Quote:
Originally Posted by PHrenetic
Good Day.
Redundant elevators are an absolute necessity, and always have been and should have been.
That "workaround" was always at the least a major flaw, and IMHO a major piece of $#!^
And, it may have been 'sufficient' for those who were on the T-Way looking to get off,
but an even yet more major 'inconvenience' for those looking to get onto the T-Way.
It should never have been allowed. It reflected one of the major flaws in the T-Way service, and is a mentality still reflected in the approach to service, convenience, and safety upcoming for the O-Train - that is, get away with the least possible.
Even the major stations have really only the barest possible redundancies and max-out capacity overage handing capabilities.
This one certainly hopes that as more CBD buildings link up to the stations, they will build in more capacity.
Hope!
|
I'm glad the City opted to build a minimum of two elevators per platform. I agree, this is an absolute necessity. If you're in crutches, or in a wheelchair, or use a walker, you don't want to use the workaround hack.
In defence of the Transitway though, it's pretty amazing that they did include an elevator at each station, failures aside. Consider this; when Montreal built the Metro's Blue Line around the same time as Ottawa's Transitway, they din't include any elevators whatsoever. And Vancouver's Skytrain, also built in the 80s, didn't have an elevator at Granville (space issues apparently). Vancouver fixed the one flaw in the mid-2000s, but Montreal is still wwwwaaaaaayyyyyy behind.