Quote:
Originally Posted by BuildUpWpg
Even the floodway bridge on Hwy 59 north of the city...over a year ago part of the guard rail got knocked out. instead of just fixing it, the curb lane was closed and it's been like that ever since!
|
I spoke with those involved, the plan was in place to replace the 59 North floodway bridge in 2020/2021 (before the existing bridge was hit). The repairs were north of $1.5 million (insurance coverage was $500-$800k). They saw no reason to spend the $1.5m only to rip it down 1-2 years later.