Quote:
Originally Posted by OTSkyline View Post
I would be tempted to say bulldoze and build new but $38M for new construction? That seems a bit steep, no? I would have thought they could have built something great for half that price!
I think it is because they are fixed on the idea that it needs to be made of stone:

Quote:
Originally Posted by rocketphish View Post
Mortar holding the limestone blocks is in poor condition and in some cases is missing completely. An engineering report says the limestone blocks are poor-quality stone prone to cracking, and the stones themselves are crumbling as water gets in and repeatedly freezes and thaws.

“To rebuild the structure using a different stone from a different quarry — that is both very expensive and it’s not actually very authentic from a point of view of heritage conservation,” Jeanes said.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & Urban Ottawa
Forum Jump



Forum Jump


All times are GMT. The time now is 4:18 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.