HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


View Poll Results: Based on options for Broadway Corridor Study, what is your preferred choice?
BRT: Commercial to UBC 25 6.16%
LRT A: Commercial to UBC OR Commercial via VCC to UBC 31 7.64%
LRT B: Main St. to UBC AND Commercial to UBC 18 4.43%
RRT: Commercial to UBC OR VCC to UBC 283 69.70%
COMBO: RRT to Arbutus/LRT to Main St via Arbutus 39 9.61%
BUS: Enhanced Bus Service for all buses to UBC 10 2.46%
Voters: 406. You may not vote on this poll

Closed Thread

 
Thread Tools Display Modes
     
     
  #10361  
Old Posted Jan 15, 2020, 7:19 PM
Xerx Xerx is offline
Registered User
 
Join Date: Apr 2009
Posts: 198
If you want to save costs, you'd use cut and cover for most of the tunnel.
     
     
  #10362  
Old Posted Jan 15, 2020, 7:29 PM
logan5's Avatar
logan5 logan5 is offline
Registered User
 
Join Date: Feb 2011
Location: Mt.Pleasant - The New Downtown South
Posts: 8,177
Moved to Transit thread...
     
     
  #10363  
Old Posted Jan 16, 2020, 1:45 AM
Kisai Kisai is offline
Registered User
 
Join Date: Jun 2014
Location: Burnaby
Posts: 1,154
Quote:
Originally Posted by misher View Post
Think its going at ground level at UBC? That last station looks like an expensive addition.
Hmm, I wonder if they're maybe thinking ahead and going to send it back down 41st. Probably not any time this decade.
     
     
  #10364  
Old Posted Jan 16, 2020, 2:04 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,766
Quote:
Originally Posted by Kisai View Post
Hmm, I wonder if they're maybe thinking ahead and going to send it back down 41st. Probably not any time this decade.
That would be my guess, too - the same way the guideway at King George Station points down Fraser Highway.

It would be head-scratcher like the [future] Douglas-Lake Lafarge spur if they went to Wesbrook Village first, then UBC transit exchange.
     
     
  #10365  
Old Posted Jan 16, 2020, 2:27 AM
Bdawe Bdawe is offline
Registered User
 
Join Date: Aug 2015
Location: The West End
Posts: 535
Quote:
Originally Posted by logan5 View Post
Was just thinking as an alternative to Skytrain subway that costs 3 billion to go to Arbutus, how much would a bus tunnel cost? A bus tunnel would be much simpler, ie no rail infrastructure, and far less electrical infrastructure for a battery powered bus, just a simple roadway. Driverless technology would mean a BRT service could match the capacity of Skytrain, while still realizing the labour cost benefits.

Maybe down the road consider bus tunnels for Hastings or 41st. There are some serious cost savings and system advantages to such a set up.
1) the tunnel must be wider to handle non-rail bound vehicles that have less predictable clearances.

2) the rails themselves aren't that complicated

3) the batter powered bus is going to need substantial electrical infrastructure to bring a lot of power to one place a one time to charge the bus. trolley wire isn't thaaat complicated

4) if you can't do BEBs good, you are absolutely making this more complicated if you have to deal with ventilation

5) driverless technology for buses doesn't exist, and therefore isn't cheap.
     
     
  #10366  
Old Posted Jan 16, 2020, 2:37 AM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,174
6) The tunnel is the really expensive part, so you might as well make it the highest-capacity option possible.

7) The rails are the reason why trains can have more capacity than buses. Long-enough buses can't corner or pass efficiently (with or without a driver), meaning a wider and more expensive tunnel.

Quote:
Originally Posted by officedweller View Post
That would be my guess, too - the same way the guideway at King George Station points down Fraser Highway.

It would be head-scratcher like the [future] Douglas-Lake Lafarge spur if they went to Wesbrook Village first, then UBC transit exchange.
I'd argue that a separate 41st Line makes more sense than having the Millennium double back. Last thing we need is a repeat of its Phase 1.
     
     
  #10367  
Old Posted Jan 16, 2020, 3:20 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,766
Quote:
Originally Posted by Migrant_Coconut View Post
I'd argue that a separate 41st Line makes more sense than having the Millennium double back. Last thing we need is a repeat of its Phase 1.
But that's just an operational issue.
Having connected track allows the transfer of vehicles or another storage yard, etc.
If they are smart, they'd install the spanish solution or a 3rd or 4th track at UBC Station for a future 41st line terminus and reversing trains
- even just to accommodate expected UBC crowds.
     
     
  #10368  
Old Posted Jan 16, 2020, 3:21 AM
swimmer_spe swimmer_spe is offline
BANNED
 
Join Date: Apr 2014
Posts: 10,743
Quote:
Originally Posted by Bdawe View Post
1) the tunnel must be wider to handle non-rail bound vehicles that have less predictable clearances.

2) the rails themselves aren't that complicated

3) the batter powered bus is going to need substantial electrical infrastructure to bring a lot of power to one place a one time to charge the bus. trolley wire isn't thaaat complicated

4) if you can't do BEBs good, you are absolutely making this more complicated if you have to deal with ventilation

5) driverless technology for buses doesn't exist, and therefore isn't cheap.
Look up the Silver Line BRT in Boston. They did this.
     
     
  #10369  
Old Posted Jan 16, 2020, 4:15 AM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,799
Quote:
Originally Posted by Bdawe View Post
4) if you can't do BEBs good, you are absolutely making this more complicated if you have to deal with ventilation
Yeah, during the transition to battery electric buses you have to provide for route coverage with conventional diesel buses in case you have vehicle or charging infrastructure issues. You can't really count on the benefits of full BEB operation until you've got enough redundancy in the fleet and in the charging infrastructure that you don't have to plan for contingencies.
     
     
  #10370  
Old Posted Jan 16, 2020, 6:25 AM
VancouverOfTheFuture's Avatar
VancouverOfTheFuture VancouverOfTheFuture is offline
Registered User
 
Join Date: Apr 2014
Posts: 3,481
Quote:
Originally Posted by officedweller View Post
If they are smart, they'd install the spanish solution or a 3rd or 4th track at UBC Station for a future 41st line terminus and reversing trains.
if we had the money, i would say make an express track for the Broadway subway. though that would never happen.
     
     
  #10371  
Old Posted Jan 16, 2020, 9:23 AM
fredinno's Avatar
fredinno fredinno is offline
Registered User
 
Join Date: Jan 2012
Posts: 2,317
Quote:
Originally Posted by logan5 View Post
Was just thinking as an alternative to Skytrain subway that costs 3 billion to go to Arbutus, how much would a bus tunnel cost? A bus tunnel would be much simpler, ie no rail infrastructure, and far less electrical infrastructure for a battery powered bus, just a simple roadway. Driverless technology would mean a BRT service could match the capacity of Skytrain, while still realizing the labour cost benefits.

Maybe down the road consider bus tunnels for Hastings or 41st. There are some serious cost savings and system advantages to such a set up.
Do you have the article showing that the tunnel itself is that much cheaper than adding in rails?

I've yet to see 4-car articulated buses (it doesn't even seem practical due to turn radius), meaning capacity-wise, it can't really compete.
     
     
  #10372  
Old Posted Jan 16, 2020, 4:20 PM
logan5's Avatar
logan5 logan5 is offline
Registered User
 
Join Date: Feb 2011
Location: Mt.Pleasant - The New Downtown South
Posts: 8,177
Quote:
Originally Posted by fredinno View Post
Do you have the article showing that the tunnel itself is that much cheaper than adding in rails?

I've yet to see 4-car articulated buses (it doesn't even seem practical due to turn radius), meaning capacity-wise, it can't really compete.
I can't find that document that was previously on-line, but I did find a post of mine from 2012 where I quote the numbers from that document.

Quote:
Originally Posted by logan5 View Post
The 2.5 km bored tunnel section of the Canada Line - the more expensive method - cost $55 million/km for the tunnel and stations with just the bare concrete lining.
With the average cost to build the C-Line at 110 million/km, the more expensive tunnel boring section would likely be in the 150 million/km range, so just a third of the cost is for the tunnel itself.

Like I mentioned before, emerging technologies will allow buses to match capacity of LRT, while having the flexibility to travel anywhere on the road network.
     
     
  #10373  
Old Posted Jan 16, 2020, 4:24 PM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,799
Quote:
Originally Posted by logan5 View Post
With the average cost to build the C-Line at 110 million/km, the more expensive tunnel boring section would likely be in the 150 million/km range, so just a third of the cost is for the tunnel itself.
It's a lot worse than that, because with a tunnel you don't have all of the utility and street works costs that are part of that $110M/km figure.
     
     
  #10374  
Old Posted Jan 16, 2020, 5:08 PM
swimmer_spe swimmer_spe is offline
BANNED
 
Join Date: Apr 2014
Posts: 10,743
Quote:
Originally Posted by logan5 View Post
I can't find that document that was previously on-line, but I did find a post of mine from 2012 where I quote the numbers from that document.



With the average cost to build the C-Line at 110 million/km, the more expensive tunnel boring section would likely be in the 150 million/km range, so just a third of the cost is for the tunnel itself.

Like I mentioned before, emerging technologies will allow buses to match capacity of LRT, while having the flexibility to travel anywhere on the road network.
That would be fine for most bus lines. This route is the busiest route in Canada. This is busier than the busiest Streetcar route in Toronto.

Get the idea of using buses out of your head. Skytrain cars hold more people and can move them more often than buses. Extending the Skytrain is the only smart move.
     
     
  #10375  
Old Posted Jan 16, 2020, 5:26 PM
logan5's Avatar
logan5 logan5 is offline
Registered User
 
Join Date: Feb 2011
Location: Mt.Pleasant - The New Downtown South
Posts: 8,177
Quote:
Originally Posted by swimmer_spe View Post
That would be fine for most bus lines. This route is the busiest route in Canada. This is busier than the busiest Streetcar route in Toronto.

Get the idea of using buses out of your head. Skytrain cars hold more people and can move them more often than buses. Extending the Skytrain is the only smart move.
I was suggesting a BRT subway system. That would easily handle Broadway.

Obviously Skytrain is going down Broadway at this point. I was suggesting corridors where medium capacity makes sense, like 41st or Hastings. Given the proper transit-way, a BRT system can match the capacity of LRT or even Skytrain. Driverless technology will allow BRT to match LRT or Skytrains operating cost advantage.

Last edited by logan5; Jan 16, 2020 at 5:38 PM.
     
     
  #10376  
Old Posted Jan 16, 2020, 6:15 PM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,174
Any bus route capable of running at 75-second headways and carrying 300+ people/vehicle is most definitely going to be more expensive than a SkyTrain, tunnel or not.
     
     
  #10377  
Old Posted Jan 18, 2020, 9:37 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,766
For UBC route options, check out this article from January 2019:
https://dailyhive.com/vancouver/ubc-skytrain-route-options
     
     
  #10378  
Old Posted Jan 20, 2020, 11:54 PM
djmk's Avatar
djmk djmk is online now
victory in near
 
Join Date: Sep 2008
Location: North Vancouver
Posts: 1,817
I was talking to someone at UBC the other day and it seems the construction of the skytrain at UBC is going to be a big worry because it could disturb and rattle some very sensitive research equipment.
__________________
i have no idea what's going on
     
     
  #10379  
Old Posted Jan 21, 2020, 12:22 AM
swimmer_spe swimmer_spe is offline
BANNED
 
Join Date: Apr 2014
Posts: 10,743
Quote:
Originally Posted by djmk View Post
I was talking to someone at UBC the other day and it seems the construction of the skytrain at UBC is going to be a big worry because it could disturb and rattle some very sensitive research equipment.
If it can take an earthquake, it can take construction of a tunnel.
     
     
  #10380  
Old Posted Jan 21, 2020, 12:22 AM
CanSpice's Avatar
CanSpice CanSpice is offline
Registered User
 
Join Date: Dec 2014
Location: New Westminster, BC
Posts: 2,729
Quote:
Originally Posted by swimmer_spe View Post
If it can take an earthquake, it can take construction of a tunnel.
There's a difference between an earthquake lasting a minute, after which you can recalibrate things within a day to a week, and a construction project lasting months, if not years.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 11:53 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.