Quote:
Originally Posted by lrt's friend
I want to point out that the indefinite delay in addressing transportation needs of the south end has become a major election issue. It will be interesting to see who gets elected in that ward in the upcoming election.
What we did seemed an appropriate adjustment of priorities according to O'Brien and most of the electorate in 2006. Unfortunately, what the city did is stick its head in the sand and failed to provide a proper alternative to the cancelled 2006 plan. In fact, it mostly ignored transportation requirements in that part of the city entirely. We have created a mess and I don't believe that the second rate alternative that may finally open in 2021 will address the needs that have grown since 2006. It is too bad.
It does not matter where the greatest demand is. It is where the greatest need is. Trying to move 100,000 people on a two lane country road network clearly does not work.
|
Good Day.
Agreed, but.
The Chiarelli plan was fine in it's original plan to Bayview transit station, and the first modification to extend to Lebreton at Booth (now Pimisi, in effect). It solved the majority of the pressing needs to the southern transit access. It would have been great.
It did leave that last leg into downtown unanswered, but he was trying to get it started.
Unfortunately, he was worse than Jimmy at trying to cheap out when he went to extend into downtown (second mod - to Mackenzie King Bridge, third mod - to uOttawa) along Albert/Slater, instead of tunnelling. This was and would have been the disaster. Utter Folly !! And it would have poisoned the well for any appetite to create a larger system for two decades.
O'Brien, and the contractor both, did try to save the plan to the first mod version - Lebreton/Booth, but even that much had been poisoned by that time - agreed that that was bad.
Overall, eveything was delayed by five years, and 36 million dollars.
NoJoy!