Old Posted May 28, 2018, 7:59 PM
kmcamp kmcamp is offline
Registered User
 
Join Date: Sep 2016
Posts: 1,401
Quote:
Originally Posted by J.OT13 View Post
Where will the bike path go after Stage 2?
I don't think anyone knows yet, there hasn't been any details of the addition to the station other than we know that there's a second platform going in. Given that this is the terminus for the Trillium Line for the known future (unlike Tunney's), I wonder how they plan to handle the side-platform issue.
     
     
  #7282  
Old Posted May 28, 2018, 8:16 PM
Truenorth00 Truenorth00 is online now
Registered User
 
Join Date: May 2017
Posts: 29,011
Quote:
Originally Posted by Acajack View Post
I am kind of shocked that Rideau is not higher up on the list. Any obvious reason that I am missing?
I'm not. Rideau may get lots of ridership through the day. But it won't have anywhere close to the top in peak AM ridership. It's not close to most of the large office buildings. And post-opening, it's not keeping any of the STO traffic. So essentially, it's reduced to serving the market, the mall, NDHQ and City Hall.

I expect though that Rideau to have fairly high total ridership. It'll just be spread out through the day.

Quote:
Originally Posted by JHikka View Post
This list is only AM peak. I'm guessing Rideau will be busier in PM as people make their way to Market/Rideau Centre.

Rideau will also be busier on weekends than Parliament/Lyon, presumably, for this reason.
PM peak may be a tad higher. But I doubt you'll see Rideau displace Baseline above it. Rideau is just going to have a very different usage pattern than the rest of the line. Probably more consistent ridership throughout the day and less of large jump at peak. It may well have a shifted peak, with more ridership coming in closer to 9-930 when the mall actually opens.
     
     
  #7283  
Old Posted May 28, 2018, 8:18 PM
Truenorth00 Truenorth00 is online now
Registered User
 
Join Date: May 2017
Posts: 29,011
Quote:
Originally Posted by acottawa View Post
Most of the inter-provincial transfers are moving to Lyon. Not much daily ridership (people using the station 10x per week).

I suspect they may be underestimating people getting off to pop in for something, but I think that might depend on how efficient the escalators are.
Morning stops aren't likely to be common. You're far more likely to get market and Farm Boy visits on the way home than on the way to work.
     
     
  #7284  
Old Posted May 28, 2018, 8:45 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,916
Quote:
Originally Posted by zzptichka View Post
You mean E-W path after POW extension?
Under the tracks would be my guess.
I figured the MUP would go under the tracks when Trillium is extended to Gatineau. It's the MUP going under Bayview Station that I'm questioning, with the addition of a track and side platform.
     
     
  #7285  
Old Posted May 28, 2018, 10:34 PM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,072
Quote:
Originally Posted by acottawa View Post
Lyon will pick up a lot of STO transfers as well as some of the OC Transpo routes coming from the west end. Parliament is the closest station fro a pretty small area (Elgin is closer to Rideau) whereas Lyon is the closest station for the whole west side of centretown.
Elgin might be closer to Rideau, but the walk to a station is still more pleasant to Parliament.
__________________
___
Enjoy my taxes, Orleans (and Kanata?).
     
     
  #7286  
Old Posted May 28, 2018, 11:10 PM
kmcamp kmcamp is offline
Registered User
 
Join Date: Sep 2016
Posts: 1,401
Quote:
Originally Posted by Uhuniau View Post
Elgin might be closer to Rideau, but the walk to a station is still more pleasant to Parliament.
I agree. You can walk a two block straight line from O'Connor and Queen, or up from the deep depths of Rideau and then the round and circuituos route from Rideau either via Wellington or through the mall and Confederation park. For the more southern parts of Elgin, uOttawa and the corkstown bridge is a nice walk
     
     
  #7287  
Old Posted May 29, 2018, 12:24 AM
Kitchissippi's Avatar
Kitchissippi Kitchissippi is offline
Busy Beaver
 
Join Date: Nov 2005
Location: Ottawa
Posts: 4,686
Quote:
Originally Posted by J.OT13 View Post
I figured the MUP would go under the tracks when Trillium is extended to Gatineau. It's the MUP going under Bayview Station that I'm questioning, with the addition of a track and side platform.
I think what we’ll see in the future would be the widening/replacement of the Albert-Scott street bridge to include segregated bike tracks, since both Segments are supposed to be eventually “complete-streeted”. If a West Wellington ped/bike bridge were also built it would make up for the tracks being an obstacle
     
     
  #7288  
Old Posted May 29, 2018, 1:08 AM
OCCheetos OCCheetos is offline
Registered User
 
Join Date: Aug 2017
Posts: 2,111
Quote:
Originally Posted by J.OT13 View Post
I figured the MUP would go under the tracks when Trillium is extended to Gatineau. It's the MUP going under Bayview Station that I'm questioning, with the addition of a track and side platform.
There's a pedestrian underpass just east of the platforms.
     
     
  #7289  
Old Posted May 29, 2018, 4:40 AM
Catenary Catenary is offline
Registered User
 
Join Date: Dec 2012
Posts: 1,402
Quote:
Originally Posted by kmcamp View Post
It's an accessibility feature. They are already becoming mandatory in the US:https://www.transit.dot.gov/regulations-...ers/lrt-vehicle-car-barrier-requirements

In our case, I don't think the OADA requires them yet, but might as well get ahead of an expensive lawsuit since I'm sure while the others don't have them yet, it'll quickly become mandatory. There was already the activist in Toronto trying to make centre platforms illegal (https://www.thestar.com/news/gta/2014/08...ible_says_blind_human_rights_lawyer.html)
Remember that OC Transpo does not fall under the purview of the AODA, though they follow it in spirit.

Quote:
Originally Posted by OCCheetos View Post
There's a pedestrian underpass just east of the platforms.
The overpass/tunnel was a late addition because the station entrance and courtyard will block where the path used to rub down between the Transitway and roadway.
     
     
  #7290  
Old Posted May 29, 2018, 10:40 AM
kmcamp kmcamp is offline
Registered User
 
Join Date: Sep 2016
Posts: 1,401
Quote:
Originally Posted by Catenary View Post
Remember that OC Transpo does not fall under the purview of the AODA, though they follow it in spirit
True, but that didn't stop the lawsuit that got automated bus announcements.

I'm fine with the intercar barriers and they are an inexpensive thing, I do wonder though if redundant elevators are truly necessary. It's a pain when.elevators are out of service, but there is a workaround of going one station past and switching back like in the existing transitway stations.
     
     
  #7291  
Old Posted May 29, 2018, 12:02 PM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by kmcamp View Post
I do wonder though if redundant elevators are truly necessary. It's a pain when.elevators are out of service, but there is a workaround of going one station past and switching back like in the existing transitway stations.
That sounds great on paper, but what you are suggesting is that someone:
  1. get off the train and discover that the elevator is out of order,
  2. get on the next train to the next station,
  3. go up to the concourse level (assuming it has one),
  4. go down to the other platform,
  5. get on the next train back to the first station,
  6. get on the elevator to where they wanted to go in the first place

And that is assuming that none of the other 3 elevators are out of order, in which case they have to find yet another route.

It might be fine in a minor station that barely anyone will be using in the first place, but for most stations, redundant elevators aren't an issue with me.
     
     
  #7292  
Old Posted May 29, 2018, 12:43 PM
PHrenetic PHrenetic is offline
Registered User
 
Join Date: Jun 2016
Location: Ottawa
Posts: 1,029
Good Day.

Redundant elevators are an absolute necessity, and always have been and should have been.

That "workaround" was always at the least a major flaw, and IMHO a major piece of $#!^
And, it may have been 'sufficient' for those who were on the T-Way looking to get off,
but an even yet more major 'inconvenience' for those looking to get onto the T-Way.
It should never have been allowed. It reflected one of the major flaws in the T-Way service, and is a mentality still reflected in the approach to service, convenience, and safety upcoming for the O-Train - that is, get away with the least possible.
Even the major stations have really only the barest possible redundancies and max-out capacity overage handing capabilities.
This one certainly hopes that as more CBD buildings link up to the stations, they will build in more capacity.

Hope!
     
     
  #7293  
Old Posted May 29, 2018, 1:12 PM
McC's Avatar
McC McC is offline
Registered User
 
Join Date: Apr 2010
Posts: 3,057
Quote:
Originally Posted by PHrenetic View Post
Good Day.
It should never have been allowed. It reflected one of the major flaws in the T-Way service, and is a mentality still reflected in the approach to service, convenience, and safety upcoming for the O-Train - that is, get away with the least possible.
And yet here we are discussing a situation where they are not trying to get away with the least possible. But I agree with you, there should have been at least a third escalator for the downtown stations (that could just be turned off during the lowest demand periods).
     
     
  #7294  
Old Posted May 29, 2018, 3:43 PM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by McC View Post
And yet here we are discussing a situation where they are not trying to get away with the least possible. But I agree with you, there should have been at least a third escalator for the downtown stations (that could just be turned off during the lowest demand periods).
Or even a second for Lyon and Parliament stations so that you can use it to go down or up.
     
     
  #7295  
Old Posted May 29, 2018, 10:03 PM
kmcamp kmcamp is offline
Registered User
 
Join Date: Sep 2016
Posts: 1,401
Time for another round of everyone's favorite game: Guess the station floorplan!

I passed by uOttawa today and the hoarding around the entrance is gone, giving a clear view of the concourse. I noticed the concourse isn't very large, making me wonder where the retail space is supposed to be. I also wonder where the stairs at the South ends of the platforms go, they don't seem to link up with the concourse, and I'm guessing they are some sort of emergency exit, but I don't see where it would come out.
     
     
  #7296  
Old Posted May 29, 2018, 10:33 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,916
Quote:
Originally Posted by PHrenetic View Post
Good Day.

Redundant elevators are an absolute necessity, and always have been and should have been.

That "workaround" was always at the least a major flaw, and IMHO a major piece of $#!^
And, it may have been 'sufficient' for those who were on the T-Way looking to get off,
but an even yet more major 'inconvenience' for those looking to get onto the T-Way.
It should never have been allowed. It reflected one of the major flaws in the T-Way service, and is a mentality still reflected in the approach to service, convenience, and safety upcoming for the O-Train - that is, get away with the least possible.
Even the major stations have really only the barest possible redundancies and max-out capacity overage handing capabilities.
This one certainly hopes that as more CBD buildings link up to the stations, they will build in more capacity.

Hope!
I'm glad the City opted to build a minimum of two elevators per platform. I agree, this is an absolute necessity. If you're in crutches, or in a wheelchair, or use a walker, you don't want to use the workaround hack.

In defence of the Transitway though, it's pretty amazing that they did include an elevator at each station, failures aside. Consider this; when Montreal built the Metro's Blue Line around the same time as Ottawa's Transitway, they din't include any elevators whatsoever. And Vancouver's Skytrain, also built in the 80s, didn't have an elevator at Granville (space issues apparently). Vancouver fixed the one flaw in the mid-2000s, but Montreal is still wwwwaaaaaayyyyyy behind.
     
     
  #7297  
Old Posted May 29, 2018, 10:53 PM
kmcamp kmcamp is offline
Registered User
 
Join Date: Sep 2016
Posts: 1,401
Quote:
Originally Posted by kmcamp View Post
Time for another round of everyone's favorite game: Guess the station floorplan!

I noticed the concourse isn't very large, making me wonder where the retail space is supposed to be.
Although maybe I'm expecting to much. I keep thinking something like this at Vancouver's Granville station when I think of retail:



And so far the renderings from OC Transpo seem to be the previously mentioned stall in an underground car park, and this rendering of the "Harry Potter Cafe" under the stairs at hurdman

     
     
  #7298  
Old Posted May 30, 2018, 1:54 AM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by kmcamp View Post
Here is a larger rendition of that image.

     
     
  #7299  
Old Posted May 30, 2018, 7:32 PM
kmcamp kmcamp is offline
Registered User
 
Join Date: Sep 2016
Posts: 1,401
Went through the Sun Life Atrium today, and they've opened up the temporary wall in front of the Parliament station entrance. You can peek though now, but they had the metal rollup doors (which I guess they use to close off the Atrium outside of business hours) partially down, so couldn't see much. But it does feel like things are getting closer.
     
     
  #7300  
Old Posted May 30, 2018, 7:52 PM
zzptichka zzptichka is offline
Registered User
 
Join Date: Dec 2015
Location: Outaouias
Posts: 2,378

Jim Watson

@JimWatsonOttawa
How exciting! Nadia Myre's public art installation is taking place at #OttLRT's Pimisi Station and will add a culturally important element to the station. Learn more about Nadia Myre's pieces, their significance and background: https://t.co/Pz7A8ZuN90


     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 10:31 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.