Quote:
Originally Posted by Dengler Avenue
With recession around the corner, which projects, if any at all, will proceed?
For 2-6, I forgot the specific segments that still only have 2 lanes so I lumped them together.
|
1. Renfrew to Arnprior
2. T Bay - Nipigon Corridor
3. Highway 69 - not sure what the status of negotiation with the FNs along the route is, as the sections to be completed run through 3 of them. That could be a major holdup, as it was with the 400 south of Parry Sound.
4. Kenora (6 km)
The list below is not happening in the near future. These are decades away. Design, property acquisition and utility/rail relocations have to happen first.
SSM to Espanola
Espanola to Denlou
Lively to Markstay-Warren
Callander (North Bay) to Mattawa