Here is the tender info
Ring Road Northbound and Southbound over Wascana Creek Bridge Replacements
Synopsis:
Sealed Tenders marked "Ring Road Northbound and Southbound over Wascana Creek Bridge Replacements - Tender No. 4513" using the submission label (Appendix E) will be received by the City of Regina at the 5th Floor, Purchasing Branch or Main Floor, Ambassadors Desk at City Hall, 2476 Victoria Avenue, P.O. Box 1790, Regina, Saskatchewan, S4P 3C8, no later than 2:00 P.M. Central Standard Time, January 24, 2019.
The major items of work are as follows:
Design, installation, maintenance, and removal of temporary paved crossovers;
Design, setup, maintenance, and removal of traffic control devices;
Remove existing asphalt, girders, bridgerails, and approach guardrails;
Demolish existing abutments, piers, and retaining walls;
Drive new abutment and pier piles;
Pour new concrete abutments and wingwalls;
Install new precast concrete pier caps and box girders;
Additional Information:
Pour new concrete deck overlay, approach slabs, barriers, and drainage troughs;
Apply waterproofing membrane and place asphalt on bridge;
Install new bridgerails and approach guardrails;
Apply sealers;
Widen embankments and roadways;
Repave approach roadways; and
Site restoration