The final report has been submitted and is viewable here: http://app05.ottawa.ca/sirepub/item.aspx?itemid=402930

Edit: the current estimate for the whole project is $3 billion.

As noted earlier, the project is split into two phases.
Phase 1: Baseline to Fallowfield ($2 billion) which includes grade separations of the VIA line
Phase 2: Fallowfield to BTC ($1 billion) and includes the new MSF

The grade separations alone are $400 million.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 8:18 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.