  #921  
Old Posted Oct 10, 2020, 5:37 AM
acottawa acottawa is offline
Registered User
 
Join Date: Aug 2009
Posts: 18,914
It looks like a presentation centre.
Reply With Quote
     
     
  #922  
Old Posted Oct 11, 2020, 1:21 AM
Harley613's Avatar
Harley613 Harley613 is offline
Registered User
 
Join Date: Jun 2009
Location: Aylmer, QC
Posts: 6,896
It looks like they are setting up a photo op like the one they did for Rideau + Chapel

Trinity_Timber_Ottawa-009 by harley613, on Flickr
Reply With Quote
     
     
  #923  
Old Posted Oct 11, 2020, 4:24 AM
Catenary Catenary is offline
Registered User
 
Join Date: Dec 2012
Posts: 1,403
Quote:
Originally Posted by OCCheetos View Post
Anyone want to make any guesses? I see an SNCL van there...

Full resolution here


Edit: checking the site plan, this looks to be about where the pedestrian bridge is going to be... but it's still something?
Interestingly, SNC took their logos off of all the pickups they purchased for the Trillium Line project after they were being dragged through the news in the spring. I haven't seen a branded vehicle working on that project in months. It's quite possible they happen do be doing engineering work on the Trinity project.
Reply With Quote
     
     
  #924  
Old Posted Oct 11, 2020, 3:17 PM
UrbOttawa UrbOttawa is offline
Registered User
 
Join Date: Oct 2014
Posts: 415
Quote:
Originally Posted by Catenary View Post
Interestingly, SNC took their logos off of all the pickups they purchased for the Trillium Line project after they were being dragged through the news in the spring. I haven't seen a branded vehicle working on that project in months. It's quite possible they happen do be doing engineering work on the Trinity project.
Good call - just checked the site plan drawings and it's SNC that is noted as the mechanical engineer.
Reply With Quote
     
     
  #925  
Old Posted Oct 12, 2020, 10:03 AM
dr.jallad dr.jallad is offline
Registered User
 
Join Date: Jan 2019
Posts: 6
Wow finally some great news!
Is the project confirmed to be all rental?
Reply With Quote
     
     
  #926  
Old Posted Oct 12, 2020, 1:25 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,090
Quote:
Originally Posted by dr.jallad View Post
Wow finally some great news!
Is the project confirmed to be all rental?
From everything we've heard so far, it will be rental.
Reply With Quote
     
     
  #927  
Old Posted Oct 17, 2020, 12:46 PM
AuxTown's Avatar
AuxTown AuxTown is online now
Registered User
 
Join Date: Apr 2006
Location: Ottawa, Canada
Posts: 4,644
From the OBJ:

Quote:
Trinity Centre project a go
Despite the market downturn, the report pointed out that Trinity Development Group is proceeding with the development of its Trinity Centre project near Bayview Station. The three-tower mixed-use development will add more than 500,000 square feet of office space to the fringe core just a few kilometres west of downtown and will “feature aspects of pandemic planning,” Colliers said without elaborating.
Some bad (? good) news about office vacancy rates but overall Ottawa is holding as strong as would have been predicted for such a conservative/stable economy during the pandemic.

https://obj.ca/article/real-estate/non-r...b-office-markets-take-hit-sublease-space

Link to the Colliers report https://www.collierscanada.com/en-CA/Research/ottawa-office-market-report-q3-2020

I wonder what they mean with "aspects of pandemic planning when constructed"? Common spaces with physical distancing built in? Purell dispensers every 10 feet?
Reply With Quote
     
     
  #928  
Old Posted Oct 19, 2020, 12:15 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,090
Quote:
Originally Posted by AuxTown View Post
From the OBJ:



Some bad (? good) news about office vacancy rates but overall Ottawa is holding as strong as would have been predicted for such a conservative/stable economy during the pandemic.

https://obj.ca/article/real-estate/non-r...b-office-markets-take-hit-sublease-space

Link to the Colliers report https://www.collierscanada.com/en-CA/Research/ottawa-office-market-report-q3-2020

I wonder what they mean with "aspects of pandemic planning when constructed"? Common spaces with physical distancing built in? Purell dispensers every 10 feet?
Quote:
Despite the market downturn, the report pointed out that Trinity Development Group is proceeding with the development of its Trinity Centre project near Bayview Station. The three-tower mixed-use development will add more than 500,000 square feet of office space to the fringe core just a few kilometres west of downtown and will “feature aspects of pandemic planning,” Colliers said without elaborating.
This makes it sound like they are building the office tower soon despite the uncertainties. Still no firm date.
Reply With Quote
     
     
  #929  
Old Posted Oct 20, 2020, 9:48 PM
Harley613's Avatar
Harley613 Harley613 is offline
Registered User
 
Join Date: Jun 2009
Location: Aylmer, QC
Posts: 6,896
Well folks, it's time to officially change this to 'Under Construction'! I'm at the site now, pics to come later!
Reply With Quote
     
     
  #930  
Old Posted Oct 20, 2020, 9:58 PM
OCCheetos OCCheetos is online now
Registered User
 
Join Date: Aug 2017
Posts: 2,115
I'm sure your pictures will be infinitely better than mine Harley so I'll let you post yours first

I still have some doubts about whether this is really for Trinity. It still looks a lot like the kind of equipment you'd used to build caissons for a pedestrian bridge, but maybe I missed something.
Reply With Quote
     
     
  #931  
Old Posted Oct 20, 2020, 11:54 PM
yotajoe yotajoe is offline
Registered User
 
Join Date: Jan 2019
Location: Ottawa
Posts: 167
Quote:
Originally Posted by Harley613 View Post
Well folks, it's time to officially change this to 'Under Construction'! I'm at the site now, pics to come later!
Saw a few trucks pulling in the site while I was on the train, I don't think they'll be slow to start with this one..

Last edited by yotajoe; Oct 21, 2020 at 1:10 AM.
Reply With Quote
     
     
  #932  
Old Posted Oct 21, 2020, 1:08 AM
AuxTown's Avatar
AuxTown AuxTown is online now
Registered User
 
Join Date: Apr 2006
Location: Ottawa, Canada
Posts: 4,644
Cautiously optimistic maybe??

Reply With Quote
     
     
  #933  
Old Posted Oct 21, 2020, 4:20 AM
OCCheetos OCCheetos is online now
Registered User
 
Join Date: Aug 2017
Posts: 2,115
Here's the site plan [rotated] for reference:



I guess it really depends on where they start drilling, but right now that machine is not where the pedestrian bridge will be. ¯\_(ツ)_/¯

Edit: Maybe I'm just out of the loop, but what exactly are the references to "Richmond Street", "Loretta Avenue", and "Champagne Avenue" on the site plan supposed to be for? They're nowhere near the site.
Reply With Quote
     
     
  #934  
Old Posted Oct 21, 2020, 2:04 PM
Kitchissippi's Avatar
Kitchissippi Kitchissippi is offline
Busy Beaver
 
Join Date: Nov 2005
Location: Ottawa
Posts: 4,695
Maybe they're drilling down for a geotechnical profile of the bedrock to properly design the foundation?
Reply With Quote
     
     
  #935  
Old Posted Oct 21, 2020, 3:18 PM
yotajoe yotajoe is offline
Registered User
 
Join Date: Jan 2019
Location: Ottawa
Posts: 167
Quote:
Originally Posted by Kitchissippi View Post
Maybe they're drilling down for a geotechnical profile of the bedrock to properly design the foundation?
That's what I thought too, but apparently they already bored holes for a geotech survey back in 2015. It should be up on devapps
Reply With Quote
     
     
  #936  
Old Posted Oct 21, 2020, 4:32 PM
JHikka's Avatar
JHikka JHikka is offline
ハルウララ
 
Join Date: Jul 2009
Location: Toronto
Posts: 12,853
Quote:
Originally Posted by Harley613 View Post
Well folks, it's time to officially change this to 'Under Construction'! I'm at the site now, pics to come later!
Reply With Quote
     
     
  #937  
Old Posted Oct 21, 2020, 5:07 PM
Soi-Fon's Avatar
Soi-Fon Soi-Fon is offline
Registered User
 
Join Date: Dec 2016
Posts: 135
God 🞵🞵🞵🞵🞵🞵 dang it, Harley! If you give me false hopes about this one, I'm sending a Wendigo after you!

Last edited by Soi-Fon; Oct 21, 2020 at 5:38 PM.
Reply With Quote
     
     
  #938  
Old Posted Oct 21, 2020, 6:00 PM
Harley613's Avatar
Harley613 Harley613 is offline
Registered User
 
Join Date: Jun 2009
Location: Aylmer, QC
Posts: 6,896
Apologies for the potential false start folks. Maybe I got a little too excited when I saw the heavy equipment.
Reply With Quote
     
     
  #939  
Old Posted Oct 21, 2020, 6:15 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,090
Quote:
Originally Posted by Harley613 View Post
Apologies for the potential false start folks. Maybe I got a little too excited when I saw the heavy equipment.
No worries Harley

I suspect they will use the Trinity land as a staging area for Stage 2, beyond just the pedestrian bridge, and we might see contraction for the project start after they've completed work at Bayview (so late 2021 to mid-2022).
Reply With Quote
     
     
  #940  
Old Posted Oct 21, 2020, 6:38 PM
cr872190 cr872190 is offline
Registered User
 
Join Date: Aug 2013
Posts: 414
Quote:
Originally Posted by Catenary View Post
My feeling is that these are for the bridge. I've never seen a condo/tower that started with cassions, they almost all start with excavation for parking or driving piles for support. Cassions to support the bridge make sense to do first here if you consider that access to this side of the site will be difficult once excavation begins.

Though the bridge will be connected to the building, it's not uncommon to have pedestrian bridges supported independently of the structure, as it simplifies design. Distinct foundations separate the building and the bridge and lead to shorter spans and easier installation of the bridge.

Finally, the bridge is labelled "by others" on the Trinity site plan, so it is likely the responsibility of OC Transpo and either part of the stage 2 contract or being prepped now for later installation.



They have laid gravel out to the corner of the site closest to Bayview and there's nothing there right now, so I'm guessing that is where the work will be. This is roughly where the bridge is, you can see a new sanitary manhole there just north of the gravel in the overhead shot, and this lines up with the "Connection to existing sanitary" labelled on the plans.

As for the roads, this area is a grid so they were likely all surveyed originally. Because of the railways and Wellington on an angle as a forced road, many of the roads would never have been opened, but they appear on the plans.

In particular, Champagne is now City Centre, and it was only renamed fairly recently to make it distinct from the southern portion of Champagne. The self storage facility is the former Champagne streetcar barn, and OC Transpo referred to the bus layup on the north side as Champagne Layup up until it's closure last year.

Loretta Avenue exists south of the site, and is the next street west of Champagne. It would run right through the site of it were to exist.

As for Richmond, I believe this is what is now Bayswater, except Bayswater ended up with a swing to the west. It was likely renamed to avoid duplication too, but much earlier.
I'm not so sure. My understanding based on the elevation drawings is that there are no bridge supports on the east side of the tracks.

Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & Urban Ottawa
Forum Jump



Forum Jump


All times are GMT. The time now is 1:53 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.