HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan


Reply

 
Thread Tools Display Modes
     
     
  #5401  
Old Posted Sep 25, 2020, 5:43 PM
prairiedog007's Avatar
prairiedog007 prairiedog007 is offline
Registered User
 
Join Date: Apr 2009
Posts: 167
its about time, another month wasted
Reply With Quote
     
     
  #5402  
Old Posted Sep 25, 2020, 5:51 PM
WinCitySparky's Avatar
WinCitySparky WinCitySparky is offline
Registered User
 
Join Date: Jan 2019
Posts: 2,402
Quote:
Originally Posted by prairiedog007 View Post
its about time, another month wasted
Most staggeringly incompetent contractor that ever was.
Reply With Quote
     
     
  #5403  
Old Posted Sep 25, 2020, 7:21 PM
Biff's Avatar
Biff Biff is offline
What could go wrong?
 
Join Date: Jun 2004
Location: Winnipeg
Posts: 9,912
Next Page







__________________
"But a city can be smothered by too much reverence for its past. The skyline must keep acquiring new peaks, because the day we consider it complete and untouchable is the day the city begins to die." - Justin Davidson - May 2010 Issue of New York
Reply With Quote
     
     
  #5404  
Old Posted Sep 26, 2020, 3:45 AM
DavefromSt.Vital DavefromSt.Vital is offline
Registered User
 
Join Date: Oct 2006
Location: Yonge and Davisville
Posts: 698
Quote:
Originally Posted by WinCitySparky View Post
Hey peeps, longtime lurker, first time caller. I am working on this project and thought it pertinent to inform everyone that there is serious talk of this building being capped off at 22 floors due to so-far very weak interest in rentals. Word is, if a certain amount of suites aren’t rented by such-and-such a date, it may no longer be the tallest building in Winnipeg. As I hear more I will post.
Quote:
Originally Posted by Wpg_Guy View Post
Hmm something sounds not right about that. First off They aren’t actively marketing these rentals and secondly who is going to sign a rent lease agreement before the building is years away from being completed. True North didn’t start marketing 225 Carlton until this June, up till then there was very little information released about it. A rental building is not contingent on sales like a condo development is. Thanks for sharing, hopefully you are mistaken.
Quote:
Originally Posted by WinCitySparky View Post
Word is no crane jump til Dec
Quote:
Originally Posted by WinCitySparky View Post
Not sure. It’s written on a white board. Dunno if it’s accurate.
Quote:
Originally Posted by robertocarlos View Post
I was told it would happen in 2 weeks.
Quote:
Originally Posted by Biff View Post
That is likely the final crane jump at floor 33. Two months between jumps seems about right.
Quote:
Originally Posted by WinCitySparky View Post
Most staggeringly incompetent contractor that ever was.
Not sure why these claims should be taken seriously...
Reply With Quote
     
     
  #5405  
Old Posted Sep 26, 2020, 4:11 AM
BigG's Avatar
BigG BigG is offline
Ignore these four words.
 
Join Date: Mar 2004
Location: Fort Garryish
Posts: 1,110
I would tend to agree with you.
Reply With Quote
     
     
  #5406  
Old Posted Sep 26, 2020, 3:13 PM
pspeid's Avatar
pspeid pspeid is offline
Registered User
 
Join Date: Aug 2018
Posts: 2,632
Quote:
Originally Posted by DavefromSt.Vital View Post
Not sure why these claims should be taken seriously...
I'd agree with all except for comments from Biff. Not to sound sycophantic, but his comments have always seemed pretty accurate and devoid of some of the hysterical hyperbole that you often find in forums.

yep....Biff is pretty much my hero!

Okay, that DOES sound sycophantic.
Reply With Quote
     
     
  #5407  
Old Posted Sep 26, 2020, 3:21 PM
BigG's Avatar
BigG BigG is offline
Ignore these four words.
 
Join Date: Mar 2004
Location: Fort Garryish
Posts: 1,110
I may be wrong but I think DavefromSt.Vital was referring to WCS's comments. Wpg_Guy, robertocarlos and Biff are on the up and up. That's me being sycophantic - the word of the day.
Reply With Quote
     
     
  #5408  
Old Posted Sep 26, 2020, 3:31 PM
The Jabroni's Avatar
The Jabroni The Jabroni is online now
Go kicky fast, okay!
 
Join Date: Nov 2003
Location: Winnipeg, Donut Dominion
Posts: 3,371
Quote:
Originally Posted by BigG View Post
I may be wrong but I think DavefromSt.Vital was referring to WCS's comments. Wpg_Guy, robertocarlos and Biff are on the up and up. That's me being sycophantic - the word of the day.
Agreed.

__________________
Back then, I used to be indecisive.

Now, I'm not so sure.
Reply With Quote
     
     
  #5409  
Old Posted Sep 26, 2020, 5:35 PM
buzzg buzzg is offline
Registered User
 
Join Date: Apr 2013
Posts: 7,834
I have a friend that was working on site for a couple months and said it was an unorganized mess.
Reply With Quote
     
     
  #5410  
Old Posted Sep 26, 2020, 11:29 PM
robertocarlos robertocarlos is offline
Registered User
 
Join Date: Jul 2015
Posts: 820
Quote:
Originally Posted by DavefromSt.Vital View Post
Not sure why these claims should be taken seriously...
You don't deserve inside info.

Last edited by robertocarlos; Sep 26, 2020 at 11:45 PM.
Reply With Quote
     
     
  #5411  
Old Posted Sep 27, 2020, 12:14 AM
DavefromSt.Vital DavefromSt.Vital is offline
Registered User
 
Join Date: Oct 2006
Location: Yonge and Davisville
Posts: 698
Sorry that I wasn't clearer; I was contrasting WCS' comments with posts from people who tend to know things
Reply With Quote
     
     
  #5412  
Old Posted Sep 27, 2020, 1:10 AM
WinCitySparky's Avatar
WinCitySparky WinCitySparky is offline
Registered User
 
Join Date: Jan 2019
Posts: 2,402
I’m on the ground here Davey honey, every day. What I hear definitely isn’t always accurate, and that’s the nature of the rumour mill, I simply share what I hear around the place and I never claimed otherwise.

As for the GC being an absolute pile of garbage, that is a fact, and not a rumour. Ask anyone who works here. They have zero idea how to build a project of this scale. It’s been NEARLY TWO YEARS and they still haven’t finished the STRUCTURE, let alone the envelope. They still can’t figure out how to successfully put together the first floor of apartments because they have no idea how to push forward a schedule. Subtrades are literally standing around doing nothing half the time because nothing is progressing. TWO YEARS to get to THIS point? Put it together yourself. It’s a laughingstock. Sure it’ll eventually get finished. But we’ll still be slow-motion looking at pics of it until 2023.
Reply With Quote
     
     
  #5413  
Old Posted Sep 27, 2020, 3:57 AM
Penn33 Penn33 is offline
Registered User
 
Join Date: Dec 2019
Posts: 23
Quote:
Originally Posted by WinCitySparky View Post
I’m on the ground here Davey honey, every day. What I hear definitely isn’t always accurate, and that’s the nature of the rumour mill, I simply share what I hear around the place and I never claimed otherwise.

As for the GC being an absolute pile of garbage, that is a fact, and not a rumour. Ask anyone who works here. They have zero idea how to build a project of this scale. It’s been NEARLY TWO YEARS and they still haven’t finished the STRUCTURE, let alone the envelope. They still can’t figure out how to successfully put together the first floor of apartments because they have no idea how to push forward a schedule. Subtrades are literally standing around doing nothing half the time because nothing is progressing. TWO YEARS to get to THIS point? Put it together yourself. It’s a laughingstock. Sure it’ll eventually get finished. But we’ll still be slow-motion looking at pics of it until 2023.
That’s often the view from people not in the know. Sometimes some projects go awry from outside factors. It throws out planning and scheduling, but doesn’t mean it’s poorly managed. It’s not reasonable to expect multiple contractors to not supply on time. Let alone a global pandemic. But to say it’s seriously being considered to be capped at half height? I don’t know what to say about that. Or crane not going up until December? I guess we’ll see next week.
Reply With Quote
     
     
  #5414  
Old Posted Sep 27, 2020, 5:04 AM
robertocarlos robertocarlos is offline
Registered User
 
Join Date: Jul 2015
Posts: 820
Quote:
Originally Posted by DavefromSt.Vital View Post
Sorry that I wasn't clearer; I was contrasting WCS' comments with posts from people who tend to know things
I understand your post now.

I just post what I sometimes hear from people who are close to the project.

I have heard things I can't repeat but all in all I think the project is going well considering everything.
Reply With Quote
     
     
  #5415  
Old Posted Sep 27, 2020, 10:59 AM
pspeid's Avatar
pspeid pspeid is offline
Registered User
 
Join Date: Aug 2018
Posts: 2,632
I haven't worked with the trades a lot, but in my limited experience they rarely give each other much credit for knowing their jobs. Electricians think plumbers are all idiots, plumbers despise concrete finishers, etc. It just seems to be part of the "culture" at times. I don't know, can anyone with more experience in construction say whether this is the case? That could account for some of the negative buzz that gets reported here??
Reply With Quote
     
     
  #5416  
Old Posted Sep 27, 2020, 2:19 PM
esquire's Avatar
esquire esquire is offline
Registered User
 
Join Date: Oct 2001
Posts: 37,480
Whether or not you agree with everything WinCitySparky says, you have to admit that this project is proceeding at an excruciatingly slow pace. Two years in and the structure is barely past the halfway point... and that's with the foundation and footings already in place on day one of the project.
Reply With Quote
     
     
  #5417  
Old Posted Sep 27, 2020, 3:01 PM
Spocket's Avatar
Spocket Spocket is offline
Back from the dead
 
Join Date: Feb 2006
Location: Edmonton
Posts: 3,619
Quote:
Originally Posted by esquire View Post
Whether or not you agree with everything WinCitySparky says, you have to admit that this project is proceeding at an excruciatingly slow pace. Two years in and the structure is barely past the halfway point... and that's with the foundation and footings already in place on day one of the project.
Yeah, can't really deny that. Of course, I have no idea how any of this stuff works but one would think that you practically just had to throw a crane on top and get to work.
__________________
Giving you a reason to drink and drive since 1975.
Reply With Quote
     
     
  #5418  
Old Posted Sep 27, 2020, 6:01 PM
WinCitySparky's Avatar
WinCitySparky WinCitySparky is offline
Registered User
 
Join Date: Jan 2019
Posts: 2,402
Quote:
Originally Posted by pspeid View Post
I haven't worked with the trades a lot, but in my limited experience they rarely give each other much credit for knowing their jobs. Electricians think plumbers are all idiots, plumbers despise concrete finishers, etc. It just seems to be part of the "culture" at times. I don't know, can anyone with more experience in construction say whether this is the case? That could account for some of the negative buzz that gets reported here??
This observation can be true depending on the site, but everyone actually gets along very well on this site. It’s one of the least toxic and most diverse sites I’ve ever been on. It’s just extremely inefficient and dysfunctional operationally.
Reply With Quote
     
     
  #5419  
Old Posted Sep 28, 2020, 1:43 PM
BigG's Avatar
BigG BigG is offline
Ignore these four words.
 
Join Date: Mar 2004
Location: Fort Garryish
Posts: 1,110
Maybe you can paint a picture on how extremely inefficient and dysfunctional the operations are so that we can have a better understanding of what you are stating?
Reply With Quote
     
     
  #5420  
Old Posted Sep 28, 2020, 1:48 PM
3de14eec6a 3de14eec6a is offline
Registered User
 
Join Date: Jan 2016
Posts: 206
Quote:
Originally Posted by roccerfeller View Post


this is going to be awesome

I hope it takes it's sweet time to construct, cause that crane is going to have a huge impact on the skyline itself....
Let's all blame roccerfeller for how long it's taking.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 5:04 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.