Quote:
Originally Posted by roccerfeller
I expect it to be negligible - and the benefits of having a connected, vibrant downtown are more tantalizing.
|
The fact of the matter is having Portage and Main closed to pedestrians primarily isolates four buildings downtown. The BellMTS tower/BMO office, the Fairmont, the Richardson and the building next to the Richardson building. Everything else is already connected to downtown. Further, the Richardson effectively is faced onto the Exchange for pedestrians. I know most of the people on this forum never actually
walk downtown, in the Exchange, etc so they don't know that.
Opening up a single intersection to pedestrians is not going to be any more of a fix for the issues with downtown as mega projects before it were supposed to be, such as Portage Place. The issues with downtown Winnipeg are far deeper than if a single intersection is open or closed to pedestrians.
As a tax payer there are limited amount of funds to spend on projects and Portage and Main fails to make my long list, never mind my short list. The top of my list would be rapid transit, finish the SW line, get the east line built and use the ROW set aside for the NE line before someone gives that away like the River Heights ROW that was supposed to be for Route 90 upgrades.
The other big project on my list would be to get serious about the inner ring road network and making it limited access. We already have development threatening the ROW for both the east and west extensions for CPT. We lost the ROW for the planned north-south route on the east side and there are complaints from residents over the proposed west route as the ROW was not properly preserved.
When we don't have proper transportation routes people take alternate routes down residential streets and through school zones putting lots of people at risk.
The other high target on my list is addressing the situation with the rail network in the city. We need a strategy across the board on how to deal with the current situation and simply saying "kick it all out" isn't the answer. There needs to be a plan in place on how it will be moved out, where the east-west line will move to and how it will be remediated where it ends up. That likely means Winnipeg tax payer money going to projects outside city limits for the greater good of the city.
On the longer list ahead of opening Portage and Main for me is reviewing the flood proofing strategy so there doesn't need to be another knee jerk reaction on diverting a river away from Winnipeg and flooding out thousands of other homes "to save Winnipeg" like what happened in 2011.
But yes, by all means less push the current mayor's vanity project to the top of the list as we do not have any other pressing issues which should have funding priority.