Quote:
Originally Posted by lrt's friend
I have not said that at any time other than questioning the need for the Trim extension and the Airport spur as a higher priority. I also recognize that special funding has pushed these latter two projects to the next priority.
|
It's not so much "next priority" as an add-on to the next priority. If you're building LRT to Place D'Orleans, adding a short extension to Trim is not that much more work. And also helps optimize support provisions like parking lots. Likewise, if you're going to Leitrim, it's not a stretch to go through Riverside South and add that short extension.
Quote:
Originally Posted by lrt's friend
My thoughts for solutions were always longer term. I expressed my concerns because there are real present day issues with the set up. If people do not speak up, nobody will address weaknesses in any sort of timely fashion. We all know that there is close to a 10 year lead time to plan and build significant rail improvements.
|
You don't need a 10 year lead to double track and electrify a line though. The long lead times for most rail lines usually happens because getting a corridor involves significant time and money. Building on an existing corridor is substantially easier.
Quote:
Originally Posted by lrt's friend
My viewpoint has been expressed over and over again because the experts have said that the current plan for the Trillium Line will suffice until 2048. That is strictly an engineering response. It does not address the reality that the Trillium Line service will not be frequent enough to offer true trunk line service that will be attractive to enough residents in the part of the city that it is designed to serve. Despite your comments, I highly doubt that double tracking will take place until there is no other choice, which will in the end limit ridership growth potential.
|
I agree. Which is why I've said that I hope they address this in Stage 3. What people like you should be asking is why heck they are thinking about going past Terry Fox in Stage 3 before building to Barrhaven and twin tracking the Trillium Line (electrification can probably be saved for Stage 4).
Quote:
Originally Posted by lrt's friend
You have spoken about transfers and the need for frequency to make them reliable and attractive. I agree. The issue is a 5 minute train to a 12 minute train to a 30 minute local bus does not provide reliable service. Maybe our mental arithmetic will work some of the time, but other times the rider will be literally left sitting on the side of the tracks.
|
Where is it that you have a bus route with 30 min headways at a Trillium line station? And why would that still be the case after we've freed up hundreds of buses from the downtown core?
Quote:
Originally Posted by lrt's friend
You have also scoffed at my comments about future problems with the Bayview transfer. But if the Trillium Line expansion is successful and a full FLIRT train arrives at Bayview, how will they all get on the next Confederation Line train? Then if we add in Gatineau trains as well at the same location? My point is not about tomorrow, but maybe in 10 or 20 years. But we are heading towards a day when Bayview will be problematic.
|
The exact same way people transfer to buses at Bayview today. You just have to make sure there's enough capacity left at Bayview to accommodate riders getting on Bayview. A relief line only enters the discussion when that capacity can't be built in. If we start running 5 car trains with 2 min headways, after implementing ATC and lengthening Confederation Line platforms as necessary, capacity would be greater than 40 000 pphpd. I struggle to see any scenario in my lifetime where the combination of riders from the West, the South and Gatineau overwhelms that much capacity at Bayview. If we were even close to that, the discussion would be moving well past LRT, and we'd probably be talking about a second subway on Carling, converting the Southeast Transitway to LRT and maybe even a Bank St. subway at that point.