  #9541  
Old Posted Mar 18, 2020, 5:14 PM
kcantor kcantor is offline
Registered User
 
Join Date: Aug 2007
Location: Edmonton
Posts: 2,987
Quote:
Originally Posted by DKaz View Post
I braved -13 temperatures and rode my motorcycle to work today. I didn't want to deal with transit again.
trading one tempting fate for another?

be careful and stay safe regardless of the fate you're tempting.
__________________
"If you did not want much, there was plenty." Harper Lee
     
     
  #9542  
Old Posted Mar 18, 2020, 7:00 PM
DKaz DKaz is offline
Registered User
 
Join Date: Nov 2008
Location: Kelowna BC & Edmonton AB
Posts: 4,299
It was COLD. I had to take a tea break just 5km into my 18km ride and thought it was going to be one long ride. Thankfully that tea warmed me and particularily my hands up enough that I was able to get to work with no further warm up breaks.

Quote:
Originally Posted by kcantor View Post
trading one tempting fate for another?

be careful and stay safe regardless of the fate you're tempting.
I hated the extra transfer more than anything. Roads were good. Motorcycling keeps me alive mentally. One huge reason we're moving back to B.C. in 5 days. Hopefully nothing stops that.
     
     
  #9543  
Old Posted Mar 21, 2020, 12:03 AM
Coldrsx's Avatar
Coldrsx Coldrsx is offline
Community Guy
 
Join Date: Dec 2003
Location: Edmonton, AB
Posts: 69,138
ETS now fare-less until further notice.

Epark also free.
__________________
"The destructive effects of automobiles are much less a cause than a symptom of our incompetence at city building" - Jane Jacobs 1961ish

Wake me up when I can see skyscrapers
     
     
  #9544  
Old Posted Mar 21, 2020, 5:43 PM
Coldrsx's Avatar
Coldrsx Coldrsx is offline
Community Guy
 
Join Date: Dec 2003
Location: Edmonton, AB
Posts: 69,138
Churchill Station


@ianoyeg
__________________
"The destructive effects of automobiles are much less a cause than a symptom of our incompetence at city building" - Jane Jacobs 1961ish

Wake me up when I can see skyscrapers
     
     
  #9545  
Old Posted Mar 31, 2020, 9:14 PM
Airboy Airboy is offline
Registered User
 
Join Date: Sep 2008
Location: Edmonton/St Albert
Posts: 9,855
[IMG]Let entrance by Tim Taylor-Smith, on Flickr[/IMG]

Churchill Station slowly reaching the surface.
__________________
Why complain about the weather? Its always going to be here. You on the other hand will not.
     
     
  #9546  
Old Posted Mar 31, 2020, 9:58 PM
CMD UW's Avatar
CMD UW CMD UW is offline
Urbis Maximus
 
Join Date: Feb 2002
Location: Edmonton
Posts: 12,009
I will be so glad when they are done the LRT downtown.
__________________
"Call me sir, goddammit!"
     
     
  #9547  
Old Posted Mar 31, 2020, 10:26 PM
Coldrsx's Avatar
Coldrsx Coldrsx is offline
Community Guy
 
Join Date: Dec 2003
Location: Edmonton, AB
Posts: 69,138
Not soon enough...
__________________
"The destructive effects of automobiles are much less a cause than a symptom of our incompetence at city building" - Jane Jacobs 1961ish

Wake me up when I can see skyscrapers
     
     
  #9548  
Old Posted Mar 31, 2020, 11:34 PM
Black Star Black Star is offline
BANNED
 
Join Date: Jun 2010
Location: Edmonton
Posts: 7,259
X3.....it seems like it's been forever.

When the west LRT starts....I'm not going anywhere near the construction if I can help it.
     
     
  #9549  
Old Posted Apr 1, 2020, 2:57 PM
Hardhatdan Hardhatdan is offline
Registered User
 
Join Date: Jan 2003
Posts: 4,328
The COE better put a requirement to work a full 12 month calendar on the WLRT through the Downtown at minimum.
     
     
  #9550  
Old Posted Apr 1, 2020, 3:01 PM
Coldrsx's Avatar
Coldrsx Coldrsx is offline
Community Guy
 
Join Date: Dec 2003
Location: Edmonton, AB
Posts: 69,138
We will be asking for major intersections to be done within 30 days and that anything from 109st-103st be done in one construction year... other than stations and landscaping to ensure that we don't see laydown areas or awaiting 3-4yrs for other sections.
__________________
"The destructive effects of automobiles are much less a cause than a symptom of our incompetence at city building" - Jane Jacobs 1961ish

Wake me up when I can see skyscrapers
     
     
  #9551  
Old Posted Apr 1, 2020, 5:50 PM
CMD UW's Avatar
CMD UW CMD UW is offline
Urbis Maximus
 
Join Date: Feb 2002
Location: Edmonton
Posts: 12,009
Quote:
Originally Posted by Hardhatdan View Post
The COE better put a requirement to work a full 12 month calendar on the WLRT through the Downtown at minimum.
Agree. High pedestrian/cycling stretches to be completed first to minimize overall disruptions.
__________________
"Call me sir, goddammit!"
     
     
  #9552  
Old Posted Apr 2, 2020, 3:53 PM
adam-machiavelli adam-machiavelli is offline
Registered User
 
Join Date: Jun 2005
Posts: 1,246
I bet if the Valley line was being built in a conventional design-build, not DBFO model, the City would have had much more control over the construction schedule, materials quality, and work locations.
     
     
  #9553  
Old Posted Apr 2, 2020, 4:08 PM
Coldrsx's Avatar
Coldrsx Coldrsx is offline
Community Guy
 
Join Date: Dec 2003
Location: Edmonton, AB
Posts: 69,138
100
__________________
"The destructive effects of automobiles are much less a cause than a symptom of our incompetence at city building" - Jane Jacobs 1961ish

Wake me up when I can see skyscrapers
     
     
  #9554  
Old Posted Apr 2, 2020, 5:05 PM
kcantor kcantor is offline
Registered User
 
Join Date: Aug 2007
Location: Edmonton
Posts: 2,987
Quote:
Originally Posted by adam-machiavelli View Post
I bet if the Valley line was being built in a conventional design-build, not DBFO model, the City would have had much more control over the construction schedule, materials quality, and work locations.
they may have had "more control" but that in and of itself doesn't guarantee better performance or better results...
__________________
"If you did not want much, there was plenty." Harper Lee
     
     
  #9555  
Old Posted Apr 2, 2020, 7:54 PM
Hardhatdan Hardhatdan is offline
Registered User
 
Join Date: Jan 2003
Posts: 4,328
Quote:
Originally Posted by adam-machiavelli View Post
I bet if the Valley line was being built in a conventional design-build, not DBFO model, the City would have had much more control over the construction schedule, materials quality, and work locations.
You can write whatever you want into the original contract for the contractor to follow. The COE can follow the same model and have different execution requirements, material requirements, etc negotiated into the deal.
     
     
  #9556  
Old Posted Apr 7, 2020, 1:54 PM
Coldrsx's Avatar
Coldrsx Coldrsx is offline
Community Guy
 
Join Date: Dec 2003
Location: Edmonton, AB
Posts: 69,138
West LRT Update - Construction start is 2021:

There continues to be a lot of activity and interest in the Valley Line West. Our project is in procurement, and we recently shortlisted three teams to participate in the Request for Proposals (RFP) stage of procurement for the contract to design, build and partially finance the 14-kilometre extension from Downtown to Lewis Farms in west Edmonton.

The shortlisted teams are:

Aecon | Dragados Valley Line West Joint Venture (VLWJV)
Marigold Infrastructure Partners
urbanTransitT
The procurement process launched on Jan. 7, with the Request for Qualifications (RFQ) phase. The RFQ phase required each team to demonstrate how their experience and expertise could successfully deliver the project. The City selected these teams after carefully reviewing and evaluating their submissions based on rigorous criteria.

The remainder of the year will be a busy one. We are continuing our procurement process using videoconferencing technology and electronic document management systems, for the safety of everyone involved. During initial meetings the teams were very engaged and positive about the project and the procurement process. They will work with the City to develop their technical and financial submissions, which the City will review and evaluate before selecting the successful team.

City of Edmonton release
__________________
"The destructive effects of automobiles are much less a cause than a symptom of our incompetence at city building" - Jane Jacobs 1961ish

Wake me up when I can see skyscrapers
     
     
  #9557  
Old Posted Apr 8, 2020, 2:33 PM
DKaz DKaz is offline
Registered User
 
Join Date: Nov 2008
Location: Kelowna BC & Edmonton AB
Posts: 4,299
It's just crazy that in the 21 months I've been in Edmonton, there hasn't been a great deal of progress. Downtown Edmonton street crossings complete, elevated guideway mostly complete, and the storage and maintenance facility. But other than that much of downtown Edmonton has been ripped up for forever as with much of the alignment all the way to Millwoods. They need to make it a hard goal to pour all concrete by the end of the year.
     
     
  #9558  
Old Posted Apr 8, 2020, 3:38 PM
Airboy Airboy is offline
Registered User
 
Join Date: Sep 2008
Location: Edmonton/St Albert
Posts: 9,855
Quote:
Originally Posted by DKaz View Post
It's just crazy that in the 21 months I've been in Edmonton, there hasn't been a great deal of progress. Downtown Edmonton street crossings complete, elevated guideway mostly complete, and the storage and maintenance facility. But other than that much of downtown Edmonton has been ripped up for forever as with much of the alignment all the way to Millwoods. They need to make it a hard goal to pour all concrete by the end of the year.
A lot of progress the last couple of weeks. much of downtown track bed is poured. The section from 97 east to the tunnel is back filled and it appears they are getting the sub base ready for the track base. Winspear section is being worked on again. great sections along the whole length now tarped over. Bridge is about 1/2 way across now.

Looks like they are getting ready for another set of cables.

The Churchill surface platforms are formed and will be getting concrete this week.
__________________
Why complain about the weather? Its always going to be here. You on the other hand will not.
     
     
  #9559  
Old Posted Apr 8, 2020, 4:31 PM
Harrison's Avatar
Harrison Harrison is offline
A Better Place
 
Join Date: Jan 2007
Location: Edmonton
Posts: 3,089
Quote:
Originally Posted by Airboy View Post
A lot of progress the last couple of weeks. much of downtown track bed is poured. The section from 97 east to the tunnel is back filled and it appears they are getting the sub base ready for the track base. Winspear section is being worked on again. great sections along the whole length now tarped over. Bridge is about 1/2 way across now.

Looks like they are getting ready for another set of cables.

The Churchill surface platforms are formed and will be getting concrete this week.
At what temperature can they stop tarping over the concrete? It must be getting close this week since we are getting back to near-seasonal daily highs.
__________________
Bingo bango bongo
     
     
  #9560  
Old Posted Apr 8, 2020, 4:34 PM
Hallsy's Toupee's Avatar
Hallsy's Toupee Hallsy's Toupee is offline
Registered User
 
Join Date: Feb 2010
Location: Edmonton
Posts: 6,895
^^ How about west of 101 St? I often use the pedway between Manulife Place and ECC mall (though barely since last month), and I've seen so little progress in the past couple of years.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Edmonton
Forum Jump



Forum Jump


All times are GMT. The time now is 4:17 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.