HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


Reply

 
Thread Tools Display Modes
     
     
  #3301  
Old Posted Dec 18, 2018, 5:10 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is online now
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,559
Quote:
Originally Posted by VancouverOfTheFuture View Post
haha.
i am glad i didn't vote NDP with this shit and the taxes from the City and Province all increasing. sadly all those people believed the NDP when they'd get rid of the MSP premiums. with the 5% increase in property tax, i will be paying more on-top of that "school tax" scam.
Wow, you own a place over $3M? Nice.
Reply With Quote
     
     
  #3302  
Old Posted Dec 18, 2018, 5:21 PM
CanSpice's Avatar
CanSpice CanSpice is offline
Registered User
 
Join Date: Dec 2014
Location: New Westminster, BC
Posts: 2,708
Quote:
Originally Posted by libtard View Post
Can you give an example of a crossing (IN NORTH AMERICA) that has dedicated lanes for heavy trucks? What is a dedicated heavy truck lane? I’m legitimately trying to understand what you’re proposing. So if a semi truck crosses the bridge and it isn’t in said lane, it gets fined an amount of money? How does this work?
Go back through this thread and find the posts where people were falling over themselves describing how big trucks need a dedicated lane to go slow in while they climb over the bridge and this was a justification for a ten lane bridge.
Reply With Quote
     
     
  #3303  
Old Posted Dec 18, 2018, 7:01 PM
libtard's Avatar
libtard libtard is offline
Dahvie Fan
 
Join Date: Aug 2012
Posts: 1,307
Quote:
Originally Posted by CanSpice View Post
Go back through this thread and find the posts where people were falling over themselves describing how big trucks need a dedicated lane to go slow in while they climb over the bridge and this was a justification for a ten lane bridge.
So you basically have no idea what you’re talking about. Got it
Reply With Quote
     
     
  #3304  
Old Posted Dec 18, 2018, 7:58 PM
M00dy M00dy is offline
Registered User
 
Join Date: Nov 2016
Posts: 136
Quote:
Originally Posted by WarrenC12 View Post
Giving the old can a big boot down the road. Looks like 10 lanes is out, 6-8 lanes in bridge or tunnel form is possible.

I think another tunnel is the most reasonable for the soil conditions in this area.

Next scheduled election is Oct 21, 2021. Assuming the government doesn't fall for other issues. This will definitely be an election issue.
I would seriously like to hear your explanation for why the soil conditions make a tunnel a better choice. I was under the impression one of the main issues was that the existing tunnel sits on liquifyable soils that would fail in an earthquake.
Reply With Quote
     
     
  #3305  
Old Posted Dec 18, 2018, 8:57 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is online now
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,559
Quote:
Originally Posted by M00dy View Post
I would seriously like to hear your explanation for why the soil conditions make a tunnel a better choice. I was under the impression one of the main issues was that the existing tunnel sits on liquifyable soils that would fail in an earthquake.
Reasonable from a cost perspective. I'm sure they can be made to modern seismic standards.

Part of the reason the GMB proposal was so massive and expensive is because of how high it needed to go, and how much ground level work needed to be done due to where they were building.

It's also the reason a tunnel was built in 1959.
Reply With Quote
     
     
  #3306  
Old Posted Dec 18, 2018, 10:44 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,518
Yeah, the 9th and 10th lanes were truck climbing lanes due to the steep slope.
That's also why when the 5th lane was added to the old Port Mann Bridge, it was added on the eastbound side because that where trucks entering the highway slowed to a crawl to climb the bridge slope.

The Cape Horn interchange has a dedicated "Trucks Only" exit to Pacific Reach Business Park:


https://www.google.ca/maps/@49.2292665,-...itch%3D0%26thumbfov%3D100!7i13312!8i6656

The Report says that a shorter span (between towers) would also allow slightly shallower approach ramps. Tweaking the bridge like that could result in a cumulative savings of up to $500M.
Reply With Quote
     
     
  #3307  
Old Posted Dec 18, 2018, 11:13 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,518
Here are the interesting bits regarding bridge design and Steveston Hwy & Hwy 17A interchanges from the Report:
















https://engage.gov.bc.ca/app/uploads/sit...g_Independent-Technical-Review_FINAL.pdf

Last edited by officedweller; Dec 20, 2018 at 3:27 AM.
Reply With Quote
     
     
  #3308  
Old Posted Dec 18, 2018, 11:34 PM
Mininari Mininari is offline
Registered User
 
Join Date: Jul 2004
Location: Victoria (formerly Port Moody, then Winnipeg)
Posts: 2,446
Its clear that they removed the tolls, took over the Patullo project, and now have no money for this. Nothing will happen at this crossing until the NDP have attained their majority government. Everything they've rolled out to date is to make the liberals look really bad, and make the NDP platform make everyone feel really good. The only question left is, when does the present government fall (i.e. when does the NDP feel most confident they'll win?)

Meanwhile... more studies. Yay. Consultants get rich.
Reply With Quote
     
     
  #3309  
Old Posted Dec 19, 2018, 12:34 AM
libtard's Avatar
libtard libtard is offline
Dahvie Fan
 
Join Date: Aug 2012
Posts: 1,307
2 HOV lanes and 8 general purpose lanes for the new Massey bridge makes sense. Anything less would be short sighted
Reply With Quote
     
     
  #3310  
Old Posted Dec 19, 2018, 4:01 AM
WarrenC12's Avatar
WarrenC12 WarrenC12 is online now
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,559
Quote:
Originally Posted by libtard View Post
2 HOV lanes and 8 general purpose lanes for the new Massey bridge makes sense. Anything less would be short sighted
At what cost?
Reply With Quote
     
     
  #3311  
Old Posted Dec 19, 2018, 6:13 AM
GlassCity's Avatar
GlassCity GlassCity is offline
Rational urbanist
 
Join Date: Aug 2012
Location: Metro Vancouver
Posts: 5,270
Disappointing to see the recommendation against the transit provisions, but this seems like the type of project that'll go through 20 more design iterations, governments and studies before it's built so I'm not gonna put too much stock into any of this.
Reply With Quote
     
     
  #3312  
Old Posted Dec 19, 2018, 8:33 AM
Firebrand's Avatar
Firebrand Firebrand is offline
D-Class Suburbanite
 
Join Date: Mar 2018
Location: Langley, BC
Posts: 590
Quote:
Originally Posted by Mininari View Post
Meanwhile... more studies. delays. Yay. Consultants get rich.
FTFY.

Quote:
Originally Posted by libtard View Post
2 HOV lanes and 8 general purpose lanes for the new Massey bridge makes sense. Anything less would be short sighted
This is the NDP we’re talking here. They’ll do anything to half-ass the project. They’ll at best put 6 car lanes and 2 bus lanes, but they’ll most likely put 6 lanes altogether.

Seriously, the NDP are completely oblivious of the transit aspects of the GMB. What has gotten on their thick minds on not getting it built correctly? They’re focusing WAY too much on their ridings.
Reply With Quote
     
     
  #3313  
Old Posted Dec 19, 2018, 1:20 PM
M00dy M00dy is offline
Registered User
 
Join Date: Nov 2016
Posts: 136
Quote:
Originally Posted by WarrenC12 View Post
Reasonable from a cost perspective. I'm sure they can be made to modern seismic standards.

Part of the reason the GMB proposal was so massive and expensive is because of how high it needed to go, and how much ground level work needed to be done due to where they were building.

It's also the reason a tunnel was built in 1959.
"Reasonable from a cost perspective."
Really? Because from what i've read any tunnel built to the same modern seismic & structural standards would be more expensive than a bridge, not less.

"I'm sure they can be made to modern seismic standards."
I'm not an expert in tunnelling, but remember that the area we're talking about is in fraser river silt/sand that will liquify in a major earthquake. When you build a bridge on friction piled foundations that can be addressed. How do you improve your substrate when tunnelling through weak soil?

"Part of the reason the GMB proposal was so massive and expensive is because of how high it needed to go, and how much ground level work needed to be done due to where they were building."
Remember the tunnel will also have to go deep to get under the river, and long trenched viaducts are required to do so.

I would be shocked if an equivalent tunnel is cheaper than a bridge. Tunneling is also FAR higher risk during construction.
Reply With Quote
     
     
  #3314  
Old Posted Dec 19, 2018, 3:03 PM
Metro-One's Avatar
Metro-One Metro-One is offline
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 17,917
So essentially the majority of the savings / shortcuts identified in the document are value engineering, increasing environmental impacts, taking land out of the ALR, and reducing the scope of transit...

The idea of putting the towers within the river, while they have a higher environmental risk, is the only cost reduction listed (along with reducing the lanes from 10 to 8) that I can support.

Building the rout on a new alignment? Nope. That will create unnecessary curves in the highway and will require the destruction of a decent chunk of ALR.

Severely reducing the interchange designs and adding to the current hodgepodge of a highway? (It literally states the idea of retaining some of these old under-built overpasses) Nope. The entire highway given its age is in need of an entire overhaul as originally proposed.

Using the shoulders for bus lanes? Oh God No! Essentially it states retaining the status quo for the bus transit system. Here the report feels as if some underhanded work is at play. All of the major bus transit systems I have seen that are beyond tacked on panted lines or random queue jumpers travel along dedicated lanes with dedicated stations, and on a freeway this requires to be on the median in a FULL lane. Not a shoulder shared with broken down vehicles and cutting across on and off ramps.

These are all very poor value engineering ideas. I don't even need to mention the option of retaining the tunnel.

Build it once, build it right. No more gluing shit on the side and patching with duct-tape for this highway and crossing.
__________________
Bridging the Gap
Check out my Flickr: https://www.flickr.com/photos/30634635@N03/with/29495547810/ and Youtube channel https://www.youtube.com/channel/UCV0_0h9qKlhxXFxuAey_q6Q
Reply With Quote
     
     
  #3315  
Old Posted Dec 19, 2018, 4:26 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is online now
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,559
Quote:
Originally Posted by M00dy View Post
"Reasonable from a cost perspective."
Really? Because from what i've read any tunnel built to the same modern seismic & structural standards would be more expensive than a bridge, not less.

"I'm sure they can be made to modern seismic standards."
I'm not an expert in tunnelling, but remember that the area we're talking about is in fraser river silt/sand that will liquify in a major earthquake. When you build a bridge on friction piled foundations that can be addressed. How do you improve your substrate when tunnelling through weak soil?

"Part of the reason the GMB proposal was so massive and expensive is because of how high it needed to go, and how much ground level work needed to be done due to where they were building."
Remember the tunnel will also have to go deep to get under the river, and long trenched viaducts are required to do so.

I would be shocked if an equivalent tunnel is cheaper than a bridge. Tunneling is also FAR higher risk during construction.
Why would the tunnel need to be any deeper than the current one?

Bottom line is the BC Libs never gave us the costed options, and that's most of the reason we're in this mess.
Reply With Quote
     
     
  #3316  
Old Posted Dec 19, 2018, 4:35 PM
moosejaw moosejaw is offline
Registered User
 
Join Date: Apr 2012
Location: Miami
Posts: 482
Quote:
Originally Posted by WarrenC12 View Post
Why would the tunnel need to be any deeper than the current one?
If you didnt read his statement. let me make it bigger for you

Remember the tunnel will also have to go deep to get under the river
Reply With Quote
     
     
  #3317  
Old Posted Dec 19, 2018, 4:40 PM
CanSpice's Avatar
CanSpice CanSpice is offline
Registered User
 
Join Date: Dec 2014
Location: New Westminster, BC
Posts: 2,708
Quote:
Originally Posted by moosejaw View Post
If you didnt read his statement. let me make it bigger for you

Remember the tunnel will also have to go deep to get under the river
That's a statement. Why is that statement taken as true? Why can't the new tunnel be at the same depth as the current one?
Reply With Quote
     
     
  #3318  
Old Posted Dec 19, 2018, 4:57 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is online now
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,559
Quote:
Originally Posted by moosejaw View Post
If you didnt read his statement. let me make it bigger for you

Remember the tunnel will also have to go deep to get under the river
Says who? Some internet guy? Citation needed.
Reply With Quote
     
     
  #3319  
Old Posted Dec 19, 2018, 5:09 PM
misher's Avatar
misher misher is offline
BANNED
 
Join Date: Jul 2018
Posts: 4,537
Quote:
Originally Posted by WarrenC12 View Post
Why would the tunnel need to be any deeper than the current one?

Bottom line is the BC Libs never gave us the costed options, and that's most of the reason we're in this mess.
I remember there were discussions about allowing larger hull ships through.
Reply With Quote
     
     
  #3320  
Old Posted Dec 19, 2018, 6:14 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is online now
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,559
Quote:
Originally Posted by misher View Post
I remember there were discussions about allowing larger hull ships through.
But there's also plenty of clearance with the current tunnel.

If bigger ships are the reason, perhaps those bigger ships and their beneficiaries should help pay the additional cost.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 8:01 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.