Quote:
Originally Posted by bradnixon
I understood that Stage 2 was to include a complete replacement of the Trillium Line signalling system, so I was assuming (hoping?) that the 30-second delay would no longer be required with a new system?
|
Good Day.
Full replacement of signalling, yes - it will be easier for the new PPP operator to have a consistent system over the entire T-Line.
They will also be extending most of the passing sidings to the max possible; that will allow some easing of operational speeds.
Reduction of the 30 second rule, maybe - it will depend on if they go to a CBTC like system and any SOR rule changes that that might allow.
This is where they REALLY need to / should double track Bayview terminus. It would eliminate at least one bottleneck. IMHO.
Other experts ?