Quote:
Originally Posted by Biff
I spoke with those involved, the plan was in place to replace the 59 North floodway bridge in 2020/2021 (before the existing bridge was hit). The repairs were north of $1.5 million (insurance coverage was $500-$800k). They saw no reason to spend the $1.5m only to rip it down 1-2 years later.
|
These facts will probably ruin someone's furious indignation.