HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan


Closed Thread

 
Thread Tools Display Modes
     
     
  #8701  
Old Posted Dec 7, 2018, 10:23 PM
BrutallyDishonest2 BrutallyDishonest2 is offline
Registered User
 
Join Date: Apr 2015
Posts: 1,426
I'm not against public art. I'm against the horrible Glockenspiel that like 15 people want. It's expensive, annoying and has no redeeming qualities.

Go pay a real artist to put some sculptures in the park if we want to support the arts.
     
     
  #8702  
Old Posted Dec 8, 2018, 1:42 AM
Dan0myte Dan0myte is offline
Registered User
 
Join Date: Jul 2009
Posts: 927
Don't know if it's been discussed before, but I'm really excited for the Harbour Landing Popeye's Chicken. Looks like it's almost ready to open.
     
     
  #8703  
Old Posted Dec 10, 2018, 5:49 AM
skphc08's Avatar
skphc08 skphc08 is offline
Registered User
 
Join Date: Jun 2008
Location: South Central
Posts: 238
Quote:
Originally Posted by Dan0myte View Post
Don't know if it's been discussed before, but I'm really excited for the Harbour Landing Popeye's Chicken. Looks like it's almost ready to open.
Have you been to the other location? It seemed very...average.
__________________
Everything is real on this concrete and steel.
     
     
  #8704  
Old Posted Dec 20, 2018, 1:38 AM
BrutallyDishonest2 BrutallyDishonest2 is offline
Registered User
 
Join Date: Apr 2015
Posts: 1,426
In other random news, SaskPower tore down this lovely old little substation in Cathedral.

I have no idea about the state of/make-up of the building, but it would have made a nice little shop for the neighbourhood. Hopefully something other than a parking lot shows up.

Last edited by BrutallyDishonest2; Dec 20, 2018 at 1:03 PM.
     
     
  #8705  
Old Posted Dec 20, 2018, 4:49 AM
Stormer's Avatar
Stormer Stormer is offline
Registered User
 
Join Date: Jan 2008
Posts: 7,997
Quote:
Originally Posted by BrutallyDishonest2 View Post
In other random news, SaskPower tore down this lovely old little substation in Cathedral.

I have no idea about the state of make-up of the building, but it would have made a nice little shop for the neighbourhood. Hopefully something other than a parking lot shows up.
Sad. I've always admired that place.
     
     
  #8706  
Old Posted Dec 20, 2018, 1:15 PM
Draftsman Draftsman is offline
Registered User
 
Join Date: May 2011
Location: Regina, Saskatchewan
Posts: 989
Quote:
Originally Posted by BrutallyDishonest2 View Post
In other random news, SaskPower tore down this lovely old little substation in Cathedral.

I have no idea about the state of/make-up of the building, but it would have made a nice little shop for the neighbourhood. Hopefully something other than a parking lot shows up.
I was surprised at this demolition. It was a unique little building, especially on a block with unremarkable buildings. Sad.

From cbc.ca/news...

https://www.cbc.ca/news/canada/saskatchewan/sask-power-substation-2-regina-demolition-1.4952769
     
     
  #8707  
Old Posted Dec 20, 2018, 3:17 PM
prairieguy prairieguy is offline
Registered User
 
Join Date: Apr 2007
Posts: 1,570
A similar building in Saskatoon, just off of Broadway on Main Street, houses an architecture firm. The 'historic' red brick facade and design is very much like the one torn down in Regina. It really is too bad....
     
     
  #8708  
Old Posted Dec 21, 2018, 2:23 AM
BrutallyDishonest2 BrutallyDishonest2 is offline
Registered User
 
Join Date: Apr 2015
Posts: 1,426
I'll say that Krovemaker is typically best ignored because he's a crank who will support any old building. If the lot is well developed I'll be happy, but it's unlikely.
     
     
  #8709  
Old Posted Jan 2, 2019, 4:28 PM
North_Regina_Boy North_Regina_Boy is offline
Registered User
 
Join Date: Mar 2010
Location: Regina, SK (formerly Saskatoon)
Posts: 1,474
Regina’s South Ring Road will be a mess again this summer (2019) a tender on Sask tenders is about to close this month that will see both the north and southbound bridges over the Wascana creek be completely torn down and redone, as they have reached their lifespans.

Hope that Bypass will be open south side to allow trucks go around by the time they start!

Enjoy!
     
     
  #8710  
Old Posted Jan 2, 2019, 7:15 PM
Stormer's Avatar
Stormer Stormer is offline
Registered User
 
Join Date: Jan 2008
Posts: 7,997
Quote:
Originally Posted by North_Regina_Boy View Post
Regina’s South Ring Road will be a mess again this summer (2019) a tender on Sask tenders is about to close this month that will see both the north and southbound bridges over the Wascana creek be completely torn down and redone, as they have reached their lifespans.

Hope that Bypass will be open south side to allow trucks go around by the time they start!

Enjoy!
It would be insanity to do this before the new bypass is open.
     
     
  #8711  
Old Posted Jan 2, 2019, 7:31 PM
North_Regina_Boy North_Regina_Boy is offline
Registered User
 
Join Date: Mar 2010
Location: Regina, SK (formerly Saskatoon)
Posts: 1,474
Quote:
Originally Posted by Stormer View Post
It would be insanity to do this before the new bypass is open.
Well with the amount of paving they got done last year, it is feasible to be open by Early June. But will it...

Here is the tender info

Ring Road Northbound and Southbound over Wascana Creek Bridge Replacements

Synopsis:
Sealed Tenders marked "Ring Road Northbound and Southbound over Wascana Creek Bridge Replacements - Tender No. 4513" using the submission label (Appendix E) will be received by the City of Regina at the 5th Floor, Purchasing Branch or Main Floor, Ambassadors Desk at City Hall, 2476 Victoria Avenue, P.O. Box 1790, Regina, Saskatchewan, S4P 3C8, no later than 2:00 P.M. Central Standard Time, January 24, 2019.

The major items of work are as follows:

Design, installation, maintenance, and removal of temporary paved crossovers;
Design, setup, maintenance, and removal of traffic control devices;
Remove existing asphalt, girders, bridgerails, and approach guardrails;
Demolish existing abutments, piers, and retaining walls;
Drive new abutment and pier piles;
Pour new concrete abutments and wingwalls;
Install new precast concrete pier caps and box girders;


Additional Information:
Pour new concrete deck overlay, approach slabs, barriers, and drainage troughs;
Apply waterproofing membrane and place asphalt on bridge;
Install new bridgerails and approach guardrails;
Apply sealers;
Widen embankments and roadways;
Repave approach roadways; and
Site restoration
     
     
  #8712  
Old Posted Jan 5, 2019, 6:58 PM
StealthGirl's Avatar
StealthGirl StealthGirl is offline
Registered User
 
Join Date: Jun 2008
Posts: 1,277
The city said that the repairs to the Assiniboine-Ring Road flyover were delayed bc they will be done the same time as the Wascana Creek bridge work.
     
     
  #8713  
Old Posted Jan 5, 2019, 9:11 PM
UPP UPP is offline
Registered User
 
Join Date: Jan 2011
Location: Regina, Canada
Posts: 592
Quote:
Originally Posted by StealthGirl View Post
The city said that the repairs to the Assiniboine-Ring Road flyover were delayed bc they will be done the same time as the Wascana Creek bridge work.
Ughh. Fantastic. What they need to do is completely overhaul the Ring Road there, dig it down so that the overpass has 5 m clearance instead of the 4.5 it currently has. It's constantly dinged by trucks.
     
     
  #8714  
Old Posted Jan 5, 2019, 11:30 PM
North_Regina_Boy North_Regina_Boy is offline
Registered User
 
Join Date: Mar 2010
Location: Regina, SK (formerly Saskatoon)
Posts: 1,474
Quote:
Originally Posted by StealthGirl View Post
The city said that the repairs to the Assiniboine-Ring Road flyover were delayed bc they will be done the same time as the Wascana Creek bridge work.
Appears they changed their minds, unless a Tender to redo that bridge comes out?
     
     
  #8715  
Old Posted Jan 6, 2019, 12:14 AM
brithgob brithgob is offline
Registered User
 
Join Date: Dec 2006
Posts: 833
Quote:
Originally Posted by UPP View Post
Ughh. Fantastic. What they need to do is completely overhaul the Ring Road there, dig it down so that the overpass has 5 m clearance instead of the 4.5 it currently has. It's constantly dinged by trucks.
Should happen less when most of the trucks are using the bypass.
     
     
  #8716  
Old Posted Jan 7, 2019, 3:12 PM
JustACitizen JustACitizen is offline
Registered User
 
Join Date: Oct 2017
Posts: 24
Quote:
Originally Posted by North_Regina_Boy View Post
Regina’s South Ring Road will be a mess again this summer (2019) a tender on Sask tenders is about to close this month that will see both the north and southbound bridges over the Wascana creek be completely torn down and redone, as they have reached their lifespans.

Hope that Bypass will be open south side to allow trucks go around by the time they start!

Enjoy!
Do you think it is also time to widen the bridge to 3 lanes northbound to support a future 3rd lane north from Wascana Parkway to Assiniboine offramp. This would be a forward looking enhancement rather than replacing only to have to redo again in a couple years.
     
     
  #8717  
Old Posted Jan 10, 2019, 9:26 PM
StealthGirl's Avatar
StealthGirl StealthGirl is offline
Registered User
 
Join Date: Jun 2008
Posts: 1,277
Quote:
Originally Posted by JustACitizen View Post
Do you think it is also time to widen the bridge to 3 lanes northbound to support a future 3rd lane north from Wascana Parkway to Assiniboine offramp. This would be a forward looking enhancement rather than replacing only to have to redo again in a couple years.
I can't see the city doing it. Look at the mess with the Arcola bridge. They should've widened it.

The city is still claiming the flyover is in that project despite no mention in the tender.
     
     
  #8718  
Old Posted Jan 10, 2019, 9:37 PM
Stormer's Avatar
Stormer Stormer is offline
Registered User
 
Join Date: Jan 2008
Posts: 7,997
Quote:
Originally Posted by StealthGirl View Post
I can't see the city doing it. Look at the mess with the Arcola bridge. They should've widened it.

The city is still claiming the flyover is in that project despite no mention in the tender.
I agree. The City is not forward looking on these projects. Potential projects come up in a long-term plan documents years or even decades before the engineering is completed. Once the engineering is done and the funding from other levels of government is in place, they are locked in. They are building infrastructure without regard to current, let alone future, needs.

I fear the Winnipeg street overpass replacement is another of these. The focus should be instead on the adjacent rail crossings. When the overpass replacement was originally envisioned there were far fewer trains on those tracks.
     
     
  #8719  
Old Posted Jan 11, 2019, 2:24 PM
HomeInMyShoes's Avatar
HomeInMyShoes HomeInMyShoes is offline
arf
 
Join Date: May 2005
Location: File 13
Posts: 14,625
Completely agreed. When the city did the Broad Street Bridge over the lake they should have widened it the three meters for bike lanes which would have continued from Wascana Parkway, but they didn't. They can't even do the easy wins properly why would they do the more difficult ones any better.
__________________

-- “We heal each other with kindness, gentleness and respect.” -- Richard Wagamese
-- “Unless someone like you cares a whole awful lot, Nothing is going to get better. It's not.” -- Dr. Seuss
     
     
  #8720  
Old Posted Jan 11, 2019, 10:22 PM
StealthGirl's Avatar
StealthGirl StealthGirl is offline
Registered User
 
Join Date: Jun 2008
Posts: 1,277
YWCA wants to build a new facility in Cathedral. $35-million facility at the site of the former Victoria School and Lucy Eley Park. (A block north of Victoria between Rae and Retallack). City would gift the land.

Quote:
Originally Posted by LeaderPost
The centre would host traditional healing and medicine spaces for Indigenous women — as well as the city’s first indoor sweat lodge. The plan calls for a commercial kitchen to help run employment programs and an additional 14 affordable housing spaces. Shelters currently housed downtown would move to the new site.

It even includes a harm reduction facility. Coomber-Bendtsen called it a “chill-out space” for women who are intoxicated. It could avoid the need to call police.

According to Coomber-Bendtsen, the centre will bring a wide range of community organizations under one roof. They’re hoping to welcome groups like Regina Mobile Crisis Services and Regina Sexual Assault Centre.

...The idea passed unanimously at a meeting of council’s Finance and Administration Committee on Tuesday. It will now go to a full meeting of city council on Jan. 28 for final approval.
https://leaderpost.com/news/local-news/y...-with-city-likely-to-pitch-in-free-land?

I wonder how much opposition this will face.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 7:56 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.