HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Sep 14, 2020, 4:35 PM
pspeid's Avatar
pspeid pspeid is online now
Registered User
 
Join Date: Aug 2018
Posts: 2,614
Quote:
Originally Posted by Biff View Post
I spoke with those involved, the plan was in place to replace the 59 North floodway bridge in 2020/2021 (before the existing bridge was hit). The repairs were north of $1.5 million (insurance coverage was $500-$800k). They saw no reason to spend the $1.5m only to rip it down 1-2 years later.
These facts will probably ruin someone's furious indignation.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 6:46 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.