
Registered User
 
Join Date: Dec 2020
Posts: 175
Do we know if they started building the landing spot on the Gatineau side? I would go check but I'm not sure where it's suppose to go, I imagine around where the rental tower/power plant is?
Reply With Quote
     
     
  #180  
Old Posted Dec 11, 2020, 4:12 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,961
Quote:
Originally Posted by Kelnoz View Post
Do we know if they started building the landing spot on the Gatineau side? I would go check but I'm not sure where it's suppose to go, I imagine around where the rental tower/power plant is?
The Gatineau landing spot will be closer to the Portage Bridge.


https://ottawa.ctvnews.ca/zip-line-connecting-ottawa-and-gatineau-coming-summer-2020-1.4716719
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Gatineau
Forum Jump



Forum Jump


All times are GMT. The time now is 4:52 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.