Quote:
Originally Posted by milomilo
Thanks for putting that into numbers. I assume we'd need at least 2 of these trains, so it would be spending ~$180M
|
True. I was thinking one train would be enough. Having said that, I did significantly over estimate the costs in several places, so I doubt if it would actually be that expensive (a more realistic cost for 2 trains would likely be in the neighbourhood of $100-150M).
Quote:
Originally Posted by milomilo
to reduce, but not eliminate subsidy on rail line that provides questionable utility to a tiny number of users. It doesn't seem like a good use of money to me.
|
If it was operating at a close to cost recovery basis, your statement that it "provides questionable utility to a tiny number of users" is highly suspect. The only way for it to come close to recovering its cost is for it to be well used. As others on this thread have said, it is quite full between Montreal and the NB boarder.
Quote:
Originally Posted by swimmer_spe
Ideally, if Via could get into a plan where after each new fleet contract is filled, a new one is started and older equipment gets refurbished and moved to the other routes, what you suggest may be possible. As I understand it, the Renaissance fleet is garbage, so we are stuck with waiting for the new fleet to come in.
When a coach is refurbished, it could be converted to a sleeper. This would allow a new fleet of sleepers. I doubt via is thinking that long term.
|
Converting a coach to a sleeper would be a kludge at best. The biggest problem would be the windows as the required spacing would be different. Yes you could plug them and then cut new ones, but that would not only look ugly, but be a potential source of leaks.
The reality is the change in design wouldn't be cheap. It isn't like the military where you have troops that you are paying anyway who can do the work. You will be paying a contractor to do everything. By the time all is said and done, it would probably cost almost as much as buying purpose built sleepers and the retrofit would result in an inferior product.
Quote:
Originally Posted by swimmer_spe
It is. Why not work on a proposal to present to the government to do something? I feel that that corridor would make sense as the next route to add to the Via system. I do wonder if just getting something running on a stable schedule would be good enough. Yes, an HFR would be best, but if it is not possible at this time, something running on existing infrastructure, building the case for a new HFR. A good middle ground would be if Via bought the CP line between Calgary and Edmonton, and still allow some freight as needed.
|
That is where I disagree with you. Something isn't always better than nothing. Without any upgrades, I wouldn't be surprised if it took as much as 6 hours. If so, no one would use it (for reference the
Red Arrow, ranges from 3 to 4 hours to from Edmonton South, depending on the time of day). If it isn't being used, there will be no incentive to make it better, but instead, it will just be cancelled again.
Your plan would be the perfect way of killing all hope of ever having good rail service in the west.