Originally Posted by zzptichka View Post
Wonder how they plan to connect their heating plant to Kruger? Where will these pipes go? Underwater or where? I sure hope not above ground.
See the sketch on this page: https://www.zibi.ca/zcu/
It may not be 100% accurate, but the fact that it shows a jog between blocks 208 and 213 suggests to me that it's pretty close. That work was completed this summer.
Note that the pipes to and from Kruger enter block 10 from the north side of the building. I think it's a safe bet that the loop will be buried under Jos. Montferrand, as it already is under Booth Street on Chaudiere Island.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & Urban Ottawa
Forum Jump



Forum Jump


All times are GMT. The time now is 1:57 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.