Quote:
Originally Posted by White Pine
If they ended all of the Quebec lines at a multi-modal hub at Bayview it might work. That would increase the need for the 2nd lrt crossing, though.
|
Except Bayview cannot be a rail hub. There is not enough space for a rail yard for all the terminating trains. Trains would have to operate with through routing. A storage and maintenance facility would have to be located well away from the centre of the city.