Quote:
Originally Posted by aberdeen5698
If we're talking Skytrain, then I don't see why it couldn't. LIM technology can handle grades similar to road bridges, it would just be a matter of partitioning the track from everything the other bridge users.
|
SkyTrain can handle the grade, no doubt - my concern is if the bridge can handle the SkyTrain. Might be a failure of imagination, but I've never heard of an RRT crossing a river without a separate deck.