Quote:
Originally Posted by Truenorth00 View Post
How much do reduced loads really matter at launch? You still have to run the same peak schedules. If you break down, you'll still have to the same mitigation plan in place. The only difference is fewer pissed off riders possibly.
That, and any benefit of launching during a "low" period is going to be more than compensated for by the gee-wiz-new-train-smell curiosity that will attract people to ride the rails, even if only once.
__________________
___
Enjoy my taxes, Orleans (and Kanata?).
     
     
  #8362  
Old Posted Oct 5, 2018, 12:25 AM
Truenorth00 Truenorth00 is offline
Registered User
 
Join Date: May 2017
Posts: 29,051
Quote:
Originally Posted by Uhuniau View Post
That, and any benefit of launching during a "low" period is going to be more than compensated for by the gee-wiz-new-train-smell curiosity that will attract people to ride the rails, even if only once.
True. Heck. Just look at how many people took in Kontinuum just out of curiosity of getting underneath the city. So first day might well be packed even when school or work isn't on.

I mean, if they really wanted to get some flex, launch on a long weekend. Like say the Saturday of family day in Feb or on Good Friday. Get all the curious out of the way. Lower loads. Etc.
     
     
  #8363  
Old Posted Oct 5, 2018, 12:30 AM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by Uhuniau View Post
That, and any benefit of launching during a "low" period is going to be more than compensated for by the gee-wiz-new-train-smell curiosity that will attract people to ride the rails, even if only once.
Another benefit is that there will be a lot of confusion the first few days as people try to figure out how the system works. Having fewer people riding will help distribute that confusion.
     
     
  #8364  
Old Posted Oct 5, 2018, 4:47 PM
CityTech CityTech is offline
Registered User
 
Join Date: May 2016
Location: Ottawa
Posts: 2,798
They should launch on a Saturday, temporarily using rush hour frequencies for the first two days, so we can accomdate the inevitable rush of joy riders.
     
     
  #8365  
Old Posted Oct 5, 2018, 5:32 PM
scryer scryer is offline
Registered User
 
Join Date: Feb 2014
Posts: 1,964
I would personally avoid using the line for a week after launch, until everyone has calmed down a little.
     
     
  #8367  
Old Posted Oct 6, 2018, 8:04 PM
Truenorth00 Truenorth00 is offline
Registered User
 
Join Date: May 2017
Posts: 29,051
Really looks to be about a month away from completion. Whether they'll pass acceptance though is another question.
     
     
  #8368  
Old Posted Oct 7, 2018, 12:30 AM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,961
And Rideau. With the scaffolding gone, it's looking good.


https://www.otrainfans.ca/blogs/o-train-confederation-line-project-update-october-2-2018
     
     
  #8369  
Old Posted Oct 7, 2018, 1:17 AM
Truenorth00 Truenorth00 is offline
Registered User
 
Join Date: May 2017
Posts: 29,051
Quote:
Originally Posted by J.OT13 View Post

That picture really tells you how far behind they are. They could finish all those other stations by the end of October. That's pretty obvious. Rideau, not so much.
     
     
  #8370  
Old Posted Oct 9, 2018, 7:28 PM
AuxTown's Avatar
AuxTown AuxTown is offline
Registered User
 
Join Date: Apr 2006
Location: Ottawa, Canada
Posts: 4,634
Quote:
Originally Posted by J.OT13 View Post
Why are there no wires up at Rideau? Are they that far behind? Does that mean that no trains have gone West of there?
     
     
  #8371  
Old Posted Oct 9, 2018, 7:50 PM
CityTech CityTech is offline
Registered User
 
Join Date: May 2016
Location: Ottawa
Posts: 2,798
Quote:
Originally Posted by O-Town Hockey View Post
Why are there no wires up at Rideau? Are they that far behind? Does that mean that no trains have gone West of there?
Either they are there or the picture is old. It has been stated before that all tracks and wiring have been completed throughout the entire line.
     
     
  #8372  
Old Posted Oct 9, 2018, 7:59 PM
Spoonsy's Avatar
Spoonsy Spoonsy is offline
You call that a knife?
 
Join Date: Jul 2016
Location: Centretown West
Posts: 326
Quote:
Originally Posted by O-Town Hockey View Post
Why are there no wires up at Rideau? Are they that far behind? Does that mean that no trains have gone West of there?
They use rigid catenary in the tunnel which in that photo I think is that bar in front of the red fencing

example:
     
     
  #8373  
Old Posted Oct 9, 2018, 8:30 PM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by Spoonsy View Post
They use rigid catenary in the tunnel which in that photo I think is that bar in front of the red fencing
Correct. I believe the bars are actually over the centre of the rails, but the angle the picture is taken at makes them look to the side.
     
     
  #8374  
Old Posted Oct 9, 2018, 8:36 PM
HighwayStar's Avatar
HighwayStar HighwayStar is offline
Registered User
 
Join Date: Jul 2014
Location: PHX (by way of YOW)
Posts: 1,200
Quote:
Originally Posted by roger1818 View Post
Correct. I believe the bars are actually over the centre of the rails, but the angle the picture is taken at makes them look to the side.
When I asked exactly the same question a couple of months ago, OCCheetos helpfully posted this visual aid: http://forum.skyscraperpage.com/showpost.php?p=8279224&postcount=7775
     
     
  #8375  
Old Posted Oct 9, 2018, 11:39 PM
AuxTown's Avatar
AuxTown AuxTown is offline
Registered User
 
Join Date: Apr 2006
Location: Ottawa, Canada
Posts: 4,634
Thanks team!
     
     
  #8376  
Old Posted Oct 10, 2018, 3:53 PM
PHrenetic PHrenetic is offline
Registered User
 
Join Date: Jun 2016
Location: Ottawa
Posts: 1,029
Quote:
Originally Posted by Truenorth00 View Post
Absolutely. A year's delay in the grand scheme of things is not terminal.

The impact, however, is serious. This is the absolute core of Ottawa's network. The long construction period and delays, along with diversions do impact ridership. And the costs add up.

All that said, I'd rather they take the time to get it right than rush to handover. Having a system that breaks down constantly while new would really rob public confidence.
Good Day.

Knew I could find some of it somewhere.....
https://canada.constructconnect.com/dcn/...il-transit-construction-plans-dcn044283w

Quote:
Ottawa may speed up light rail transit construction plans
Daily Commercial News May 11, 2011

The City of Ottawa has published a staff report recommending the completion of a light rail system by the spring of 2018, a year earlier than originally scheduled.

The report, Ottawa's Light Rail Transit (OLRT) Project Schedule Acceleration and Procurement Option Selection, was submitted by Nancy Schepers, deputy city manager for infrastructure services and community sustainability/services to the city's finance and economic development committee.

It recommends that the city direct staff to accelerate the implementation of the Ottawa Light Rail Transit Project and contract the design and construction using a design-build-maintain model.

The RFP has not been issued yet.

Although the original completion data was planned for 2019, the new report recommends that the request for proposals give considerable weight to project scheduling and provide for nearly all downtown construction to be completed by the summer of July 2017, with stations and trains open for public viewing, in time for the 150th anniversary of Confederation.

Under the new proposal, the light rail would be operational by 2018.

The light rail project would be about 12.5 km long, between Tunney's Pasture and Blair Stations, primarily on the existing Transitway corridor. There will be 13 stations, four of which would be underground downtown in twin tunnels 3.2 km in length.

DCN DIGITAL MEDIA
The link in the article to the document does not work,
(( https://www.ottawa.ca/calendar/ottawa/ci...20-%20ACS2011-ICS-RIO-0001%20-%20LRT.htm ))
and I cannot find it in either my files (was too minor to copy at the time) nor the City system (of course).

So........ we are right on - the original - schedule, prior to the #### !!!!
     
     
  #8377  
Old Posted Oct 10, 2018, 4:57 PM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,075
Quote:
Originally Posted by CityTech View Post
Either they are there or the picture is old. It has been stated before that all tracks and wiring have been completed throughout the entire line.
Also trains keep appearing on the surface west of the tunnel.
__________________
___
Enjoy my taxes, Orleans (and Kanata?).
     
     
  #8378  
Old Posted Oct 10, 2018, 7:05 PM
AuxTown's Avatar
AuxTown AuxTown is offline
Registered User
 
Join Date: Apr 2006
Location: Ottawa, Canada
Posts: 4,634
I know we are all impatient, but this is a pretty cool time for Ottawa. It seems like ages since O'Brien nixed the original surface LRT plan and set us back 10 years but it's all coming together now. It has been a tedious process but we are already starting to see the TOD that "big cities" are made of. I don't have anywhere to go on transit these days, but I will def go for a ride ASAP when it opens.
     
     
  #8379  
Old Posted Oct 10, 2018, 8:04 PM
OtrainUser OtrainUser is offline
Registered User
 
Join Date: Jul 2017
Posts: 619
Quote:
Originally Posted by O-Town Hockey View Post
I know we are all impatient, but this is a pretty cool time for Ottawa. It seems like ages since O'Brien nixed the original surface LRT plan and set us back 10 years but it's all coming together now. It has been a tedious process but we are already starting to see the TOD that "big cities" are made of. I don't have anywhere to go on transit these days, but I will def go for a ride ASAP when it opens.

The original plan was a bad one thats why it was nixed. Surface LRT would not have worked in a city like Ottawa and Obrien knew that which is why he went with a fully grade separated system that will be immune to traffic.

Chiarelli's orginal plan did nothing to solve the bus clog downtown which needed to be addressed first. So good for Obrien for putting transit users first for a change which guarantees more rapid transit extensions in the future.
     
     
  #8380  
Old Posted Oct 10, 2018, 8:53 PM
CityTech CityTech is offline
Registered User
 
Join Date: May 2016
Location: Ottawa
Posts: 2,798
It's unfortunate because the first LRT plan was actually a decent plan, just not as a first phase. If the current plan was already built, the Chiarelli 2006 plan would have been great. Better service along the Trillium trunk and to the south end, and a surface route through downtown could have been convenient for shorter trips in the downtown core, once the massive bus jam on Albert-Slater was removed. But with the Albert-Slater jam there, adding a tram to it would have just been a nightmare.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 8:16 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.