Quote:
Originally Posted by J.OT13 View Post
Did not know they weren't the same week. Thanks!



Agreed. Massive waste of space. We blindly ordered the 38 Stage 2 vehicles without making any modifications. I get that it was done well before the launch, but the City could have at least accepted feedback from the public based on the model we had at Lansdowne or just general observations from OC staff.

Hopefully, more thought will be put into the Stage 3 order.
I don't think this model of train can be ordered without being two ended and probably not a good idea anyways as it limits the flexibility of the deployment of the fleet. We have all seen the models available and none of them are long enough to meet our needs as single cars.

The U of Ottawa student base will have the greatest impact on the C-Line so we may have seen a one week reprieve.
     
     
  #13122  
Old Posted Oct 17, 2019, 8:24 PM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,806
Quote:
Originally Posted by Hybrid247 View Post
No idea where you read that but that is absolutely false. The longest dwell times on the system are approx. 40 seconds during peak periods. If they dwell longer than that it is for reasons other than waiting for alighting/boarding.
Perhaps the 1 m 40 sec is the overall impact on travel times of extending dwell times at all stations combined. This would also explain the desire (urgency) of adding a 14th train. Extending travel times is going to make the trains even more crowded.

It is too bad we aren't getting the 15th train into service. Any way to reduce crowding will allow dwell times to be reduced as well as travel times. This will result in better service for everybody.
     
     
  #13123  
Old Posted Oct 17, 2019, 9:22 PM
kmcamp kmcamp is offline
Registered User
 
Join Date: Sep 2016
Posts: 1,401
Quote:
Originally Posted by J.OT13 View Post
Did not know they weren't the same week. Thanks!



Agreed. Massive waste of space. We blindly ordered the 38 Stage 2 vehicles without making any modifications. I get that it was done well before the launch, but the City could have at least accepted feedback from the public based on the model we had at Lansdowne or just general observations from OC staff.

Hopefully, more thought will be put into the Stage 3 order.
Really our trains aren't bad. Go try riding the train in Seattle, Boston, or Minneapolis. After riding our trains for a bit it was eye opening to ride a smaller vehicle. The stairs at each end and the tiny little middle section make our seem enormous. They went with the longest LRV available on the market. Nobody builds anything bigger than the 59m 5 module variant. It's also eye opening to ride a typical non open gangway subway if you haven't recently.
     
     
  #13124  
Old Posted Oct 18, 2019, 2:07 PM
zzptichka zzptichka is offline
Registered User
 
Join Date: Dec 2015
Location: Outaouias
Posts: 2,392
Latest Tunney's timelapse during evening rush: https://www.reddit.com/r/ottawa/comments/djmtm8/tunneys_pasture_station_timelapse_again/
Those are pretty long walks ...
Also half of those buses in laybys don't move at all. Not exactly very efficient use of space.
     
     
  #13125  
Old Posted Oct 18, 2019, 2:17 PM
CityTech CityTech is offline
Registered User
 
Join Date: May 2016
Location: Ottawa
Posts: 2,798
Quote:
Originally Posted by zzptichka View Post
Latest Tunney's timelapse during evening rush: https://www.reddit.com/r/ottawa/comments/djmtm8/tunneys_pasture_station_timelapse_again/
Those are pretty long walks ...
Also half of those buses in laybys don't move at all. Not exactly very efficient use of space.
They have buses scheduled to arrive at the layup spots a good 5-10 minutes before they're scheduled to start their route. This is so that buses can make up for any delays and start their routes at Tunney's on time. It's not surprising this would result in layups being very well used.

One issue OC Transpo has though is bus drivers arriving at layups with time to spare, but then staying in the layup spot too late. Everyone who's ever gotten a bus starting at a terminal knows what I'm talking about.. your bus is scheduled to leave at 4:00, and the bus driver is too busy chatting with this colleague in the layup spot next to him or reading a book and doesn't leave until 4:02, getting to the stop at 4:03 and leaving at 4:04 (once everyone boards) and boom, the trip is already 4 minutes late and it's just started. It was a minor nuisance before, now at the likes of Tunney's and Blair it's a serious problem.
     
     
  #13126  
Old Posted Oct 18, 2019, 3:17 PM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,806
The clip shows that Tunney's Pasture is at times beyond capacity with buses lining up. Not so much different than the old Hurdman Transitway Station.
     
     
  #13127  
Old Posted Oct 18, 2019, 3:44 PM
TransitZilla TransitZilla is offline
Registered User
 
Join Date: Dec 2006
Posts: 2,800
Quote:
Originally Posted by lrt's friend View Post
The clip shows that Tunney's Pasture is at times beyond capacity with buses lining up. Not so much different than the old Hurdman Transitway Station.
Where do you see that?

To my eyes this clip looks like everything was working very smoothly at the time...
     
     
  #13128  
Old Posted Oct 18, 2019, 3:52 PM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,806
Quote:
Originally Posted by bradnixon View Post
Where do you see that?

To my eyes this clip looks like everything was working very smoothly at the time...
At times, you see the buses backing up. It is time lapsed so what looks like smooth flow is not always so. Most of the time, it is working well, I agree.
     
     
  #13129  
Old Posted Oct 18, 2019, 4:44 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,090
Quote:
Originally Posted by kmcamp View Post
Really our trains aren't bad. Go try riding the train in Seattle, Boston, or Minneapolis. After riding our trains for a bit it was eye opening to ride a smaller vehicle. The stairs at each end and the tiny little middle section make our seem enormous. They went with the longest LRV available on the market. Nobody builds anything bigger than the 59m 5 module variant. It's also eye opening to ride a typical non open gangway subway if you haven't recently.
I've never been on any other "light-rail" system, but I take your point on the non-open gangway subways. There is quite a difference between the Montréal Azure and the MR-73s or Vancouver's Mark I (12.7 meter cars), II (33.4 meter cars) and III (full 76 meter or so open train).

I hope that by the time we order trains for Stage 3, we can challenge manufacturers to come up with a full 100+ meter light-rail vehicle. As we've seen in Vancouver, Montreal and Toronto, manufacturers were eventually able to figure it out for heavy rail. Why not light rail?

Sidenote, Boston's new Chinese subway fleet order sticks with individual 20 meter cars. That's shocking to me considering open gangways are the new norm. Terrible decision.

https://en.wikipedia.org/wiki/Orange_Line_(MBTA)#Rolling_stock
     
     
  #13130  
Old Posted Oct 18, 2019, 6:35 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,090
New addition to Lyon Station and, I'm sure, all other stations eventually.

Doors don't quite align, however.


https://twitter.com/Milnoc/status/1185231380504109063
     
     
  #13131  
Old Posted Oct 18, 2019, 8:14 PM
Badyouken's Avatar
Badyouken Badyouken is offline
Registered User
 
Join Date: Feb 2016
Posts: 239
Oh excellent.
     
     
  #13132  
Old Posted Oct 18, 2019, 8:22 PM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by J.OT13 View Post
New addition to Lyon Station and, I'm sure, all other stations eventually.

Doors don't quite align, however.


https://twitter.com/Milnoc/status/1185231380504109063
Why weren't those there from day one? Most automated systems have them, so it is nothing new. It might be possible that OC Transpo didn't know about their existence, but the RTG should have known and recommended them.
     
     
  #13133  
Old Posted Oct 18, 2019, 8:34 PM
kmcamp kmcamp is offline
Registered User
 
Join Date: Sep 2016
Posts: 1,401
Quote:
Originally Posted by roger1818 View Post
Why weren't those there from day one? Most automated systems have them, so it is nothing new. It might be possible that OC Transpo didn't know about their existence, but the RTG should have known and recommended them.
I'm kind of surprised because the two inner modules are asymmetrical. I was at Lyon today and they just made a big one for the place where it might be two doors or one. That's the one in the tweet. They line up fine for the end modules which are always two doors.
     
     
  #13134  
Old Posted Oct 18, 2019, 8:35 PM
TheMatth69 TheMatth69 is offline
Registered User
 
Join Date: Apr 2019
Posts: 158
Quote:
Originally Posted by J.OT13 View Post
New addition to Lyon Station and, I'm sure, all other stations eventually.

Doors don't quite align, however.


https://twitter.com/Milnoc/status/1185231380504109063
And already people standing straight in the middle of the things while it clearly means that you have to board from the side of the doors... ... Gonna start thinking that people in Ottawa are just straight up dumb
     
     
  #13135  
Old Posted Oct 18, 2019, 9:11 PM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,671
Riders don't know where to stand when train arrives, so the city is installing markings on LRT platforms

Jon Willing, Ottawa Citizen
Updated: October 18, 2019


OC Transpo recorded more than three million rides on the LRT system between the launch on Sept. 14 and last Tuesday, as the agency does more work to help people navigate the stations.

Transpo said Friday that it’s installing markings on the platforms where the train doors stop, telling people waiting to get on the train where, and where not, to stand.

There’s still a frustrating problem of eager passengers trying to get on a train as soon as it pulls into a station without letting passengers off first. The markings tell people waiting for the train to stand at the side of the doors, keeping the exit clear for passengers leaving.


https://twitter.com/Diaspora3

New platform markings will also tell passengers to spread out down the platform, rather than crowding around a couple of train doors.

Transpo is also making improvements to the peak-period passenger flow at Tunney’s Pasture Station. The agency is removing one of the doors between the station and the bus platforms and pinning open the other door. Transpo said permanent adjustments will be made once the designs are complete. New decals being installed this week will help people identify where the two LRT platforms are.

The agency is also reviewing two different design options for canopies to protect customers from harsh weather in the bus area of Tunney’s Pasture.

When it comes to the train doors, Transpo said it’s working to improve their reliability and has made adjustments to the troubleshooting process for door faults. Passengers prying open and pushing doors caused them to jam two mornings in a row at the busiest times of day earlier this month.

Transpo has increased the time the train doors are open for passengers at five stations: Lyon, Parliament, Rideau, uOttawa and Hurdman. The door dwell times are automated, but according to Transpo, train operators can keep the doors open at busy stations when warranted.

Another significant morning-rush delay happened earlier this month when a train computer system shut down at Bayview Station. Transpo said it has assessed all of the onboard computers and calibrated the systems to reduce faults. The agency is testing new software and will implement the upgrades this month if the testing checks out.

Transpo intends to keep technicians available on every Confederation Line train until at least the end of December, but it would consider extending the time if necessary.

The O-Train ambassadors — the red-vested staff who are helping customers at the stations — will continue at their posts until at least December, and longer if necessary, Transpo said.

At Blair Station, Transpo has been receiving customer concerns about the reliability of the north-side elevator, which wasn’t part of the LRT project. Staff are trying to find the money to replace the elevator.

Transpo also confirmed it will install straps for people to grab for stability on the trains. One criticism was that shorter people couldn’t reach the overhead horizontal bars. Alstom, which manufacturers the trains, is helping with the safety requirements.

Councillors have been receiving assurances from Transpo management that staff are looking for ways to improve the bus network that connects to LRT stations.

Innes Coun. Laura Dudas said this week she intends to file an inquiry with staff at the council meeting Wednesday asking about problems with service reliability. She wants to know what it will take to get buses arriving as scheduled.

Transpo told councillors on Friday that it plans to make adjustments to routes “where we see repetitive issues or areas of major concern.” The agency has expected it would take two or three weeks after the bus network changed on Oct. 6 for customers and operations to “adjust and stabilize.” Transpo didn’t say what adjustments would be coming, but councillors are expected to have more meetings with transit staff to go over their concerns.

Meanwhile, the Rideau Transit Group continues road work associated with the LRT project.

On Saturday, between 7 a.m. and 4 p.m., RTG planned to close the right lane on northbound Nicholas Street between uOttawa Station and Laurier Avenue to remove temporary concrete barriers. The work will set the stage for RTG to realign a section of median on Nicholas near the station and begin reconnecting Nicholas to Waller Street, south of Laurier.

[email protected]
twitter.com/JonathanWilling

https://ottawacitizen.com/news/local-new...-is-installing-markings-on-lrt-platforms

Last edited by rocketphish; Oct 19, 2019 at 2:59 AM. Reason: Fixed broken image
     
     
  #13136  
Old Posted Oct 18, 2019, 9:38 PM
RationalPhi RationalPhi is offline
1.6180339887498948482...
 
Join Date: Oct 2019
Posts: 11
Quote:
Originally Posted by lrt's friend View Post
At times, you see the buses backing up. It is time lapsed so what looks like smooth flow is not always so. Most of the time, it is working well, I agree.
They posted a less sped up version where it's more obvious that the buses do get backed up quite often (then satisfyingly clear out). https://www.youtube.com/watch?v=aI7W58hjxA8
     
     
  #13137  
Old Posted Oct 18, 2019, 10:30 PM
OtrainUser OtrainUser is offline
Registered User
 
Join Date: Jul 2017
Posts: 619
Quote:
Originally Posted by TheMatth69 View Post
And already people standing straight in the middle of the things while it clearly means that you have to board from the side of the doors... ... Gonna start thinking that people in Ottawa are just straight up dumb
They are dumb
     
     
  #13138  
Old Posted Oct 18, 2019, 11:57 PM
swimmer_spe swimmer_spe is offline
BANNED
 
Join Date: Apr 2014
Posts: 10,743
Quote:
Originally Posted by rocketphish View Post
Riders don't know where to stand when train arrives, so the city is installing markings on LRT platforms

Jon Willing, Ottawa Citizen
Updated: October 18, 2019


OC Transpo recorded more than three million rides on the LRT system between the launch on Sept. 14 and last Tuesday, as the agency does more work to help people navigate the stations.

Transpo said Friday that it’s installing markings on the platforms where the train doors stop, telling people waiting to get on the train where, and where not, to stand.

There’s still a frustrating problem of eager passengers trying to get on a train as soon as it pulls into a station without letting passengers off first. The markings tell people waiting for the train to stand at the side of the doors, keeping the exit clear for passengers leaving.


https://twitter.com/Diaspora3

New platform markings will also tell passengers to spread out down the platform, rather than crowding around a couple of train doors.

Transpo is also making improvements to the peak-period passenger flow at Tunney’s Pasture Station. The agency is removing one of the doors between the station and the bus platforms and pinning open the other door. Transpo said permanent adjustments will be made once the designs are complete. New decals being installed this week will help people identify where the two LRT platforms are.

The agency is also reviewing two different design options for canopies to protect customers from harsh weather in the bus area of Tunney’s Pasture.

When it comes to the train doors, Transpo said it’s working to improve their reliability and has made adjustments to the troubleshooting process for door faults. Passengers prying open and pushing doors caused them to jam two mornings in a row at the busiest times of day earlier this month.

Transpo has increased the time the train doors are open for passengers at five stations: Lyon, Parliament, Rideau, uOttawa and Hurdman. The door dwell times are automated, but according to Transpo, train operators can keep the doors open at busy stations when warranted.

Another significant morning-rush delay happened earlier this month when a train computer system shut down at Bayview Station. Transpo said it has assessed all of the onboard computers and calibrated the systems to reduce faults. The agency is testing new software and will implement the upgrades this month if the testing checks out.

Transpo intends to keep technicians available on every Confederation Line train until at least the end of December, but it would consider extending the time if necessary.

The O-Train ambassadors — the red-vested staff who are helping customers at the stations — will continue at their posts until at least December, and longer if necessary, Transpo said.

At Blair Station, Transpo has been receiving customer concerns about the reliability of the north-side elevator, which wasn’t part of the LRT project. Staff are trying to find the money to replace the elevator.

Transpo also confirmed it will install straps for people to grab for stability on the trains. One criticism was that shorter people couldn’t reach the overhead horizontal bars. Alstom, which manufacturers the trains, is helping with the safety requirements.

Councillors have been receiving assurances from Transpo management that staff are looking for ways to improve the bus network that connects to LRT stations.

Innes Coun. Laura Dudas said this week she intends to file an inquiry with staff at the council meeting Wednesday asking about problems with service reliability. She wants to know what it will take to get buses arriving as scheduled.

Transpo told councillors on Friday that it plans to make adjustments to routes “where we see repetitive issues or areas of major concern.” The agency has expected it would take two or three weeks after the bus network changed on Oct. 6 for customers and operations to “adjust and stabilize.” Transpo didn’t say what adjustments would be coming, but councillors are expected to have more meetings with transit staff to go over their concerns.

Meanwhile, the Rideau Transit Group continues road work associated with the LRT project.

On Saturday, between 7 a.m. and 4 p.m., RTG planned to close the right lane on northbound Nicholas Street between uOttawa Station and Laurier Avenue to remove temporary concrete barriers. The work will set the stage for RTG to realign a section of median on Nicholas near the station and begin reconnecting Nicholas to Waller Street, south of Laurier.

[email protected]
twitter.com/JonathanWilling

https://ottawacitizen.com/news/local-new...-is-installing-markings-on-lrt-platforms
It's almost a though the city didn't have a rapid transit line before....
     
     
  #13139  
Old Posted Oct 19, 2019, 3:36 AM
PHrenetic PHrenetic is offline
Registered User
 
Join Date: Jun 2016
Location: Ottawa
Posts: 1,029
Quote:
Originally Posted by swimmer_spe View Post
It's almost a though the city didn't have a rapid transit line before....
Good Day.

We didn't.

We had a pilot project train that the -relatively- few users got used to, and were -somewhat- polite about protocol, eventually.

And the BRT TransitWay was not a rapid transit line.
It was, and should not have been, an amalgam of one-seat commuter lines overcrowding the few real transit lines running down the Way.
Result, a TransitWay that never worked as it should have, and was supposed to have, and was sold to us as being - a bus-train of buses shuttling back-and-forth along the way, every bus is your bus, picking up from and dropping off to the feeder routes (including those one-seat wonders) at each and every stop on the Way.
A spine system, requiring transfers. Yup - big city stuff.

We now have a full blown, big-city, in production, spine system, with which the -majority- of users are not yet used to, and know nothing of the polite protocol necessary,
being too used to the door-crush insanity forced upon, and bred into, all of us
by enough drivers who have often enough closed doors in our faces (getting on or off, stranding us on or off), driven away from us or skipped over our stop (so we wait an hour for the next bus), cut out of the stop bus line queue before completing the stop conga (leaving us behind for the next bus an hour later), and on and on and on.
(not all - by a long shot. I have ridden with many good ones. But ! )

Result - a learning curve for a whole city of users - frequent and occasional, commuters and errand-runners and shoppers, students and workers, etc.
Quote:
Originally Posted by OtrainUser
They are dumb.
Not all dumb (though a trainload of 'em really are !), but frustrated by it, tired of it, and have had enough of it.

It's gonna take a lotta time, patience, and bitchin', to get this thing right.

Even the Montreal Metro had growing pains back in '66 - it was good, but not all sweetness and light.

And by all reports (personal, anecdotal, media), TTC subway and STM Metro are both suffering from overcrowding these days, with people jams at the doors and on the platforms.
(yeah, i'm still astonished at OUR platforms - my sense of it still says they are too....too....too narrow for even a moving rush hour, let alone a crush rush load.
And they are all identical in space, essentially, with those locations which had room not taking advantage of it to spread out even a bit !?!)
So.....given this is a brand new system, we should......should......have capacity for less crowding than what we have. We were supposed to !!!!
Dear Mr. Manconi.......where are those other two trains, please ?! At the least.
And where are the subsequent ones we purchased early, to have been anticipating this very problem, please ?!

Ah, well.......We Will EnJoy It ..... eventually !
     
     
  #13140  
Old Posted Oct 19, 2019, 4:37 AM
Gat-Train Gat-Train is offline
BANNED
 
Join Date: Nov 2018
Posts: 508
Quote:
Originally Posted by lrt's friend View Post

The U of Ottawa student base will have the greatest impact on the C-Line so we may have seen a one week reprieve.
It's almost as if this week would have been a perfect opportunity to enact the greatest service change ever in the city and start working out the teething issues. But no, they couldn't have waited one more week
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 10:36 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.