Quote:
Originally Posted by stump
I wonder which disappointing underbuilt option will be selected.
|
Yeah, I wonder how many hundreds of millions / billions are going to be pissed away for an option that will offer a minimal temporary relief?
Let’s place bets on the options:
Simply upgrading then existing tunnel with no new lanes / capacity I give a 95% chance of being on the list.
Adding a new 2 lane tunnel with bike / pedestrian access, 85% chance.
Adding a new 4 lane tunnel with rapid bus but minimal interchange improvements, 60% chance.
A weird odd lane system (7 lanes?) that still uses a terrible counter flow system (at the expense of a streamlined rapid bus system), 60% chance.
After this we actually enter half decent solutions.
Completely new 6 lane tunnel or bridge that can be expanded to 8 lanes in the future with rebuilt interchanges and rapid bus capability, 50% chance.
A new 8 lane bridge (upon opening day) with a rapid bus system and re-built interchanges (which is the ideal solution) 20% chance
An entirely new route, 5% chance.
The original project, 0.00001% chance.